Find a Carpenter you can trust in Guisborough.

Choose from 20 Carpenters, all rated by people like you.

Over 51 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

C&L Surfacing

0 review(s)
Offers services in GUISBOROUGH
Here at C&L Surfacing We use only the highest quality resin bound products – backed by up to a 25-year manufacturer warr...
Verified Pro
At Green, Clean & Handy Homes Property Solutions, we specialize in transforming your gardens and patios into beautiful, fu...

Recent Carpenter Enquiries

24 Oct

Carpentry

Guisborough - TS14

Enquiry from: Andrew W

Start Date: Immediate

replace door to side entrance to garage are you the property owner: owner of the property property type: semi detached do you require a door(s): back door what level of service do you require: supplie...

Post a similar request >

06 Sep

Garden | Sheds

Guisborough - TS14

Enquiry from: Gillian R

Start Date: Less than one month

WE NEED A 8X6 WOOD GARDEN SHED, NOT BOTHERED ABOUT WINDOWS, WE WILL NEED A BASE AND INSTALLATION PLEASE PREFER SHIPLAP OR TONGUE IN GROOVE PLEASE

Post a similar request >

23 Jan

Kitchen | Fitting

Guisborough - TS14

Enquiry from: Stephen S

Start Date: Immediate

Following the removal of a boiler, corner cupboard required supplying and fitting

Post a similar request >

02 Nov

Flooring | Wooden

Guisborough - TS14

Enquiry from: Ed T

Start Date: 1 to 3 months

A price on setting a floor down for a studio in a gym, either screeded or wood. The room is approx 170m2 Time scale: 1-3 months Please call to appoint

Post a similar request >

30 Jul

Garden | Sheds

Guisborough - TS14

Enquiry from: Kevin H

Start Date: Immediate

Hi We live in Guisborough I’m looking for a custom size shed It needs to be 1000cm x 2400cm and the door would be at one end of the long side the roof can be just a sloping felted type I can be...

Post a similar request >

20 Jul

Garden | Sheds

Guisborough - TS14

Enquiry from: Janet S

Start Date: Immediate

Are you the property owner: Tenant (with permission) Property Type: Terrace Other Forms: 10085 Agreed to recieve quotes for selected products: Yes

Post a similar request >

05 May

Garden | Decking

Guisborough - TS14

Enquiry from: Stephen D

Start Date: Immediate

Deck the back garden, need 105 boards at 2.4m long Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

26 Feb

Windows | Wooden | Repair

Saltburn-by-the-Sea - TS12

Enquiry from: Keith M

Start Date: Immediate

Wood windows repairing and glazing

Post a similar request >

30 Oct

Flooring | Wooden

Yarm - TS15

Enquiry from: Colin I

Start Date: Immediate

I am looking for 21 square meters of oak flooring. 130x 20mm. To match original flooring. Square edge unfinished and once in then sand whole area and reseal.

Post a similar request >

11 Aug

Garden | Decking

Saltburn-by-the-Sea - TS13

Enquiry from: Bob J

Start Date: Immediate

i have a front garden area approx 4m x 3m (minus a bit for bay window). its partially concreted, and partially earth, im looking to replace the lot with decking. i am able to assist with labour, i...

Post a similar request >

30 Apr

Garden | Decking

Stockton-on-tees - TS18

Enquiry from: Sean F

Start Date: Immediate

Hi, I work at dream decking at Flooring Superstore Stockton. We selling compsite decking and offer trade accounts. we are also looking for compsite decking fitters

Post a similar request >

26 Apr

Carpentry

Middlesbrough - TS6

Enquiry from: Helen A

Start Date: Immediate

Request a quote for hanging 6 internal doors and handles.

Post a similar request >

18 Oct

Kitchen | Fitting

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

looking to fit a kitchen

Post a similar request >

18 Oct

Carpentry

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

Skirting boards and architrave, and laminate flooring. Also to fit a kitchen

Post a similar request >

03 Jun

Carpentry

Middlesbrough - TS5

Enquiry from: Les R

Start Date: Immediate

Can you give me a call please

Post a similar request >

22 May

Garden | Decking

Middlesbrough - TS9

Enquiry from: Fiona B

Start Date: Immediate

Need decking installed at bottom of the garden.

Post a similar request >

20 Jan

Carpentry

Middlesbrough - TS6

Enquiry from: Michael R

Start Date: Immediate

Supply and fit replacement bathroom door

Post a similar request >

12 Jan

Garden | Decking

Whitby - YO21

Enquiry from: Russ C

Start Date: Immediate

remove old decking including rotten posts and joists, on sloping site to rear conservatory. replace and extend to approx 4.5m x 3.5m. finish with composite decking. and steps.. are you the property o...

Post a similar request >

09 Oct

Garden | Sheds

Middlesbrough - TS4

Enquiry from: Martin D

Start Date: Immediate

make base for 7*5 wooden shed & assemble the shed all the materials for base provided are you the property owner: owner of the property what level of service are you looking for: install do you have ...

Post a similar request >

01 Jun

Garden | Sheds

Saltburn-by-the-Sea - TS13

Enquiry from: Graham S

Start Date: Immediate

6x4 shed to be delivered and fitted include foundation as required are you the property owner: owner of the property what level of service are you looking for: supply, install do you have a: small ga...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Guisborough is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Guisborough £975-£2,495
Carpenters and joiners in Guisborough £375-£575
Plasterboard dry lining in Guisborough £638-£978
Wood flooring in Guisborough £750-£1,150
Wooden decking in Guisborough £1,125-£1,725
Garden shed in Guisborough £450-£690
Wooden window repair in Guisborough £320-£480

Related Carpenter searches in Guisborough

Carpenter FAQs

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Guisborough.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Guisborough?

View our open Carpenter jobs near you

Join today
View Shortlist