Find a Carpenter you can trust in Tower Hamlets.

Choose from 207 Carpenters, all rated by people like you.

Over 366 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Essex Loft Extensions

0 review(s)
Offers services in TOWER HAMLETS
Essex Loft Extensions was founded by a team of experienced local builders with a shared passion for residential constructi...
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in TOWER HAMLETS
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 10 Reviews

CRS Contractors

19 review(s)
Offers services in TOWER HAMLETS
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified Pro

The Driveway Studio

1 review(s)
Offers services in TOWER HAMLETS
The Driveway Studio Ltd is your local specialist in resin driveways, tarmac, block paving, patio slabs, gravel driveways, ...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

Furnish Home.

0 review(s)
Offers services in TOWER HAMLETS
We Provide Loft Conversions, Boarding, Loft Insulation, Hatch, Ladders, Velux, plasterboarding & Loft Storage Solutions in...

Recent Carpenter Enquiries

09 May

Garden | Sheds

London - E16

Enquiry from: Duc V

Start Date: Immediate

Make the concrete Shed floor

Post a similar request >

12 May

Garden | Decking

London - E14

Enquiry from: Sahanara R

Start Date: Immediate

garden patio and cleaning weed disposing waste and rubbish designing a small theme for corner of garden are you the property owner: tenant (with permission) property type: other do you have a: small g...

Post a similar request >

12 May

Garden | Decking

London - E14

Enquiry from: Sahanara R

Start Date: Immediate

customer in the london area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prop...

Post a similar request >

21 Jun

Garden | Decking

London - E16

Enquiry from: Theresa T

Start Date: Immediate

customer made an online enquiry for wooden decking and confirmed on telephone and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are yo...

Post a similar request >

08 Nov

Carpentry

London - E1

Enquiry from: James C

Start Date: Less than one month

i need a fd30 fire door installed for the kitchen. please quote with and without the door. are you the property owner: owner of the property property type: terrace what type of job are you looking to...

Post a similar request >

10 Aug

Flooring | Wooden

London - E14

Enquiry from: Amy W

Start Date: Immediate

several pieces of my floor were burnt accidentally and there were several blackened marks on the wooden floor, please contact me via email are you the property owner: relative of owner how many rooms...

Post a similar request >

29 Apr

Carpentry

London - E4

Enquiry from: Melanie O

Start Date: Less than one month

one door has come off the hinges. however, i would rather replace the whole door and potentially replace the other internal doors so that they match. this would be 4 or 5 in total. are you the propert...

Post a similar request >

19 Apr

Kitchen | Fitting

London - E3

Enquiry from: Kay K

Start Date: Immediate

A Franke Ceramic sink and Quooker Flex tap installation

Post a similar request >

05 Apr

Kitchen | Fitting

London - E4

Enquiry from: Fiona E

Start Date: Immediate

refitting an inter grated fridge in to cupboard. are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials for your...

Post a similar request >

18 Jan

Kitchen | Fitting

London - E4

Enquiry from: Susan N

Start Date: Immediate

fit kitchen which is approx 298 cm x 246. i have a design of where i want the cupboards which there are 11. the property will be rented so i am looking at budget type kitchens ikea or b & q are you ...

Post a similar request >

10 Nov

Kitchen | Fitting

London - E4

Enquiry from: Somasundaram B

Start Date: Immediate

customer in london area made an enquiry for kitchen design & installation online. please call to arrange an appointment to discuss options are you the property owner: owner of the property what level...

Post a similar request >

25 Sep

Garden | Sheds

London - E4

Enquiry from: Lydia B

Start Date: Immediate

to build a 7ft x 4ft metal fence today please. are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: install please call to appoint

Post a similar request >

18 Jun

Garden | Decking

London - E15

Enquiry from: Maria F

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Small garden with a large bay leaf tree needs cutting and pruning Wild c...

Post a similar request >

31 May

Garden | Sheds

London - E4

Enquiry from: Aimee B

Start Date: Immediate

would like a pond restored/ cleaned. it's about 2.5 x 1.5 metres. there's no pump, but there are disconnected wires and a switch for the pond in the nearby shed (from previous owners) so we would like...

Post a similar request >

25 Feb

Interior work | Stud Walls

London - E4

Enquiry from: Gus J

Start Date: Immediate

I need 3 stud walls erected timber and plasterboard, sizes as follows: 3m x 2.5m 4m x 2.5m 1.2m x 2.5 I have 2 internal walls built of concrete blocks that I want them cladded by plasterboard ...

Post a similar request >

26 Jan

Interior work | Stud Walls

London - E2

Enquiry from: Lucy W

Start Date: Immediate

534 sq m of stud wall with soundproofing , cladding , skirting , painting white . 12 doors and door frames are you the property owner: tenant (with permission) property type: commercial how many diffe...

Post a similar request >

25 Jan

Flooring | Wooden

London - E14

Enquiry from: Thomas L

Start Date: Immediate

replace carpet with wood flooring are you the property owner: owner of the property how many rooms are you looking to update with wood flooring: 3-4 rooms what level of service do you require: supply ...

Post a similar request >

19 Aug

Garden | Sheds

London - E4

Enquiry from: Libra J

Start Date: Immediate

We are moving to house (just to the next road) and would like to keep our shed. we therefore would like someone to move the shed for us. the areas where we are moving the she9 to may need to be levell...

Post a similar request >

15 Jul

Garden | Sheds

London - E14

Enquiry from: Mohammed K

Start Date: Immediate

cycle storage foe 4 bikes

Post a similar request >

17 Feb

Kitchen | Fitting

London - E14

Enquiry from: Andrew O

Start Date: Immediate

Old Kitchen removal and installation of new. Relocate waste and water pipes. Electrical works for new lighting. Are you the property owner: Owner of the property What level of service do you require: ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Tower Hamlets is:

£1,095

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Tower Hamlets £1,475-£3,665
Carpenters and joiners in Tower Hamlets £375-£575
Plasterboard dry lining in Tower Hamlets £638-£978
Wood flooring in Tower Hamlets £750-£1,150
Wooden decking in Tower Hamlets £663-£3,363
Garden shed in Tower Hamlets £300-£545
Wooden window repair in Tower Hamlets £320-£480

Related Carpenter searches in Tower Hamlets

Carpenter FAQs

How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Tower Hamlets.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Tower Hamlets?

View our open Carpenter jobs near you

Join today
View Shortlist