Find a Carpenter you can trust in Todmorden.

Choose from 46 Carpenters, all rated by people like you.

Over 24 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

15 Jul

Garden | Decking

Todmorden - OL14

Enquiry from: Bella M

Start Date: Immediate

hello, i haven’t actually got the decking get ( or moved in to the house) but i like the look of accolade wood non slip. the company i’d be buying from don’t do the installation and i would defi...

Post a similar request >

26 Jun

Kitchen | Fitting

Todmorden - OL14

Enquiry from: Susan B

Start Date: Immediate

are you the property owner: owner of the property what level of service do you require: design only do you have all of the required materials for your kitchen already: no are you considering a design...

Post a similar request >

25 Mar

Kitchen | Fitting

Todmorden - OL14

Enquiry from: Joanne L

Start Date: 1 to 3 months

Home Owner Call to Appoint

Post a similar request >

06 May

Carpentry

Todmorden - OL14

Enquiry from: Steve R

Start Date: Immediate

Back door, hardwood, 4 panel, casing, white painted, complete with hardware and letter plate. Also double-glazed window to left of door, top opener 50-50 split, white painted, locking system. Installa...

Post a similar request >

10 Nov

Garden | Decking

Todmorden - OL14

Enquiry from: Christine A

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Detached Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

17 Nov

Kitchen | Fitting

Todmorden - OL14

Enquiry from: Elle K

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 86.79, Property type: Flat, apartment, Work description: Full kitchen removal and new B&Q kitchen installation...

Post a similar request >

08 Jan

Kitchen | Fitting

Todmorden - OL14

Enquiry from: Leonard H

Start Date: Immediate

Install new kitchen using existing appliances, and introducing washing machine and dryer.Cookers to be at high level, washing machine and dryer to stand side by side.Would prefer painted units ,and fo...

Post a similar request >

16 Mar

Kitchen | Fitting

Manchester - M24

Enquiry from: Joe M

Start Date: Immediate

Kitchen taking out, wooden floor to be laid and a kitchen to be installed.

Post a similar request >

18 Dec

Carpentry

Bury - BL9

Enquiry from: Michelle P

Start Date: Immediate

Shelf put up, repair loft ladder, replace a piece of architrave etc.

Post a similar request >

13 Dec

Kitchen | Fitting

Heywood - OL10

Enquiry from: John B

Start Date: Immediate

Kitchen fitting Kitchen design

Post a similar request >

05 Sep

Garden | Sheds

Manchester - M24

Enquiry from: Craig B

Start Date: Immediate

installation of a 10 x 8 summerhouse. are you the property owner: owner of the property what level of service are you looking for: install do you have a: large garden other forms: none agreed to rece...

Post a similar request >

16 Jun

Garden | Sheds

Manchester - M26

Enquiry from: Tony M

Start Date: Immediate

Assemble 8x6 metal garden shed

Post a similar request >

06 Sep

Garden | Sheds

Oldham - OL2

Enquiry from: Les H

Start Date: Immediate

old wooden shed dismantling and removing new 6×4 kelter plastic shed building are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: ...

Post a similar request >

17 Jun

Carpentry

Manchester - M25

Enquiry from: Elisabetta D

Start Date: Immediate

fitted wardrobes for bedroom.

Post a similar request >

10 Jun

Carpentry

Heywood - OL10

Enquiry from: Craig W

Start Date: Immediate

We would like a price for some fitted wardrobes and a media wall . We had a recommendation from Lindsey Ryan

Post a similar request >

26 May

Carpentry

Heywood - OL10

Enquiry from: Christine W

Start Date: Immediate

I require 6 internal doors to be hanged/fitted please

Post a similar request >

14 May

Carpentry

Manchester - M45

Enquiry from: Claire B

Start Date: Immediate

I need 3 doors plaining off as just had carpet installed In the kitchen i need shelves going up in the recess to accommodate storage please Thanks very much

Post a similar request >

26 Apr

Carpentry

Heywood - OL10

Enquiry from: Alison W

Start Date: Immediate

we need 2 doors planing after new carpet has been fitted. please could you let me know how much it would be are you the property owner: tenant (with permission) property type: other what type of job a...

Post a similar request >

16 Apr

Carpentry

Manchester - M9

Enquiry from: Ian B

Start Date: Immediate

Supply and fit an internal flush door.

Post a similar request >

13 Mar

Carpentry

Manchester - M24

Enquiry from: Alan T

Start Date: Immediate

Complete downstairs skirting board replacement (all skirtings were removed for other works to be done). living room, dining room, kitchen, hallway, toilet, under stairs cupboard. I would like some one...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Todmorden is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Todmorden £975-£2,495
Carpenters and joiners in Todmorden £375-£575
Plasterboard dry lining in Todmorden £638-£978
Wood flooring in Todmorden £750-£1,150
Wooden decking in Todmorden £1,125-£1,725
Garden shed in Todmorden £450-£690
Wooden window repair in Todmorden £320-£480

Related Carpenter searches in Todmorden

Carpenter FAQs

What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

Can I install wooden flooring myself?

Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look!  Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe.  Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs.  Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Todmorden.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Todmorden?

View our open Carpenter jobs near you

Join today
View Shortlist