Find a Carpenter you can trust in Stornoway.

Choose from 0 Carpenters, all rated by people like you.

Over reviews & an average rating of /5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Sorry!

We can't find any professionals in your area at the moment. If you're a professional looking to take advantage of our service, you can sign up for free here

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Stornoway is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Stornoway £975-£2,495
Carpenters and joiners in Stornoway £375-£575
Plasterboard dry lining in Stornoway £638-£978
Wood flooring in Stornoway £750-£1,150
Wooden decking in Stornoway £1,125-£1,725
Garden shed in Stornoway £450-£690
Wooden window repair in Stornoway £320-£480

Related Carpenter searches in Stornoway

Carpenter FAQs

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

Do I need underlay for a wooden floor?

If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!

First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?

In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Stornoway.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Stornoway?

View our open Carpenter jobs near you

Join today
View Shortlist