Find a Carpenter you can trust in Gourock.

Choose from 18 Carpenters, all rated by people like you.

Over 124 reviews & an average rating of 4.8/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
We are a small family run TV Aerial and Satellite company that also specialise in CCTV and TV Wall Mounting too. With o...

Platinum Paving

1 review(s)
Offers services in GOUROCK
My name is William Peacock and I am the owner of Platinum Paving . I have been involved in all aspects of landscaping for ...
We are a small family based company specialising in property home improvement services. House extensions, renovations, lof...

Recent Carpenter Enquiries

10 Apr

Interior work | Stud Walls

Gourock - PA19

Enquiry from: Ian M

Start Date: Immediate

Bedroom ceiling and plasterboard walls stripped out and replaced. Approx. Room size 4m x 5m.

Post a similar request >

11 Sep

Carpentry

Gourock - PA19

Enquiry from: Fiona M

Start Date: Immediate

Replace worktop and possibly new sink and hob

Post a similar request >

25 Jun

Garden | Decking

Gourock - PA19

Enquiry from: Jill H

Start Date: Immediate

an extension onto current decking, already have the materials are you the property owner: owner of the property property type: semi detached what level of service do you require: deck only please cal...

Post a similar request >

29 Mar

Garden | Decking

Gourock - PA19

Enquiry from: Kenny W

Start Date: Immediate

customer in the gourock area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the pro...

Post a similar request >

12 Aug

Garden | Decking

Gourock - PA19

Enquiry from: Vivien R

Start Date: Immediate

decking round area levelled for paddling pool, to allow safe access are you the property owner: owner of the property property type: terrace what level of service do you require: supply and deck pleas...

Post a similar request >

09 Apr

Garden | Sheds

Gourock - PA19

Enquiry from: Rosemary L

Start Date: Immediate

Six feet x four feet.

Post a similar request >

10 Jun

Carpentry

Greenock - PA15

Enquiry from: Eleanor G

Start Date: Immediate

2 doors fitted.. 1 sliding door and one folding door

Post a similar request >

05 Jan

Windows | Wooden | Repair

Port Glasgow - PA14

Enquiry from: Joyce C

Start Date: Immediate

Wooden sills on outside of 2 close windows rotten need replaced. Large windows

Post a similar request >

11 Sep

Garden | Sheds

Greenock - PA15

Enquiry from: Alison C

Start Date: Immediate

build a flat pack plastic shed are you the property owner: tenant (with permission) do you have a: large garden what level of service are you looking for: install please call to appoint

Post a similar request >

02 Jun

Carpentry

Helensburgh - G84

Enquiry from: Margaret G

Start Date: Immediate

I need a cat flap removed,and a new one put in its place.,on my back kitchen door .

Post a similar request >

08 May

Garden | Sheds

Port Glasgow - PA14

Enquiry from: Thomas G

Start Date: Immediate

im looking for a 10x8 shed for storage for motorbikes must have a double door at 1 end to get bikes in and out , to be laid on a slab foundation

Post a similar request >

11 Nov

Windows | Wooden | Repair

Helensburgh - G84

Enquiry from: Eileen M

Start Date: Immediate

A quote for a Replacement window price

Post a similar request >

15 Nov

Carpentry

Greenock - PA15

Enquiry from: Stephen B

Start Date: Immediate

i require the removal of a front door and a replacement installed are you the property owner: owner of the property property type: other what type of job are you looking to have done: other do you re...

Post a similar request >

21 Jul

Carpentry

Greenock - PA16

Enquiry from: Wilma M

Start Date: Immediate

4 new measured and fitted doors ,bedroom/batheroom.one cupboard.lii 368223921ke ones from wiskes, but have no idea how to measure or even attempt fitting are you the property owner: tenant (with permi...

Post a similar request >

07 May

Garden | Decking

Greenock - PA16

Enquiry from: Steffie M

Start Date: Immediate

full decking on the right side of my garden are you the property owner: tenant (with permission) property type: terrace what level of service do you require: supply and deck please call to appoint

Post a similar request >

08 Mar

Carpentry

Helensburgh - G84

Enquiry from: Carol K

Start Date: 1 to 3 months

i need wood or mdf wood panelling in my hall way. also the holes in the skirting boards put right, because i have raised the sockets that where on the skirting boards. also a wood shelf above the hall...

Post a similar request >

05 Feb

Windows | Wooden | Repair

Dunoon - PA23

Enquiry from: Denis H

Start Date: 1 to 3 months

refurbishment of late 60s extention are you the property owner: owner of the property property type: detached what service are you looking for: reglazing how many windows are involved: more than 5 wha...

Post a similar request >

15 Sep

Windows | Wooden | Repair

Greenock - PA16

Enquiry from: Roger L

Start Date: Immediate

flat gets cold when the east wind blows. suspect the windows need to be re-sealed property type: other what service are you looking for: resealing are you the property owner: owner of the property ho...

Post a similar request >

19 Aug

Windows | Wooden | Repair

Largs - KA30

Enquiry from: Alan G

Start Date: Immediate

Livingroom window frames completely rotten, 4 x 1 metre x 0.5 metre

Post a similar request >

21 May

Garden | Sheds

Isle of Cumbrae - KA28

Enquiry from: Richard R

Start Date: Immediate

customer in the isle of cumbrae area made an enquiry a couple of projects including garden shed.call anytime and arrange an appointment to discuss. below is some details about this project: are you th...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Gourock is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Gourock £975-£2,495
Carpenters and joiners in Gourock £375-£575
Plasterboard dry lining in Gourock £638-£978
Wood flooring in Gourock £750-£1,150
Wooden decking in Gourock £1,125-£1,725
Garden shed in Gourock £450-£690
Wooden window repair in Gourock £320-£480

Related Carpenter searches in Gourock

Carpenter FAQs

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Gourock.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Gourock?

View our open Carpenter jobs near you

Join today
View Shortlist