Find a Carpenter you can trust in Bridgnorth.

Choose from 46 Carpenters, all rated by people like you.

Over 35 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist

Recent Carpenter Enquiries

03 May

Carpentry

Bridgnorth - WV15

Enquiry from: John F

Start Date: Less than one month

we need an inspection of our front door to check if it complies with the latest regulations and to carry out any maintenance etc as required. are you the property owner: owner of the property property...

Post a similar request >

31 May

Garden | Sheds

Bridgnorth - WV16

Enquiry from: David S

Start Date: Immediate

Are you the property owner: Tenant (with permission) Property Type: Semi detached Other Forms: 10085, 13 Agreed to recieve quotes for selected products: Yes Please call to appoint

Post a similar request >

04 Jun

Garden | Decking

Bridgnorth - WV16

Enquiry from: Michael W

Start Date: Less than one month

1 want my garden decking its 14 f by 12 f Are you the property owner: Tenant (with permission) Property Type: Other What level of service do you require: Supply and deck Time scale: Less than one m...

Post a similar request >

29 Feb

Kitchen | Fitting

Bridgnorth - WV16

Enquiry from: L

Start Date: Immediate

Change cupboard doors and drawers and maybe tile kitchen floor

Post a similar request >

02 Jun

Carpentry

Cradley Heath - B64

Enquiry from: Derek L

Start Date: Immediate

Hanging seven standard internal doors

Post a similar request >

26 Sep

Garden | Sheds

Kidderminster - DY10

Enquiry from: Sue H

Start Date: Immediate

customer in kidderminster areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 26/09/2023 17:33.please call to arran...

Post a similar request >

25 Aug

Kitchen | Fitting

Halesowen - B62

Enquiry from: Raman K

Start Date: Immediate

Install of a wren kitchen plus appliances (preferable but not mandatory all electric and gas points are available). 13 units including a tower on a bare plaster and painted finish. Plans available on ...

Post a similar request >

03 May

Garden | Sheds

Dudley - DY2

Enquiry from: Paula W

Start Date: Immediate

customer made an enquiry for garden shed and confirmed on the quotatis site they would like quotes from a carpenter.miss lives in the dudley area and would like a call to discuss options.see below det...

Post a similar request >

27 Apr

Carpentry

Halesowen - B63

Enquiry from: Caroline T

Start Date: Less than one month

price to hang 7 interior doors are you the property owner: owner of the property what type of job are you looking to have done: other what level of service do you require: supplied and fitted time sca...

Post a similar request >

09 Nov

Carpentry

Brierley Hill - DY5

Enquiry from: Terry J

Start Date: Less than one month

fitting 6 white grained moulded doors are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors what level of se...

Post a similar request >

07 Oct

Kitchen | Fitting

Halesowen - B62

Enquiry from: Lorraine C

Start Date: Immediate

To install 3 kitchen base units which are already assembled 2 x 300mm kitchen base units 1 x 600mm kitchen base unit to house a Belfast Sink To fit Plinth To install the Belfast Sink & Mixer Tap ...

Post a similar request >

20 Sep

Kitchen | Fitting

Halesowen - B62

Enquiry from: C

Start Date: Immediate

utility room 1. concrete floor needs levelling 2. remove old sink unit 3. fit belfast sink 4. fit 600 base unit for belfast sin 5. fit 400 base unit alongside 6. fit cupboard doors on both units 7. fi...

Post a similar request >

12 Sep

Carpentry

Stourbridge - DY8

Enquiry from: Jamie G

Start Date: Less than one month

12 doors to fit. one sliding door. need to purchase doors as well. are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors how many windows...

Post a similar request >

27 Aug

Kitchen | Fitting

Brierley Hill - DY5

Enquiry from: Jacqueline P

Start Date: Immediate

worktops already purchased to be fitted with cut out for hob and sink, also a mitre to be done are you the property owner: owner of the property what level of service do you require: install only do...

Post a similar request >

13 Aug

Carpentry

Kidderminster - DY11

Enquiry from: Elizabeth G

Start Date: Less than one month

replace 2 spindels secure bannister please are you the property owner: owner of the property property type: other what type of job are you looking to have done: wooden staircases time scale: less than...

Post a similar request >

09 Aug

Kitchen | Fitting

Rowley Regis - B65

Enquiry from: John P

Start Date: Immediate

customer is looking for quotes for kitchen design & installation from pros around rowley regis. please call to arrange appointment to discuss are you the property owner: owner of the property what le...

Post a similar request >

03 Aug

Garden | Sheds

Kidderminster - DY14

Enquiry from: Carole H

Start Date: Immediate

customer in kidderminster areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via telephone and email at 03/08/2022 13:12.please call to...

Post a similar request >

03 Aug

Garden | Decking

Kidderminster - DY14

Enquiry from: Carole H

Start Date: Immediate

customer has a gardening & landscaping project they are looking to have done, specially they want quotes for wooden decking. they are unsure of options so would like to discuss with a carpenter.confir...

Post a similar request >

21 Jul

Garden | Sheds

Halesowen - B63

Enquiry from: Paula T

Start Date: Immediate

I need my polycarbonate 6x4 greenhouse installing and also my apex metal shed 6x8 ...the ground is not level so that would need to be done too ...

Post a similar request >

30 Jun

Carpentry

Rowley Regis - B65

Enquiry from: Tarjinder D

Start Date: Immediate

replacement of rear garage door are you the property owner: relative of owner what type of job are you looking to have done: wooden window/doors do you require a door(s): back door what level of servi...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Bridgnorth is:

£846

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Bridgnorth £975-£2,495
Carpenters and joiners in Bridgnorth £375-£575
Plasterboard dry lining in Bridgnorth £638-£978
Wood flooring in Bridgnorth £750-£1,150
Wooden decking in Bridgnorth £663-£1,863
Garden shed in Bridgnorth £325-£795
Wooden window repair in Bridgnorth £320-£480

Related Carpenter searches in Bridgnorth

Carpenter FAQs

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Bridgnorth.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Bridgnorth?

View our open Carpenter jobs near you

Join today
View Shortlist