Carpentry
Glastonbury - BA6
Enquiry from: Charles B
Start Date: Immediate
We are looking to replace an old staircase that is mid 1950s and has small steps. Just looking for a simple staircase in similar style
Over 76 reviews & an average rating of 4/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Glastonbury - BA6
Enquiry from: Charles B
Start Date: Immediate
We are looking to replace an old staircase that is mid 1950s and has small steps. Just looking for a simple staircase in similar style
Glastonbury - BA6
Enquiry from: William C
Start Date: 1 to 3 months
replacement outdoor staircase wanted for a first floor door at the rear of a garage. ideally it would be steel/weatherproof. i look forward to hearing from you. happy to provide a video of the stairca...
Glastonbury - BA6
Enquiry from: Jacqueline H
Start Date: Immediate
customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: other, work description: removal of earth and a couple of sleepers. paving required, very small area.to enab...
Glastonbury - BA6
Enquiry from: Mandy S
Start Date: Less than one month
relatively small job - renovation of built in wardrobe - doors sanded and rehung, new clothes railing installed and airing cupboard shelving required.
Glastonbury - BA6
Enquiry from: Stephen D
Start Date: Immediate
Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 72sq.ft, Property type: House, Work description: fit an ikea kitchen
Yeovil - BA22
Enquiry from: Karen C
Start Date: Immediate
Garden decking wooden - Measurement second half front 1.69 m (169 cm, 5′ 6″) Measurement half back left side 2.27 m (227 cm, 7′ 5″) Measurement across front 3.19 m (319 cm, 10′ 6″) ...
Bridgwater - TA6
Enquiry from: Greg G
Start Date: Immediate
i HAVE AN *** METAL SHED started to build but I have no idea how to finish it. Need help to build shed.
Somerton - TA11
Enquiry from: Sid D
Start Date: Immediate
To erect a 15 x 8 modular pent roof shed on existing concrete base
Bridgwater - TA6
Enquiry from: Tessa J
Start Date: Immediate
One side of a shed needs sorting out
Langport - TA10
Enquiry from: Richard N
Start Date: Immediate
Looking to get Shutters for 6 windows and and minor repairs on one of the 6, however it will have to remain in place for the repairs and connot be removed.
Martock - TA12
Enquiry from: Mandy D
Start Date: Immediate
Hello do you do wall panelling? I have a bedroom wall I would like panelled. If you do, would you be able to give me a price. I can supply the measurements of the wall and pictures of the style I pr...
Langport - TA10
Enquiry from: Brett C
Start Date: Immediate
hanging of two oak laminate internal doors. are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors property type: semi detached how many w...
Martock - TA12
Enquiry from: Rebecca P
Start Date: Immediate
Skirting boards in downstairs toilet, hall and part of kitchen
Bridgwater - TA6
Enquiry from: Patricia F
Start Date: Immediate
Hi, the jobs that need doing are a new threshold on the front door plus the door will need trimming to fit a draught excluder. Also on this door a new bigger letter box and new handles and lock cut in...
Wincanton - BA9
Enquiry from: Robyn D
Start Date: Immediate
Hi there, we are just about to purchase a new property at the above address. It needs a lot of work before we even think about carpentry but im retreiving some quotes for when the time comes. ...
Somerton - TA11
Enquiry from: Ann A
Start Date: Immediate
Shelves fitted in alcove in bathroom
Wincanton - BA9
Enquiry from: Phil G
Start Date: Immediate
I’ve installed some cupboards, I was looking for assistance in cutting the side trims. I have 4 lengths that need cutting with a table saw, which I unfortunately don’t have. Are you able to assist...
Bridgwater - TA6
Enquiry from: Neil H
Start Date: Immediate
Hi Dave, Jill and I have a few jobs, mainly involving wood but a couple of others to do with cement and plaster.. could you come round and advise, cheers Neil
Wincanton - BA9
Enquiry from: Sue H
Start Date: Immediate
We were flooded in May and the insurance company want a quote to repair or replace our front and back doors. Initially we thought repair but to be honest I think the front door needs replacing as it w...
Wincanton - BA9
Enquiry from: Nikki G
Start Date: Immediate
A new off the shelf wooden door fitted to an outside office - or major repair - urgently for security reasons
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Glastonbury | £975-£2,495 |
| Carpenters and joiners in Glastonbury | £375-£575 |
| Plasterboard dry lining in Glastonbury | £638-£978 |
| Wood flooring in Glastonbury | £750-£1,150 |
| Wooden decking in Glastonbury | £1,125-£1,725 |
| Garden shed in Glastonbury | £1,817-£3,730 |
| Wooden window repair in Glastonbury | £320-£480 |
How To Fit Plasterboard
If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.
To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.
Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.
• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit
• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.
• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.
• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
How To Put Up Plasterboard
Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.
Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.
• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.
• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Glastonbury.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today