Find a Carpenter you can trust in Forres.

Choose from 4 Carpenters, all rated by people like you.

Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Mills Agri Services

0 review(s)
Offers services in FORRES
Fencing is our bread and butter whether it’s security fencing or garden timber all the way to livestock and deer we have a...

Floors2adoor

0 review(s)
Offers services in FORRES
Hello I have 32 year experience working as a carpenter and joiner working all around the uk mainly specializing in hardwoo...

Recent Carpenter Enquiries

20 Mar

Carpentry

Forres - IV36

Enquiry from: James H

Start Date: Immediate

Replacement decking (medium area, 15-30 square metres), and bedroom laminate flooring.

Post a similar request >

26 Jul

Garden | Decking

Forres - IV36

Enquiry from: Carol A

Start Date: Immediate

full garden landscape fencing driveway patio etc. are you the property owner: relative of owner property type: detached do you have a: large garden garden type: back garden, front garden, side garden ...

Post a similar request >

02 Aug

Interior work | Stud Walls

Forres - IV36

Enquiry from: Beryl C

Start Date: Immediate

A small stud wall to devide utility room from the kitchen

Post a similar request >

14 Mar

Garden | Decking

Forres - IV36

Enquiry from: Michael B

Start Date: Immediate

good afternoon, my department within 39 engineer regiment of the british army are producing an option study for refurbishing an old cricket pavilion building on camp for future use as for hosting uni...

Post a similar request >

16 Jun

Garden | Sheds

Forres - IV36

Enquiry from: Jack C

Start Date: Immediate

looking for a wooden garden shed about 6x3 with a suitable base. this to be fitted on a flat area in garden, i require quotes and when this can possibly be done.

Post a similar request >

06 Oct

Carpentry

Forres - IV36

Enquiry from: Walter W

Start Date: Immediate

Glass partition in open plan office to create a separate office. Time scale: Immediate Please call to appoint

Post a similar request >

25 Sep

Garden | Sheds

Forres - IV36

Enquiry from: Jason A

Start Date: Immediate

materials + delivery for A 20ft x 8ft garden shed Are you the property owner: Owner of the property Property Type: Semi detached Roughly the size of your garden: Unsure Garden Type: Back garden Do you...

Post a similar request >

17 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Alex C

Start Date: Immediate

Hi, Our wooden garden shed roof seems to be leaking, we believe the roof felt has worn out? If this could be replaced or with a better material asap would be much appreciated. Can post pictures ove...

Post a similar request >

22 Jan

Windows | Wooden | Repair

Elgin - IV30

Enquiry from: Michelle A

Start Date: 3+ months

sash window refurbishment. timber appears good condition. windows are painted shut and some strings broken. are you the property owner: owner of the property property type: detached what service ar...

Post a similar request >

04 Aug

Carpentry

Elgin - IV30

Enquiry from: Lee S

Start Date: Immediate

would like a shed to be built in the garden, dimensions would roughly be 4 metres x 3 metres. i am looking to get an estimated and how long it would take to build. many thanks lee time scale: immediat...

Post a similar request >

03 Aug

Carpentry

Elgin - IV30

Enquiry from: Emeka A

Start Date: Immediate

dismantle part of a 3- seater sofa in order to get pass through a lounge door time scale: immediate please call to appoint

Post a similar request >

15 Jun

Garden | Decking

Nairn - IV12

Enquiry from: Alison B

Start Date: Immediate

are you the property owner: owner of the property property type: semi detached other forms: wooden decking agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

05 Jun

Garden | Sheds

Elgin - IV30

Enquiry from: Helen M

Start Date: 1 to 3 months

Garden shed no larger than 5 ft x 5ft. for new home at 6 grant st Burghead

Post a similar request >

31 Jan

Kitchen | Fitting

Elgin - IV30

Enquiry from: Kevin S

Start Date: 1 to 3 months

Old kitchen taken out and new kitchen installed Are you the property owner: Owner of the property Do you have all of the required materials for your kitchen already: Yes Agreed to recieve Kitchen Supp...

Post a similar request >

20 Sep

Garden | Sheds

Elgin - IV30

Enquiry from: Lewis D

Start Date: Less than one month

8ft by 6ft with door on the long wall of the shed Time scale: Less than one month

Post a similar request >

09 Aug

Garden | Decking

Elgin - IV30

Enquiry from: Jim D

Start Date: Immediate

We would like someone to design and install some decking in our back garden. Are you the property owner: Owner of the property Property Type: Detached What level of service do you require: Supply and ...

Post a similar request >

30 May

Garden | Decking

Nairn - IV12

Enquiry from: Elilzabeth T

Start Date: Immediate

Decking to side of house.

Post a similar request >

22 May

Carpentry

Elgin - IV30

Enquiry from: Simon M

Start Date: Immediate

Fitted wardrobe quote for 2 bedrooms and shelving and clothes rail for hallway required.

Post a similar request >

26 Apr

Garden | Decking

Elgin - IV30

Enquiry from: Ken P

Start Date: Immediate

Owner of static home and wanting some decking around the property. *

Post a similar request >

14 Mar

Garden | Decking

Elgin - IV30

Enquiry from: Allan P

Start Date: Immediate

Hi I am looking to get a price for some decking, 4 meter X 3 Meter, current surface is grass. What would be the cost of this please. Are you the property owner: Owner of the property Property Type: De...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Forres is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Forres £975-£2,495
Carpenters and joiners in Forres £375-£575
Plasterboard dry lining in Forres £638-£978
Wood flooring in Forres £750-£1,150
Wooden decking in Forres £1,125-£1,725
Garden shed in Forres £450-£690
Wooden window repair in Forres £320-£480

Related Carpenter searches in Forres

Carpenter FAQs

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
Does my garden shed need a base?

Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Forres.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Forres?

View our open Carpenter jobs near you

Join today
View Shortlist