Find a Carpenter you can trust in Leyburn.

Choose from 27 Carpenters, all rated by people like you.

Over 79 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

28 Jun

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Sheila P

Start Date: Immediate

Repair of timber mock sash windows

Post a similar request >

27 Jun

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Ailsa S

Start Date: Immediate

Looking for construction of ramp for muck trailer at horse racing yard. Can send you photos of existing ramp. Approx size 12.5 ft by 4.5ft

Post a similar request >

24 May

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Ian E

Start Date: Immediate

We need a Wren fitted bedroom fitting, which we have already purchased and that is in boxes in our bedroom. The fitted cupboards are to go into the corner of a approx 10’ by 12’ bedroom. The Wren ...

Post a similar request >

22 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Franc S

Start Date: Less than one month

kitchen counter fitted, l-shape with sink and integrated hob. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other do yo...

Post a similar request >

17 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: Franc S

Start Date: Less than one month

counter tops in kitchen (l-shaped) and utility room (single run). doors replaced. are you the property owner: owner of the property property type: semi detached what type of job are you looking to h...

Post a similar request >

22 May

Garden | Decking

Bedale, Hawes, Leyburn - DL8

Enquiry from: Sarah L

Start Date: Immediate

decking fitted on lawn for outside furniture are you the property owner: tenant (with permission) property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

10 Apr

Carpentry

Bedale, Hawes, Leyburn - DL8

Enquiry from: David G

Start Date: Immediate

Two 6' 6" x 2' internal pantry doors to be replaced in the kitchen.

Post a similar request >

03 Jul

Garden | Decking

Bedale, Hawes, Leyburn - DL8

Enquiry from: Phillip D

Start Date: 1 to 3 months

Approximately 20sq metres of composite decking on a slight slope over a lawned area. How much? Are you the property owner: Owner of the property Property Type: Detached What level of service do you re...

Post a similar request >

09 Oct

Carpentry

Northallerton - DL7

Enquiry from: Neil M

Start Date: Immediate

Had new carpet fitted, need the door trimming so I can open and close.

Post a similar request >

04 Oct

Garden | Sheds

Ripon - HG4

Enquiry from: Moira S

Start Date: Immediate

I have a shed in my garden. I want to alter the shed into an added part of my garage and create a raised growing bed in the space this could create.

Post a similar request >

16 Jun

Carpentry

Richmond - DL10

Enquiry from: Kate K

Start Date: Immediate

Hello, My husband and I have just purchased a house in Richmond. We need a new living room door hanging as well as the door frame replacing and another door needs planing. We would also like to disc...

Post a similar request >

05 Jun

Carpentry

Ripon - HG4

Enquiry from: Pete B

Start Date: Immediate

Hi , I need a fire door FD30 supplied and fitted , could you supply a quote please ?

Post a similar request >

21 Dec

Carpentry

Ripon - HG4

Enquiry from: Tom L

Start Date: Immediate

Garage door blew open, hinge damaged, door won’t close-

Post a similar request >

19 Jan

Garden | Decking

Richmond - DL10

Enquiry from: Mark C

Start Date: Immediate

customer in the richmond area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the pr...

Post a similar request >

30 Sep

Carpentry

Ripon - HG4

Enquiry from: Chris W

Start Date: Immediate

remove old door and take and fit new are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors how many windows ...

Post a similar request >

27 Sep

Carpentry

Ripon - HG4

Enquiry from: Chris W

Start Date: Less than one month

front door fitted and frame repair are you the property owner: owner of the property do you require a door(s): front door time scale: less than one month what level of service do you require: supplied...

Post a similar request >

03 Mar

Garden | Decking

Ripon - HG4

Enquiry from: Amy T

Start Date: Immediate

wanting a decking put in my garden approximately 9mx3m and need a rough idea of the cost of this project are you the property owner: owner of the property property type: semi detached what level of se...

Post a similar request >

25 Feb

Kitchen | Fitting

Northallerton - DL7

Enquiry from: Susan L

Start Date: Immediate

installation of wiring for cooker, induction hob and extractor. new unit to be fitted to house these. larder unit to be installed. another worktop needed with plumbing for dishwasher underneath ar...

Post a similar request >

25 Nov

Carpentry

Ripon - HG4

Enquiry from: Bogna W

Start Date: Immediate

to replace an old kitchen sink with a new unit. same size, but a one bowl now and different corners, so a bit of cutting in the worktop is required. it's to accomodate a new dichwasher in the space un...

Post a similar request >

26 Apr

Garden | Decking

Ripon - HG4

Enquiry from: Alan C

Start Date: Immediate

replace complete old decking that is rotting in parts with new trex decking boards are you the property owner: owner of the property property type: semi detached what level of service do you require:...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Leyburn is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Leyburn £975-£2,495
Carpenters and joiners in Leyburn £375-£575
Plasterboard dry lining in Leyburn £638-£978
Wood flooring in Leyburn £750-£1,150
Wooden decking in Leyburn £1,125-£1,725
Garden shed in Leyburn £450-£690
Wooden window repair in Leyburn £320-£480

Related Carpenter searches in Leyburn

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Leyburn.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Leyburn?

View our open Carpenter jobs near you

Join today
View Shortlist