Flooring | Wooden
London - W3
Enquiry from: Miryem B
Start Date: Immediate
i have already bought the floorboards i just need someone to fit them and fix the skirting boards too. it’s for a bedroom which i think is about 13.5 by 10feet.
Over 451 reviews & an average rating of 4.4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
London - W3
Enquiry from: Miryem B
Start Date: Immediate
i have already bought the floorboards i just need someone to fit them and fix the skirting boards too. it’s for a bedroom which i think is about 13.5 by 10feet.
London - W3
Enquiry from: Rachael M
Start Date: Immediate
rip and replace raised garden decking (wood) with 3 steps in my garden flat. approx. 10m2 are you the property owner: owner of the property property type: terrace what level of service do you require:...
London - W3
Enquiry from: Anna B
Start Date: Immediate
I suspect part of the window frame has started to rot and needs to be repaired.
Greenford - UB6
Enquiry from: Sandra D
Start Date: Immediate
removal of bamboo around back of shed and side. are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: removal of old other forms: ga...
London - W11
Enquiry from: Neil A
Start Date: Immediate
remove and replace electric hob with a new gas hob. I supply the hob new. Connect and
Greenford - UB6
Enquiry from: Sandra D
Start Date: Immediate
removal of bamboo around back of shed and side. are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: removal of old other forms: ga...
Greenford - UB6
Enquiry from: Nour A
Start Date: Immediate
i want to change my old tiles and remove the grass and replace it with artificial glass, also, remove all the tree from my garden are you the property owner: owner of the property property type: terra...
Greenford - UB6
Enquiry from: Nour A
Start Date: Immediate
i want to change my old tiles and remove the grass and replace it with artificial glass, also, remove all the tree from my garden are you the property owner: owner of the property property type: terra...
London - W5
Enquiry from: John J
Start Date: Immediate
we need someone who will remove an existing kitchen, prep for an install, and then install a kitchen based on the spec we will provide. we don’t need any appliances; these will be supplied by our de...
West Drayton - UB7
Enquiry from: Emma B
Start Date: Immediate
Hi, I am looking for someone to come out and quote for new flooring the reception area. We currently have tiles.
London - W3
Enquiry from: Gill S
Start Date: Immediate
garden design and fitting are you the property owner: owner of the property property type: semi detached roughly the size of your garden: 21-30 m2 garden type: back garden do you have a design: no, bu...
Greenford - UB6
Enquiry from: Haryton F
Start Date: Immediate
Hi To build stud partition wall, plasterboard, wal paper or skim and paint and to include one door with frame, architrave and door lock handle. Room width= 3.8m. Room height= 2.4m
London - NW10
Enquiry from: Max V
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Garden landscape Some decking work around 20m2 Plus path and some planting ...
London - W5
Enquiry from: Evelyn A
Start Date: Immediate
need to do decking in my garden are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint
London - W5
Enquiry from: Evelyn A
Start Date: Immediate
need to do decking in my garden are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint
London - W5
Enquiry from: Evelyn A
Start Date: Immediate
need to do decking in my garden are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint
London - W5
Enquiry from: Evelyn A
Start Date: Immediate
need to do decking in my garden are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint
London - W7
Enquiry from: Deanne E
Start Date: Immediate
old shed dismantled and new larger shed put up. already have concrete base are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: remo...
London - W13
Enquiry from: Martin M
Start Date: Immediate
Customer made enquiry for Kitchen Fitting quotes online. Homeowner lives in London area. Please call to arrange appointment
Greenford - UB6
Enquiry from: Blossom J
Start Date: Immediate
lARGE STORAGE SHED 20 FTX 10 FT
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Ealing | £1,475-£3,665 |
| Carpenters and joiners in Ealing | £375-£575 |
| Plasterboard dry lining in Ealing | £638-£978 |
| Wood flooring in Ealing | £750-£1,150 |
| Wooden decking in Ealing | £663-£3,363 |
| Garden shed in Ealing | £300-£545 |
| Wooden window repair in Ealing | £320-£480 |
Check your Price's door installation cost calculator and charges guide will allow you to estimate both typical labours only costs for door hanging & installations, renovations and repairs as well as the total estimate for comprehensive door installation projects.
• Door & Frame Installation Job and the average Cost in £'s
• uPVC door installation including glazing & architrave costs around £90 per door
• uPVC french & patio door sets including glazing & architrave costs around £120 per pair
• Softwood french & patio door sets including architrave costs around £180 per door
• Hardwood french & patio door sets including architrave would cost around £250 per pair
• Softwood internal door hanging only would be around £40 per door
• Hardwood internal door hanging only would set you back around £48 per door
• Softwood external door hanging only is around £60 per door
• Hardwood external door hanging would cost around £70 per door
• Locks, letterboxes & door furniture timber doors are around £15 per Item
• Glazing £15 per pane
• Brick cut-outs single doors is around £60 per cut-out
• French or patio door brick cut-outs will be around £90 per cut-out
• New lintels will cost around £150 per lintel
Door Repair Costs and Charges
Estimate door mending labour charges by totalling the unit costs of the mandatory jobs. The complete door repair cost includes the total labour charge plus the cost of all parts, fixtures and fittings. A call out charge may be added on jobs totalling less than £100.
Average Cost of Door Repair Job
Replacement glazing units for uPVC doors will be around £15 per unit
Replacement glazing units for timber doors is around £20 per unit
Replacement door glass pined & putty will cost£30 per pane
Replacement handles are around £10 each and general repair work will cost you £25 per hour
Building & FENSA certificate charges
FENSA certificates are obligatory for maximum door replacements and new build setting up prices differ from council to council.
Average Cost of Window Repair Job: One to two doors will cost around £85
Average Cost of Door Fixtures & Fittings Removal Job
Removing internal doors will cost around £10
Removing internal door liners will cost around £15
Removing external timber doors will cost about £10
Removing External timber door frame will be around £20
Removing external uPVC door & frame removal will be around £30 and Rubbish disposal will cost £150 per ton.
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
How Much Is Plasterboard?
Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.
A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!
• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.
• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.
• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Ealing.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today