Find a Carpenter you can trust in Glastonbury.

Choose from 41 Carpenters, all rated by people like you.

Over 76 reviews & an average rating of 4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Rightway Environmental

0 review(s)
Offers services in GLASTONBURY
Rightway Environmental are an Asbestos removal company that have been independently licensed by the Health and Safety Exec...

Dorel Construction

0 review(s)
Offers services in GLASTONBURY
quality to the customer's taste and professionalism

D&B Services

0 review(s)
Offers services in GLASTONBURY
We're a family run company, based in Somerset, We undertake most landscaping jobs and any footing, concrete bases, drainag...

Smile Solar

0 review(s)
Offers services in GLASTONBURY
We are UK wide solar energy installers, powering life at home to be more affordable now and in the future. We specialise i...

Recent Carpenter Enquiries

12 Apr

Carpentry

Glastonbury - BA6

Enquiry from: Charles B

Start Date: Immediate

We are looking to replace an old staircase that is mid 1950s and has small steps. Just looking for a simple staircase in similar style

Post a similar request >

19 Oct

Carpentry

Glastonbury - BA6

Enquiry from: William C

Start Date: 1 to 3 months

replacement outdoor staircase wanted for a first floor door at the rear of a garage. ideally it would be steel/weatherproof. i look forward to hearing from you. happy to provide a video of the stairca...

Post a similar request >

08 Mar

Garden | Sheds

Glastonbury - BA6

Enquiry from: Jacqueline H

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: other, work description: removal of earth and a couple of sleepers. paving required, very small area.to enab...

Post a similar request >

06 Dec

Carpentry

Glastonbury - BA6

Enquiry from: Mandy S

Start Date: Less than one month

relatively small job - renovation of built in wardrobe - doors sanded and rehung, new clothes railing installed and airing cupboard shelving required.

Post a similar request >

27 Mar

Kitchen | Fitting

Glastonbury - BA6

Enquiry from: Stephen D

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 72sq.ft, Property type: House, Work description: fit an ikea kitchen

Post a similar request >

07 Oct

Garden | Decking

Yeovil - BA22

Enquiry from: Karen C

Start Date: Immediate

Garden decking wooden - Measurement second half front 1.69 m (169 cm, 5′ 6″) Measurement half back left side 2.27 m (227 cm, 7′ 5″) Measurement across front 3.19 m (319 cm, 10′ 6″) ...

Post a similar request >

17 Sep

Garden | Sheds

Bridgwater - TA6

Enquiry from: Greg G

Start Date: Immediate

i HAVE AN *** METAL SHED started to build but I have no idea how to finish it. Need help to build shed.

Post a similar request >

15 Jul

Garden | Sheds

Somerton - TA11

Enquiry from: Sid D

Start Date: Immediate

To erect a 15 x 8 modular pent roof shed on existing concrete base

Post a similar request >

26 May

Garden | Sheds

Bridgwater - TA6

Enquiry from: Tessa J

Start Date: Immediate

One side of a shed needs sorting out

Post a similar request >

18 Jul

Carpentry

Langport - TA10

Enquiry from: Richard N

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead

Looking to get Shutters for 6 windows and and minor repairs on one of the 6, however it will have to remain in place for the repairs and connot be removed.

Post a similar request >

27 Jun

Carpentry

Martock - TA12

Enquiry from: Mandy D

Start Date: Immediate

Hello do you do wall panelling? I have a bedroom wall I would like panelled. If you do, would you be able to give me a price. I can supply the measurements of the wall and pictures of the style I pr...

Post a similar request >

02 May

Carpentry

Langport - TA10

Enquiry from: Brett C

Start Date: Immediate

hanging of two oak laminate internal doors. are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors property type: semi detached how many w...

Post a similar request >

11 Apr

Carpentry

Martock - TA12

Enquiry from: Rebecca P

Start Date: Immediate

Skirting boards in downstairs toilet, hall and part of kitchen

Post a similar request >

14 Dec

Carpentry

Bridgwater - TA6

Enquiry from: Patricia F

Start Date: Immediate

Hi, the jobs that need doing are a new threshold on the front door plus the door will need trimming to fit a draught excluder. Also on this door a new bigger letter box and new handles and lock cut in...

Post a similar request >

20 Nov

Carpentry

Wincanton - BA9

Enquiry from: Robyn D

Start Date: Immediate

Hi there, we are just about to purchase a new property at the above address. It needs a lot of work before we even think about carpentry but im retreiving some quotes for when the time comes. ...

Post a similar request >

12 Nov

Carpentry

Somerton - TA11

Enquiry from: Ann A

Start Date: Immediate

Shelves fitted in alcove in bathroom

Post a similar request >

19 Sep

Carpentry

Wincanton - BA9

Enquiry from: Phil G

Start Date: Immediate

I’ve installed some cupboards, I was looking for assistance in cutting the side trims. I have 4 lengths that need cutting with a table saw, which I unfortunately don’t have. Are you able to assist...

Post a similar request >

15 Sep

Carpentry

Bridgwater - TA6

Enquiry from: Neil H

Start Date: Immediate

Hi Dave, Jill and I have a few jobs, mainly involving wood but a couple of others to do with cement and plaster.. could you come round and advise, cheers Neil

Post a similar request >

06 Sep

Carpentry

Wincanton - BA9

Enquiry from: Sue H

Start Date: Immediate

We were flooded in May and the insurance company want a quote to repair or replace our front and back doors. Initially we thought repair but to be honest I think the front door needs replacing as it w...

Post a similar request >

30 Aug

Carpentry

Wincanton - BA9

Enquiry from: Nikki G

Start Date: Immediate

A new off the shelf wooden door fitted to an outside office - or major repair - urgently for security reasons

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Glastonbury is:

£1,191

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Glastonbury £975-£2,495
Carpenters and joiners in Glastonbury £375-£575
Plasterboard dry lining in Glastonbury £638-£978
Wood flooring in Glastonbury £750-£1,150
Wooden decking in Glastonbury £1,125-£1,725
Garden shed in Glastonbury £1,817-£3,730
Wooden window repair in Glastonbury £320-£480

Related Carpenter searches in Glastonbury

Carpenter FAQs

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to fit plasterboard?

How To Fit Plasterboard

If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.

To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.

Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.

• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit

• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.

• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.

• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Glastonbury.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Glastonbury?

View our open Carpenter jobs near you

Join today
View Shortlist