Find a Carpenter you can trust in Crewkerne.

Choose from 28 Carpenters, all rated by people like you.

Over 78 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

Advertisement
View Shortlist
Verified Pro

Rightway Environmental

0 review(s)
Offers services in CREWKERNE
Rightway Environmental are an Asbestos removal company that have been independently licensed by the Health and Safety Exec...
Verified Pro

Orchard Landscapes

3 review(s)
Offers services in CREWKERNE
Hi, I’m Lewis from Orchard landscapes we operate in all driveway and patio needs we also do fencing turfing and Astroturf ...

Jwh property maintenance

0 review(s)
Offers services in CREWKERNE
Hi we cover all aspects of fencing from Minor repairs such as broken post and panels to Total replacement many types of fe...

Recent Carpenter Enquiries

07 Oct

Garden Decking

Yeovil - BA22

Enquiry from: Karen C

Start Date: Immediate

Garden decking wooden - Measurement second half front 1.69 m (169 cm, 5′ 6″) Measurement half back left side 2.27 m (227 cm, 7′ 5″) Measurement across front 3.19 m (319 cm, 10′ 6″) Measur

Post a similar request >

05 Aug

Garden Shed

Chard - TA20

Enquiry from: Keith T

Start Date: Immediate

5ft width, d*** ,hei*** (max) 2 doors Pref . A floor and roof lower at front than back

Post a similar request >

15 Jul

Garden Shed

Somerton - TA11

Enquiry from: Sid D

Start Date: Immediate

To erect a 15 x 8 modular pent roof shed on existing concrete base

Post a similar request >

09 Jun

Garden Shed

Axminster - EX13

Enquiry from: Victoria D

Start Date: Immediate

Wooden window repair Lead

Need a shed installed 8x8

Post a similar request >

10 Apr

Garden Decking

Ilminster - TA19

Enquiry from: Dillian M

Start Date: Immediate

Replacement of deck and supporting structure approx 3mx20m

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Crewkerne is:

£943

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Crewkerne £975-£2,495
Carpenters and joiners in Crewkerne £375-£575
Plasterboard dry lining in Crewkerne £638-£978
Wood flooring in Crewkerne £750-£1,150
Wooden decking in Crewkerne £1,125-£1,725
Garden shed in Crewkerne £475-£1,595
Wooden window repair in Crewkerne £320-£480

Related Carpenter searches in Crewkerne

Carpenter FAQs

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to find an installer for wooden flooring?

After making the decision to install a new wooden flooring in your home, the next obvious step is finding the right installer to get the job done. When a wooden floor is fitted and properly maintained by the right professional, it will not only outlive the owner but also survive several generations. As a result, finding the perfect installer for your task should be a top priority to get the best return on investment. Here are a few sources that will put you in the right direction to finding a reliable wood flooring installation company.

• Friends, Relatives & Neighbours

If you have a friend, relative or neighbour that has a wooden floor installed in their homes, you can go for a visit to check out the work done. If you’re pleased with the work done, you can proceed to ask about the work ethics of the installer and get the contact if satisfied.

• Store Contact Lists

You’ll discover a long list of wooden flooring contractors on many stores trading flooring materials. These installers may not be affiliated with the store owners, but many stores see it as their responsibility to point you in the right direction so that the flooring material acquired from them can be put to good use.

• Internet

With the rapid rise of online technology, there’s hardly a service you can’t find on the internet. Websites like HomeAdvisor have been helping people find their desired service providers with relative ease for so long. To get the right installer online, it’s advisable to check reviews as well as testimonials before moving forward. Nowadays, you’re most likely going to find so many positive online reviews as some businesses now go to the extent of dubiously writing good reviews for their companies. As a result, it’s recommended to pay closer attention to the negative reviews and check if it’s something you can cope with before hiring an installer for your wooden flooring.

Click here to learn more about wood flooring.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Crewkerne.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Crewkerne?

View our open Carpenter jobs near you

Join today
View Shortlist