Find a Carpenter you can trust in Thetford.

Choose from 51 Carpenters, all rated by people like you.

Over 49 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

ACL Installations

0 review(s)
Offers services in THETFORD
When it comes to getting the experts in to fix a problem then you can't go wrong with us. Whatever the problem be it a...
Verified Pro
Enhance your outdoor living space with a beautifully designed patio from Essex Driveways and Patios Ltd. Whether you want ...
Verified Pro
Premium Yet Affordable throughout Essex & East Anglia S.J. Treecare & landscape services have many years experience in all...

Recent Carpenter Enquiries

24 Apr

Windows | Wooden | Repair

Thetford - IP26

Enquiry from: Christine B

Start Date: Immediate

Clean frames and re-varnish & service mechanism on 3 velux windows, one needs minor repair.

Post a similar request >

24 Mar

Garden | Decking

Thetford - IP24

Enquiry from: Kirstie P

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

we are looking for someone to help landscape our front and back garden. currently both just grass and the back has a patio approx 3x6m off the back of the house. we have plans to put a garden room and...

Post a similar request >

18 Mar

Carpentry

Thetford - IP24

Enquiry from: Sarah C

Start Date: Immediate

We recently had carpets installed and the doors need to be trimmed. Most of them are fire doors

Post a similar request >

27 Sep

Garden | Decking

Thetford - IP24

Enquiry from: Mi P

Start Date: Immediate

need decking measuring 3.5m x 2.5m. ideally need quotes for supply and install also install only. i am unsure if i want composite or wood so if you can supply a quote for both , the deciding factor wi...

Post a similar request >

13 May

Garden | Decking

Thetford - IP25

Enquiry from: John G

Start Date: Immediate

a small area of decking 3 x 2.5 metres at ground level in need of replacement, straightforward, please can you help? are you the property owner: owner of the property property type: detached what l...

Post a similar request >

13 Apr

Carpentry

Thetford - IP25

Enquiry from: Ronald W

Start Date: 1 to 3 months

remove exiting wooden soffits and fascia boards from the 4 dormers and replace with rosewood upvc (property is a bungalow). the approximate surface area of all dormers is 40 square meters. clad dormer...

Post a similar request >

21 Mar

Garden | Decking

Thetford - IP24

Enquiry from: Pat P

Start Date: Immediate

customer in thetford areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via telephone, sms and email at 21/03/2022 11:33.please call...

Post a similar request >

16 Mar

Garden | Sheds

Thetford - IP25

Enquiry from: Adrian L

Start Date: Immediate

customer in thetford areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via telephone and email at 16/03/2022 11:34.please call to arra...

Post a similar request >

24 Jan

Kitchen | Fitting

Thetford - IP25

Enquiry from: Elaine S

Start Date: Immediate

remove worktops, supply and fit new worktops. supply & fit new sink, trap and tap. supply & fit new 1000 base unit. supply & fit 600mm base unit. fit doors remove all waste at end of job. are you the ...

Post a similar request >

12 Mar

Garden | Decking

Thetford - IP26

Enquiry from: Janet C

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Decking, Patio, block paving and tree removal

Post a similar request >

10 Aug

Carpentry

Thetford - IP25

Enquiry from: Carol A

Start Date: Immediate

Great, what do you need done? Supply and Installation I am after four doors being fitted plus some wardrobe doors and some skirting and architrave and wooden floor repairs.

Post a similar request >

05 Apr

Garden | Decking

Thetford - IP25

Enquiry from: Kayleigh P

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Someone to lay artificial grass and put up decking.

Post a similar request >

21 Mar

Garden | Decking

Thetford - IP25

Enquiry from: Kayleigh P

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Someone to lay artificial grass and put up decking.

Post a similar request >

31 May

Carpentry

Thetford - IP26

Enquiry from: David A

Start Date: 1 to 3 months

All interior doors need to be replaced. Total of seven and a half doors. Looking for guidance as to what sort of doors we should use. Time scale: 1-3 months Please call to appoint

Post a similar request >

12 Dec

Garden | Sheds

Thetford - IP25

Enquiry from: TERRY W

Start Date: 1 to 3 months

Are you the property owner: Tenant (with permission) Property Type: Terrace Other Forms: 10085 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

22 Jun

Garden | Sheds

Thetford - IP24

Enquiry from: Mr L

Start Date: Immediate

feltroof extention plus shed

Post a similar request >

20 Oct

Flooring | Wooden

Thetford - IP24

Enquiry from: Victoria O

Start Date: Immediate

Product Material: Hardwood Are you the property owner: Owner of the property How many rooms are you looking to update with wood flooring: 1-2 Rooms What level of service do you require: Supply and fit...

Post a similar request >

05 Oct

Garden | Decking

Thetford - IP24

Enquiry from: Simona A

Start Date: Immediate

I need to build a decking area and replace some old slabs on my paved area - Estimated Service Date: 10/10/2015 - Estimated Decking Area (sq ft): 15 - Reason for Request: To get quotes and then choose...

Post a similar request >

10 Feb

Kitchen | Fitting

Thetford - IP25

Enquiry from: L B

Start Date: Immediate

Fit a new kitchen. To fit 13 cupboard, 3 drawer unit, extractor fan, sink and tap, facias, pelmet, plinth, cut and fit around 3 metres of worktop in kitchen also move 3 plug sockets at back of cupboar...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Thetford is:

£889

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Thetford £975-£2,495
Carpenters and joiners in Thetford £375-£575
Plasterboard dry lining in Thetford £638-£978
Wood flooring in Thetford £750-£1,150
Wooden decking in Thetford £1,125-£1,725
Garden shed in Thetford £450-£690
Wooden window repair in Thetford £210-£740

Related Carpenter searches in Thetford

Carpenter FAQs

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Thetford.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Thetford?

View our open Carpenter jobs near you

Join today
View Shortlist