Find a Carpenter you can trust in Porth.

Choose from 119 Carpenters, all rated by people like you.

Over 53 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro
Hard working clean building and roofing boys ready for the next care and repair
Verified Pro
Platinum Fencing Carry out any fencing work that is needed, from weather damaged panels to full take down and replace fenc...
Verified Pro
Serving the local area we take pride in our work . And our reputation have been build on loyalty to our customers over ...
Verified Pro

The Grass Master

0 review(s)
Offers services in PORTH
Established in 2006 The Grass Master Ltd has completed hundreds of landscaping projects across Kent. We cover Artificial L...

Recent Carpenter Enquiries

26 Aug

Garden | Decking

Porth - CF39

Enquiry from: Donna S

Start Date: Immediate

fitting of timber frame and composite decking. area 23m2. materials supplied. based in porth. are you the property owner: owner of the property property type: terrace what level of service do you requ...

Post a similar request >

25 Jun

Garden | Decking

Porth - CF39

Enquiry from: Nicola D

Start Date: Immediate

are you the property owner: owner of the property property type: terrace other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

28 Feb

Garden | Decking

Porth - CF39

Enquiry from: Adele L

Start Date: Immediate

Just inquiring how much for decking and fencing would be thanks - Estimated Service Date: 02/05/2016 - Estimated Decking Area (sq ft): 39 ft 5 inches - Reason for Request: To just have an idea of the...

Post a similar request >

19 Mar

Windows | Wooden | Repair

Tonypandy - CF40

Enquiry from: Jonathan L

Start Date: Immediate

window above front door in wooden frame needs replacement. size : width of door height about half that. are you the property owner: owner of the property property type: other what service are you look...

Post a similar request >

11 Oct

Carpentry

Aberdare - CF44

Enquiry from: Angela D

Start Date: 1 to 3 months

new skirting boards fitted are you the property owner: tenant (with permission) property type: semi detached what type of job are you looking to have done: other do you require a door(s): none time sc...

Post a similar request >

16 Jul

Carpentry

Bridgend - CF32

Enquiry from: Miss E

Start Date: Immediate

How much would it cost to fit to floor kitchen cupboards and a work top

Post a similar request >

26 Jun

Garden | Decking

Maesteg - CF34

Enquiry from: Kim D

Start Date: Immediate

Full decking replacement and back fencing.

Post a similar request >

15 Jun

Carpentry

Port Talbot - SA13

Enquiry from: Spencer C

Start Date: Immediate

I need my staircase to be repaired or replaced. I also have some cupboards to be built and some boxing in of pipework ect

Post a similar request >

23 May

Carpentry

Bridgend - CF32

Enquiry from: Wayne C

Start Date: Immediate

All living room and hallway skirting and door acitrave removed and replaced, preferable pvc skirting. And fit 5 new doors

Post a similar request >

18 May

Garden | Decking

Bridgend - CF31

Enquiry from: Sabrina J

Start Date: Immediate

Hi, Just enquiring if I can get someone to have a look at my decking for a quote to see if some of the old decking slats can be replaced. I had someone replace some of them before so some are i...

Post a similar request >

16 May

Carpentry

Port Talbot - SA13

Enquiry from: Lynne N

Start Date: Immediate

We have had a new bathroom suite and require to have all the pipes boxed in, the bath panel requires cutting to fit around the bath. We have also had a new boiler and require the pipes beneath it to b...

Post a similar request >

09 May

Carpentry

Bridgend - CF31

Enquiry from: Peter B

Start Date: Immediate

Supply and fit a loft ladder.

Post a similar request >

07 May

Carpentry

Port Talbot - SA13

Enquiry from: Lornique M

Start Date: Immediate

Skirting already provided -Archatrais stair glass banister

Post a similar request >

03 May

Carpentry

Pentre - CF41

Enquiry from: Margaret P

Start Date: Immediate

Handrail up stairs and handrail up 5 steps in garden

Post a similar request >

01 May

Garden | Sheds

Llantwit Major - CF61

Enquiry from: Maria W

Start Date: Immediate

Wooden window repair Lead

shed dismantling and removal are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: removal of old please call to appoint

Post a similar request >

30 Apr

Carpentry

Port Talbot - SA13

Enquiry from: Leigh B

Start Date: Immediate

3 x bedroom doors fitted alterations to the bottom stair well height due to new building regulations banister installed.

Post a similar request >

28 Mar

Carpentry

Bridgend - CF32

Enquiry from: Debra R

Start Date: Immediate

How much world it be to fit 3 oak doors 1 slider 2 standard I have handles and homes pack too?

Post a similar request >

26 Mar

Garden | Decking

Tonypandy - CF40

Enquiry from: Conrad R

Start Date: Immediate

Full decking over garden

Post a similar request >

19 Mar

Carpentry

Bridgend - CF32

Enquiry from: Alison K

Start Date: Immediate

We have 3 internal doors that need to be adjusted as they were not correctly installed. One door that needs to be hung. A large mirror that need to be hung. Also, depending on cost we need some skirti...

Post a similar request >

12 Mar

Carpentry

Port Talbot - SA13

Enquiry from: Jordan W

Start Date: Immediate

Hello, I’m trying to get a quote for a living room door with a lock fitted It needs to be a sturdy door with a lock due to my sons autism If someone could get back to me to discuss , social servic...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Porth is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Porth £975-£2,495
Carpenters and joiners in Porth £375-£575
Plasterboard dry lining in Porth £638-£978
Wood flooring in Porth £750-£1,150
Wooden decking in Porth £1,125-£1,725
Garden shed in Porth £475-£1,595
Wooden window repair in Porth £320-£480

Related Carpenter searches in Porth

Carpenter FAQs

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Porth.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Porth?

View our open Carpenter jobs near you

Join today
View Shortlist