Garden | Sheds
Kelso - TD5
Enquiry from: Naomi B
Start Date: Immediate
Require someone to build a 4x4 shed either 1 window. All materials already purchased including base, door, screws, felt etc
-->
Over 6 reviews & an average rating of 4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Kelso - TD5
Enquiry from: Naomi B
Start Date: Immediate
Require someone to build a 4x4 shed either 1 window. All materials already purchased including base, door, screws, felt etc
Hawick, Newcastleton - TD9
Enquiry from: Douglas L
Start Date: Immediate
are you the property owner: owner of the property property type: other other forms: kitchen fitting agreed to receive quotes for selected products: yes please call to appoint what level of service do...
Hawick, Newcastleton - TD9
Enquiry from: Angus D
Start Date: Less than one month
replace panel on shed door. time scale: less than one month please call to appoint
Hawick, Newcastleton - TD9
Enquiry from: Helen C
Start Date: Immediate
I would like a basic wooden shed 8' 6' feet please
Kelso - TD5
Enquiry from: Mike S
Start Date: Immediate
6ft x 8ft garden shed with the door on the short end
Melrose - TD6
Enquiry from: Boon T
Start Date: Immediate
need two new door to separate kitchen and counter from the flat upstairs . fix new lock to 4 rooms time scale: 1-3 months please call to appoint are you the property owner: relative of owner property...
Kelso - TD5
Enquiry from: Eoin C
Start Date: Immediate
Hello, Can you build and erect a greenhouse / shed combination for me ? Greenhouse 6ft x 8ft (1.83 x 2.44) attached with through door to shed 18ft x 8ft (5.49 x 2.44) with one door. Greenhouse to LH...
Kelso - TD5
Enquiry from: Annie N
Start Date: Immediate
The windows are old and woot
Jedburgh - TD8
Enquiry from: Struan R
Start Date: Immediate
20X10FT STORAGE FOR CHAINSAWS and relevant tools.garden maintanance tools,2x grass cutter.etc Are you the property owner: Tenant (with permission) Do you have a: Large garden What level of service are...
Melrose - TD6
Enquiry from: David S
Start Date: Immediate
8/6 garden shed
Hawick, Newcastleton - TD9
Enquiry from: John R
Start Date: Immediate
6 foot wide x 10 foot long shed no windows door in end
Jedburgh - TD8
Enquiry from: Roydon B
Start Date: Immediate
Homeowner Supplied and fitted Please contact to appoint
Jedburgh - TD8
Enquiry from: Barbara |
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Garden tidy up and maintenance. Wooden disabled ramp.
Hawick, Newcastleton - TD9
Enquiry from: Moira M
Start Date: Immediate
She'd taken down and removed.metal she'd erected.thinking of paving around she'd.
Melrose - TD6
Enquiry from: Lisa B
Start Date: 1 to 3 months
Flat decking laid, fence moved and extended Are you the property owner: Owner of the property Property Type: Semi detached What level of service do you require: Supply and deck Time scale: 1-3 months...
Melrose - TD6
Enquiry from: Steven M
Start Date: 1 to 3 months
Large shed or summerhouse Are you the property owner: Owner of the property Do you have a: Medium size garden What level of service are you looking for: Supply, Install Time scale: 1-3 months Please ...
Melrose - TD6
Enquiry from: Nadine G
Start Date: Immediate
Sanding down and a few small repairs of an old style/cottage wooden floor. Only one room needing done.
Hawick, Newcastleton - TD9
Enquiry from: JOHN G
Start Date: Immediate
I need garden shed erected on a suitable base in my garden. A wooden shed, Size 8 x 6 and preferably with a Pent Roof. Could I have quotes to compare please. Are you the property owner: Tenant (with ...
Hawick, Newcastleton - TD9
Enquiry from: Lynda C
Start Date: Immediate
Wooden garden shed, 5' x 3'; window along 5' side and door on other 5' side. Preferably with bench along 5' inside and with floor. Delivered and set up. Please. Are you the property owner: Tenant (wi...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceCarpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Roxburghshire | £975-£2,495 |
Carpenters and joiners in Roxburghshire | £375-£575 |
Plasterboard dry lining in Roxburghshire | £638-£978 |
Wood flooring in Roxburghshire | £750-£1,150 |
Wooden decking in Roxburghshire | £1,125-£1,725 |
Garden shed in Roxburghshire | £450-£690 |
Wooden window repair in Roxburghshire | £320-£480 |
How Much Plasterboard Do I Need?
Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!
lTake Square Footage Measurement
• Measure the square footage of the area where the plasterboard will be fitted.
• Multiply the height by the width of each wall or ceiling area.
• Add all quantities to obtain a total square-foot amount.
lCalculate Drywall Sheets
• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.
• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).
• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.
We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.
Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.
Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.
A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.
As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.
It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.
It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
If you’re thinking about making improvements to your home, it’s only reasonable to become familiar with the ins and outs of the requirements to make the project a success. Not just the cost involved to complete the project, but also the duration it’ll take to complete the job and lots more. When it comes to the installation of wooden flooring, there’s a need to find out whether or not an underlay is required for the task. In this article, we’re going to consider this in order to ensure that you’re on the right track. Let’s take a look!
First and foremost, underlays are common with carpets as they allow for an even surface with no lumps and bumps. It also provides a deeper barrier between the carpet and the floor as carpets, themselves, aren’t particularly thick enough to provide adequate comfort when walking on them. Underlay also helps improve insulation which in turn, helps cut down your energy bill. So, are underlays also needed with wooden flooring?
In general, wooden flooring does not really need an underlay. This is due to the fact that they’re perfectly comfortable to walk on without the need to add an extra padding underneath. However, the subfloor will have to be made prior to the installation, as a result, an underlay is needed at all there. With that in mind, it’s highly recommended to make use of an underlay when installing a boarded floor to a wooden subfloor mainly due to the fact that it’s able to provide a much-improved insulation. When it comes to wooden flooring, it’s always best to go for quality rather than looking for ways to cut corners. If you’re able to go for the best project with professional installation and little extras like undelay, you’d notice and enjoy the long lasting nature of your wooden flooring immediately after installation.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Roxburghshire.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today