Find a Carpenter you can trust in Guisborough.

Choose from 56 Carpenters, all rated by people like you.

Over 51 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in GUISBOROUGH
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in GUISBOROUGH
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in GUISBOROUGH
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...

Recent Carpenter Enquiries

24 Oct

Carpentry

Guisborough - TS14

Enquiry from: Andrew W

Start Date: Immediate

replace door to side entrance to garage are you the property owner: owner of the property property type: semi detached do you require a door(s): back door what level of service do you require: supplie...

Post a similar request >

06 Sep

Garden | Sheds

Guisborough - TS14

Enquiry from: Gillian R

Start Date: Less than one month

WE NEED A 8X6 WOOD GARDEN SHED, NOT BOTHERED ABOUT WINDOWS, WE WILL NEED A BASE AND INSTALLATION PLEASE PREFER SHIPLAP OR TONGUE IN GROOVE PLEASE

Post a similar request >

23 Jan

Kitchen | Fitting

Guisborough - TS14

Enquiry from: Stephen S

Start Date: Immediate

Following the removal of a boiler, corner cupboard required supplying and fitting

Post a similar request >

02 Nov

Flooring | Wooden

Guisborough - TS14

Enquiry from: Ed T

Start Date: 1 to 3 months

A price on setting a floor down for a studio in a gym, either screeded or wood. The room is approx 170m2 Time scale: 1-3 months Please call to appoint

Post a similar request >

30 Jul

Garden | Sheds

Guisborough - TS14

Enquiry from: Kevin H

Start Date: Immediate

Hi We live in Guisborough I’m looking for a custom size shed It needs to be 1000cm x 2400cm and the door would be at one end of the long side the roof can be just a sloping felted type I can be...

Post a similar request >

20 Jul

Garden | Sheds

Guisborough - TS14

Enquiry from: Janet S

Start Date: Immediate

Are you the property owner: Tenant (with permission) Property Type: Terrace Other Forms: 10085 Agreed to recieve quotes for selected products: Yes

Post a similar request >

05 May

Garden | Decking

Guisborough - TS14

Enquiry from: Stephen D

Start Date: Immediate

Deck the back garden, need 105 boards at 2.4m long Homeowner Supplied and fitted Please contact to appoint

Post a similar request >

30 Apr

Garden | Decking

Stockton-on-tees - TS18

Enquiry from: Sean F

Start Date: Immediate

Hi, I work at dream decking at Flooring Superstore Stockton. We selling compsite decking and offer trade accounts. we are also looking for compsite decking fitters

Post a similar request >

26 Apr

Carpentry

Middlesbrough - TS6

Enquiry from: Helen A

Start Date: Immediate

Request a quote for hanging 6 internal doors and handles.

Post a similar request >

18 Oct

Kitchen | Fitting

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

looking to fit a kitchen

Post a similar request >

18 Oct

Carpentry

Middlesbrough - TS3

Enquiry from: Charisse H

Start Date: Immediate

Skirting boards and architrave, and laminate flooring. Also to fit a kitchen

Post a similar request >

03 Jun

Carpentry

Middlesbrough - TS5

Enquiry from: Les R

Start Date: Immediate

Can you give me a call please

Post a similar request >

22 May

Garden | Decking

Middlesbrough - TS9

Enquiry from: Fiona B

Start Date: Immediate

Need decking installed at bottom of the garden.

Post a similar request >

20 Jan

Carpentry

Middlesbrough - TS6

Enquiry from: Michael R

Start Date: Immediate

Supply and fit replacement bathroom door

Post a similar request >

12 Jan

Garden | Decking

Whitby - YO21

Enquiry from: Russ C

Start Date: Immediate

remove old decking including rotten posts and joists, on sloping site to rear conservatory. replace and extend to approx 4.5m x 3.5m. finish with composite decking. and steps.. are you the property o...

Post a similar request >

09 Oct

Garden | Sheds

Middlesbrough - TS4

Enquiry from: Martin D

Start Date: Immediate

make base for 7*5 wooden shed & assemble the shed all the materials for base provided are you the property owner: owner of the property what level of service are you looking for: install do you have ...

Post a similar request >

01 Jun

Garden | Sheds

Saltburn-by-the-Sea - TS13

Enquiry from: Graham S

Start Date: Immediate

6x4 shed to be delivered and fitted include foundation as required are you the property owner: owner of the property what level of service are you looking for: supply, install do you have a: small ga...

Post a similar request >

10 May

Garden | Sheds

Middlesbrough - TS5

Enquiry from: Kelly L

Start Date: Immediate

wanting some prices on a 4x4 wooden shed with base please are you the property owner: owner of the property do you have a: medium size garden what level of service are you looking for: supply, install...

Post a similar request >

22 Feb

Kitchen | Fitting

Saltburn-by-the-Sea - TS13

Enquiry from: Jill W

Start Date: Immediate

are you the property owner: owner of the property other forms: kitchen design & installation, building maintenance agreed to receive quotes for selected products: yes please call to appoint what leve...

Post a similar request >

29 Jan

Garden | Decking

Middlesbrough - TS8

Enquiry from: Peter A

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: semi detached work description: some paving, turf, and a patio area. may require some additional things when...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Guisborough is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Guisborough £975-£2,495
Carpenters and joiners in Guisborough £375-£575
Plasterboard dry lining in Guisborough £638-£978
Wood flooring in Guisborough £750-£1,150
Wooden decking in Guisborough £1,125-£1,725
Garden shed in Guisborough £450-£690
Wooden window repair in Guisborough £320-£480

Related Carpenter searches in Guisborough

Carpenter FAQs

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to find an installer for wooden flooring?

After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.

• Friends, Relatives & Neighbours

If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.

• Store Contact Lists

You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.

• Internet

With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.

Click here to learn more about wood flooring.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Guisborough.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Guisborough?

View our open Carpenter jobs near you

Join today
View Shortlist