Find a Carpenter you can trust in Bedale.

Choose from 27 Carpenters, all rated by people like you.

Over 79 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

28 Jun

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Sheila P

Start Date: Immediate

Repair of timber mock sash windows

Post a similar request >

27 Jun

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Ailsa S

Start Date: Immediate

Looking for construction of ramp for muck trailer at horse racing yard. Can send you photos of existing ramp. Approx size 12.5 ft by 4.5ft

Post a similar request >

24 May

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Ian E

Start Date: Immediate

We need a Wren fitted bedroom fitting, which we have already purchased and that is in boxes in our bedroom. The fitted cupboards are to go into the corner of a approx 10’ by 12’ bedroom. The Wren ...

Post a similar request >

22 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Franc S

Start Date: Less than one month

kitchen counter fitted, l-shape with sink and integrated hob. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other do yo...

Post a similar request >

17 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Franc S

Start Date: Less than one month

counter tops in kitchen (l-shaped) and utility room (single run). doors replaced. are you the property owner: owner of the property property type: semi detached what type of job are you looking to h...

Post a similar request >

22 May

Garden | Decking

Bedale, Hawes, Leyburn - DL8

Enquiry from: Sarah L

Start Date: Immediate

decking fitted on lawn for outside furniture are you the property owner: tenant (with permission) property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

10 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: David G

Start Date: Immediate

Two 6' 6" x 2' internal pantry doors to be replaced in the kitchen.

Post a similar request >

03 Jul

Garden | Decking

Bedale, Hawes, Leyburn - DL8

Enquiry from: Phillip D

Start Date: 1 to 3 months

Approximately 20sq metres of composite decking on a slight slope over a lawned area. How much? Are you the property owner: Owner of the property Property Type: Detached What level of service do you re...

Post a similar request >

09 Oct

Carpentry

Northallerton - DL7

Enquiry from: Neil M

Start Date: Immediate

Had new carpet fitted, need the door trimming so I can open and close.

Post a similar request >

04 Oct

Garden | Sheds

Ripon - HG4

Enquiry from: Moira S

Start Date: Immediate

I have a shed in my garden. I want to alter the shed into an added part of my garage and create a raised growing bed in the space this could create.

Post a similar request >

16 Jun

Carpentry

Richmond - DL10

Enquiry from: Kate K

Start Date: Immediate

Hello, My husband and I have just purchased a house in Richmond. We need a new living room door hanging as well as the door frame replacing and another door needs planing. We would also like to disc...

Post a similar request >

05 Jun

Carpentry

Ripon - HG4

Enquiry from: Pete B

Start Date: Immediate

Hi , I need a fire door FD30 supplied and fitted , could you supply a quote please ?

Post a similar request >

21 Dec

Carpentry

Ripon - HG4

Enquiry from: Tom L

Start Date: Immediate

Garage door blew open, hinge damaged, door won’t close-

Post a similar request >

19 Jan

Garden | Decking

Richmond - DL10

Enquiry from: Mark C

Start Date: Immediate

customer in the richmond area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the pr...

Post a similar request >

30 Sep

Carpentry

Ripon - HG4

Enquiry from: Chris W

Start Date: Immediate

remove old door and take and fit new are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many windows ...

Post a similar request >

27 Sep

Carpentry

Ripon - HG4

Enquiry from: Chris W

Start Date: Less than one month

front door fitted and frame repair are you the property owner: owner of the property do you require a door(s): front door time scale: less than one month what level of service do you require: supplied...

Post a similar request >

03 Mar

Garden | Decking

Ripon - HG4

Enquiry from: Amy T

Start Date: Immediate

wanting a decking put in my garden approximately 9mx3m and need a rough idea of the cost of this project are you the property owner: owner of the property property type: semi detached what level of se...

Post a similar request >

25 Feb

Kitchen | Fitting

Northallerton - DL7

Enquiry from: Susan L

Start Date: Immediate

installation of wiring for cooker, induction hob and extractor. new unit to be fitted to house these. larder unit to be installed. another worktop needed with plumbing for dishwasher underneath ar...

Post a similar request >

25 Nov

Carpentry

Ripon - HG4

Enquiry from: Bogna W

Start Date: Immediate

to replace an old kitchen sink with a new unit. same size, but a one bowl now and different corners, so a bit of cutting in the worktop is required. it's to accomodate a new dichwasher in the space un...

Post a similar request >

26 Apr

Garden | Decking

Ripon - HG4

Enquiry from: Alan C

Start Date: Immediate

replace complete old decking that is rotting in parts with new trex decking boards are you the property owner: owner of the property property type: semi detached what level of service do you require:...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Bedale is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Bedale £975-£2,495
Carpenters and joiners in Bedale £375-£575
Plasterboard dry lining in Bedale £638-£978
Wood flooring in Bedale £750-£1,150
Wooden decking in Bedale £1,125-£1,725
Garden shed in Bedale £450-£690
Wooden window repair in Bedale £320-£480

Related Carpenter searches in Bedale

Carpenter FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Bedale.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Bedale?

View our open Carpenter jobs near you

Join today
View Shortlist