Find a Carpenter you can trust in South Yorkshire.

Choose from 74 Carpenters, all rated by people like you.

Over 59 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Damp Defender UK

0 review(s)
Offers services in SOUTH YORKSHIRE
With over 30 years of experience, we're your trusted specialists in treating rising damp, penetrating damp, condensation a...
Verified Pro

Trent Doors

0 review(s)
Offers services in SOUTH YORKSHIRE
Trent Doors is a dedicated provider of affordable garage door services, proudly catering to residential properties. Founde...
Verified Pro

Clean City Management UK

0 review(s)
Offers services in SOUTH YORKSHIRE
We do Professional landscaping services with your budgets.
Verified Pro

Jhdm services

0 review(s)
Offers services in SOUTH YORKSHIRE
JHDM Services has over 7 years of experience providing reliable, high-quality property maintenance and handyman services. ...

Recent Carpenter Enquiries

19 Aug

Carpentry

Doncaster - DN2

Enquiry from: Pat W

Start Date: Immediate

replace several skirting boards

Post a similar request >

28 Jul

Kitchen | Fitting

Rotherham - S63

Enquiry from: Tracy T

Start Date: Immediate

Prices on fitting a kitchen and work top

Post a similar request >

16 Jun

Kitchen | Fitting

Doncaster - DN3

Enquiry from: Mike H

Start Date: Immediate

Replace all worktops and kitchen sink.

Post a similar request >

21 Feb

Kitchen | Fitting

Sheffield - S13

Enquiry from: Earl A

Start Date: Immediate

Refurbishing current kitchen work surface, Supply and fit current workspaces and sides, removal of old work surfaces and side

Post a similar request >

13 Aug

Garden | Sheds

Doncaster - DN11

Enquiry from: Justin M

Start Date: Immediate

To supply and fit a small shed to house a lawn mower and a few other bits, to also include I stalling a hard base for it to sit on such as slabs.

Post a similar request >

17 Jul

Garden | Decking

Doncaster - DN11

Enquiry from: Samantha D

Start Date: Immediate

Small patio, path, steps

Post a similar request >

13 May

Garden | Decking

Barnsley - S72

Enquiry from: Joan K

Start Date: Immediate

I have a decking 330cm x 1010cm, the top of the decking is in bad condition and needs replacing, could you please let me know an estimate for the top removing and replacing, also two decking steps up ...

Post a similar request >

09 May

Garden | Decking

Doncaster - DN8

Enquiry from: Dariusz B

Start Date: Immediate

Decking fitting on top of concrete/tiles 3.6m x 4.3m

Post a similar request >

05 Jan

Flooring | Wooden

Doncaster - DN4

Enquiry from: David H

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

laminate flooring and skirting boards are you the property owner: owner of the property how many rooms are you looking to update with wood flooring: 1-2 rooms what level of service do you require: fi...

Post a similar request >

30 Sep

Windows | Wooden | Repair

Doncaster - DN4

Enquiry from: Richard I

Start Date: 1 to 3 months

i need three sections/wooden pieces of my wooden greenhouse replacing and all 8 polyurethane top windows replacing and making secure. are you the property owner: owner of the property property type: ...

Post a similar request >

25 Sep

Kitchen | Fitting

Rotherham - S65

Enquiry from: Neil F

Start Date: Immediate

a kitchen removed a new one installed + plumbing and electric to cooker are you the property owner: owner of the property what level of service do you require: install only do you have all of the requ...

Post a similar request >

15 Aug

Kitchen | Fitting

Sheffield - S6

Enquiry from: Jane C

Start Date: Immediate

Hi, We are having a kitchen fitted in October and require some plumbing and electrical work before the kitchen fitters arrive. Also underfloor heating. Is that something your company could do? We ...

Post a similar request >

09 Jul

Carpentry

Barnsley - S75

Enquiry from: Simon R

Start Date: Immediate

Wooden window repair Lead

kitchen worktops fitted. wickes solid oak 26mm. hob and sink need cut out. are you the property owner: owner of the property what type of job are you looking to have done: other property type: detache...

Post a similar request >

02 Jul

Carpentry

Doncaster - DN9

Enquiry from: Debrah B

Start Date: Immediate

I’d like to explore having sliding wardrobes fitted in my bedroom. One wall is 3.23 and the other is 2.2m both 2.36 m high

Post a similar request >

29 Mar

Garden | Sheds

Doncaster - DN8

Enquiry from: Lee E

Start Date: Immediate

Area at rear of ga*** × 28ft needs clearing of vegetation, leveling & concrete laid for shed. 1 fence panel needs replacing

Post a similar request >

30 Jan

Kitchen | Fitting

Sheffield - S13

Enquiry from: Kiever T

Start Date: Immediate

Hiya, was wondering if you could help. I have some new square edge laminate worktops that I need bolting together at the corner joint, possibly a masons mitre joint. Is this a service you would quo...

Post a similar request >

04 Dec

Kitchen | Fitting

Sheffield - S5

Enquiry from: Zeru H

Start Date: Immediate

Kitchen work top installation

Post a similar request >

02 Dec

Kitchen | Fitting

Sheffield - S35

Enquiry from: Gabor F

Start Date: Immediate

A new kitchen with appliences, oven and dihwaser included.

Post a similar request >

30 Nov

Kitchen | Fitting

Sheffield - S8

Enquiry from: Rebecca I

Start Date: Immediate

new flooring required. plumbing added to where fridge used to be for washing machine. shelves added above washing machine (open is fine) dishwasher installed near sink (plumbing/electric exists as tha...

Post a similar request >

24 Oct

Windows | Wooden | Repair

Sheffield - S5

Enquiry from: Gulfraz K

Start Date: 1 to 3 months

wooden bay window sill repair and need wooden patio door are you the property owner: owner of the property property type: semi detached what service are you looking for: frame repair how many windows ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in South Yorkshire is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in South Yorkshire £975-£2,495
Carpenters and joiners in South Yorkshire £375-£575
Plasterboard dry lining in South Yorkshire £638-£978
Wood flooring in South Yorkshire £750-£1,150
Wooden decking in South Yorkshire £1,125-£1,725
Garden shed in South Yorkshire £450-£690
Wooden window repair in South Yorkshire £320-£480

Related Carpenter searches in South Yorkshire

Carpenter FAQs

How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
What is the supply cost of wooden flooring

Being the primary material used in wooden flooring installation, the floorboards are the main supply costs. With that in mind, you should also know that there are a large variety of wooden flooring types to select from, each with their unique pros and cons which should all be considered before making a purchase decision. If you’re looking to get the supply cost of wooden flooring in the UK, then you’ve come to the right place! Here is a basic price guide of various and some of the most popular types of floorboards.

If you wish to go for an engineered wood flooring, this looks better when compared to laminate and is more affordable than solid wood. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Laminate flooring, on the other hand, is also quite cheap, easy to install and quite hardwearing, however it tends to warp over time as a result of exposure to moisture and it also happens to be the least attractive of all the other flooring types. You can expect to pay within the range of £10 to about £50 per square metre for this wood flooring type.

Solid wood flooring is a great option with a better look and feel to it. However, it also tends to warp over time and more difficult to install as against laminate. You can expect to pay within the range of £20 to about £100 per square metre for this wood flooring type.

Parquet flooring is long lasting and very attractive, but quite expensive to have fitted.  You can expect to pay within the range of £25 to about £200 per square metre for this wood flooring type.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in South Yorkshire.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in South Yorkshire?

View our open Carpenter jobs near you

Join today
View Shortlist