- Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
- Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
- Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
- Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
Find a Carpenter you can trust in Grantown-on-spey.
Choose from 20 Carpenters, all rated by people like you.
Over 21 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you
Oakmont TV Aerial and Satellite
Active drives
Mills Agri Services
First fix construction (scotland)
IC plastering
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Grantown-on-spey is:
£879
| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Grantown-on-spey | £975-£2,495 |
| Carpenters and joiners in Grantown-on-spey | £375-£575 |
| Plasterboard dry lining in Grantown-on-spey | £638-£978 |
| Wood flooring in Grantown-on-spey | £750-£1,150 |
| Wooden decking in Grantown-on-spey | £1,125-£1,725 |
| Garden shed in Grantown-on-spey | £450-£690 |
| Wooden window repair in Grantown-on-spey | £320-£480 |
Carpenter FAQs
How To Dot And Dab A Plasterboard
If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!
• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.
• Ensure the wall’s height is 15mm more than the plasterboard
• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.
• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.
• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.
• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.
• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
Yes, your shed does need a base. This is to give it a solid, level foundation. Open soil will not help with the longevity of the shed itself or the contents within. The best materials to use to make your shed base are concrete, natural stone or wood.
- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
How To Fit Plasterboard
If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.
To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.
Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.
• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit
• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.
• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.
• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.
- The shed doesn’t cover more than 50% of the garden
- It’s not in front of your house
- The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
- There’s no veranda or balcony
- The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
- The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
- If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
- If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
- If you own a piece of woodland, you must seek planning permission for any permanent structure
- In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
- In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
- Decking joists
- Coach screws
- Coach bolts
- Combi drill
- Socket set
- A saw suitable for your project and the thickness of the timber
- Pencil
- Decking preservative
- Sandpaper or sander
- Measure your deck frame and cut to size if necessary.
- Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
- Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
- Fit the coach screws with either a drill driver or socket and ratchet.
- Repeat the process for the inner joists once you’ve assembled the outer frame.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Grantown-on-spey.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Grantown-on-spey?
View our open Carpenter jobs near you
Join today