Find a Carpenter you can trust in Chipping Norton.

Choose from 223 Carpenters, all rated by people like you.

Over 324 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

JM Fencing and Landscaping

89 review(s)
Offers services in CHIPPING NORTON
Mitchell Landscaping have been established for 10 years, offering quality advice and services in landscaping, Gardening a...
Verified Pro

Jukoro

0 review(s)
Offers services in CHIPPING NORTON
Started in 2007 and incorporated in 2019, Jukoro Ltd is Worcester based building and construction business dedicated to se...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in CHIPPING NORTON
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified Pro

Topknotflooringuk

0 review(s)
Offers services in CHIPPING NORTON
Topknotflooringuk brings 15 years experience in wood floor coverings such as laminate , engineered and solid wood flooring...

Recent Carpenter Enquiries

05 Apr

Carpentry

Chipping Norton - OX7

Enquiry from: Gemma C

Start Date: 1 to 3 months

a bespoke accoya front door in the next 2 months are you the property owner: relative of owner property type: semi detached what type of job are you looking to have done: wooden window/doors how many...

Post a similar request >

24 Dec

Carpentry

Chipping Norton - OX7

Enquiry from: John M

Start Date: Immediate

Fitted wardrobes in two rooms, stairs to a cellar

Post a similar request >

28 Oct

Carpentry

Chipping Norton - OX7

Enquiry from: Mark B

Start Date: Immediate

I need new kitchen work top fitted, new kitchen tiles, new kitchen floor and bathroom floors and bathroom tiles. Kitchen shelves fitted on top of tiling. Minor kitchen alteration to cupboard. Job will...

Post a similar request >

29 Aug

Carpentry

Chipping Norton - OX7

Enquiry from: Nikki W

Start Date: Immediate

looking for someone to replace our current front door and patio doors. thanks nikki are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors...

Post a similar request >

07 Sep

Garden | Decking

Chipping Norton - OX7

Enquiry from: Mark T

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Terrace Other Forms: None Please call to appoint What level of service do you require: Supply and deck Time scale: 1-3 months Please ca...

Post a similar request >

20 Sep

Garden | Decking

Chipping Norton - OX7

Enquiry from: Helen W

Start Date: Immediate

Decking repair to one of Bluewood lodges in Kingham. Balustrade has come away from the main lodge. Are you the property owner: Owner of the property Property Type: Commercial What level of service do...

Post a similar request >

31 May

Garden | Decking

Chipping Norton - OX7

Enquiry from: Mrs D

Start Date: Immediate

Garden needs clearing, 10 decent plants moving, shed erected, decking erected, lawn laid.

Post a similar request >

26 Mar

Garden | Decking

Chipping Norton - OX7

Enquiry from: Amy S

Start Date: 1 to 3 months

Quote to supply & fit or just fit decking to extend over existing patio & steps down to garden - Estimated Service Date: 17/04/2016 - Estimated Decking Area (sq ft): 42? - Reason for Request: To get q...

Post a similar request >

08 Jul

Kitchen | Fitting

Chipping Norton - OX7

Enquiry from: Adam T

Start Date: Immediate

Home owner Howdens kitchen suite to be Fitted Time scale immediate Contact to Appoint

Post a similar request >

03 Jun

Garden | Sheds

Banbury - OX15

Enquiry from: Flo J

Start Date: Immediate

customer made an online enquiry for garden shed and confirmed on sms and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the pro...

Post a similar request >

13 May

Garden | Sheds

Oxford - OX1

Enquiry from: Louise T

Start Date: Immediate

Require a standard size shed putting together

Post a similar request >

12 Apr

Carpentry

Oxford - OX1

Enquiry from: Gill S

Start Date: Immediate

Wooden window repair Lead

Quote to replace old rotting deck with a new one. At rear and side of small victorian terrace , plus strep to garden. Many tyx

Post a similar request >

12 Apr

Carpentry

Oxford - OX1

Enquiry from: Phil C

Start Date: Immediate

Outdoor Deck replacement. I'm looking to replace a rotten deck at the back of my house.

Post a similar request >

17 Jan

Carpentry

Bicester - OX27

Enquiry from: Joff C

Start Date: Immediate

7x internal doors hanging. Doors and hinges ordered, they will need plaining to exact size.

Post a similar request >

03 Oct

Kitchen | Fitting

Witney - OX28

Enquiry from: Liam G

Start Date: Immediate

Hi we moved into a house back in the summer, in the kitchen we don't currently have a space for a dishwasher. There is room for a slimline dishwasher under the sink which we have. A list a friend made...

Post a similar request >

27 Aug

Carpentry

Bicester - OX25

Enquiry from: Nicki S

Start Date: Immediate

I'm looking for someone to put skirting boards in two new bedrooms. I also need doors hanging in both rooms and the door surrounds.

Post a similar request >

18 Aug

Carpentry

Bicester - OX27

Enquiry from: Tommy L

Start Date: Immediate

I need a 3 lever mortice deadlock fitting to one internal door.

Post a similar request >

17 Mar

Garden | Sheds

Oxford - OX2

Enquiry from: Duccio D

Start Date: Immediate

my shed roof is made of cement asbestos and I'd like to get a quotation for replacing it. The dimension of the shed is 16 square meters.

Post a similar request >

26 Aug

Carpentry

Bicester - OX26

Enquiry from: Jade P

Start Date: Immediate

2x bedroom doors to be fitted with handles are you the property owner: tenant (with permission) property type: terrace what type of job are you looking to have done: wooden window/doors how many windo...

Post a similar request >

25 May

Garden | Decking

Oxford - OX1

Enquiry from: Rakesh N

Start Date: Immediate

Garden levelled and decking and fence put up

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Chipping Norton is:

£1,421

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Chipping Norton £1,238-£3,748
Carpenters and joiners in Chipping Norton £375-£575
Plasterboard dry lining in Chipping Norton £638-£978
Wood flooring in Chipping Norton £750-£1,150
Wooden decking in Chipping Norton £1,125-£1,725
Garden shed in Chipping Norton £2,475-£4,345
Wooden window repair in Chipping Norton £320-£480

Related Carpenter searches in Chipping Norton

Carpenter FAQs

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Chipping Norton.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Chipping Norton?

View our open Carpenter jobs near you

Join today
View Shortlist