- Plan your shed base
You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
- A concrete base laid on hardcore
- Concrete slabs on sharp sand
- Treated wood beams on hardcore or shingle
- An interlocking plastic system
- Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
- Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
- Put up the shed walls
- Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
- Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
- Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
- Fit the roof
- If the shed comes with a support bar, put this in position before you put the roof panels in.
- Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
- Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
- Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
- Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
- Add the shed windows
- Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
- From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
- Fix the window beading on the top and sides with 25mm nails.
- Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Find a Carpenter you can trust near you.
Choose from 1126 Carpenters, all rated by people like you.
Over 1845 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Enter your location to refine your search
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you
First Choice
Abacus Restoration
Bee Cosy Conservatory Insulation
Thomas Roof Restoration
Rightway Environmental
J Ball & Son
Find a local Carpenter you can trust...
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter is:
£1,413
| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting | £1,225-£3,687 |
| Carpenters and joiners | £333-£2,889 |
| Plasterboard dry lining | £377-£1,097 |
| Wood flooring | £750-£1,150 |
| Wooden decking | £744-£4,444 |
| Garden shed | £518-£1,793 |
| Wooden window repair | £168-£558 |
Carpenter service qualifications and accreditations
Carpenters qualifications and also certification's: Having the appropriate training and learning exactly how to do your profession is essential for any trade including Carpenters. View the profile of each Carpenter you are looking at to see what accreditation they hold and also what trade associations they belong to. Some trade associations that Carpenters might possibly be a member of include: HomePro, Federation of Master Builders, Guild of Master Craftsmen. Equally Carpenters might also have the following accreditations: BM TRADA, Chartered Institute of Building, City and Guilds.
Unlike electrical or gas work, carpentry is a different profession where no particular certification is legally required for a carpenter to possess. Generally speaking, the only thing you’ll need so as to practice the trade as well as carry out on site work is to demonstrate your competence as a carpenter. To do this, there’s a number of ways you can consider but one which clearly stands out is to complete a portfolio of work and also earn the NVQ Level 2 Carpentry qualification.
In order to obtain your NVQ Level 2 certification, there’s a need for you to actually learn the trade. You can do this through apprenticeship, working alongside an established carpenter and gradually learning the trade from them. However, it should be noted that it’ll take a couple of years to climb up the ladder from an apprentice to a fully-fledged carpenter. Therefore, if you want to start your new carpentry career sooner rather than later, you might want to consider enrolling on an accredited carpentry training course.
Insurance for Carpenters: Any individual who works in your house, including Carpenters, really should have valid public liability insurance, which safeguards you the house owner and also the Carpenter should unfortunately anything go wrong while they are doing the work. Planning permission for Carpenters Most of the tasks that a Carpenter will do for you will not require planning permission unless its a listed property. Definitely discuss with the Carpenter if planning permission would be needed for the job you are doing, they can suggest the steps that require to be taken.
Services offered by Carpenter
Generally, carpenters are skilled craftsmen who are trained to work in construction as well as cabinet making industry. When it comes to making things with wood, they’re able to fabricate all sorts of wood constructions; from minor projects like custom kitchens or ornate details on wood trim to major ones like carrying out the entire framework of buildings. With that in mind, let’s take a more in depth look at what carpenters does.
In general, carpenters carry out a wide array of unique job duties which depends on whether they work in rough carpentry or finished carpentry. What’s more? There are a number of areas in which carpenters can specialize in special types of wood products or engage in specialized carpentry processes.
For rough carpentry, this typically involves carpenters who work on large scale construction projects where they make use of blueprints to determine the amount as well as type of material required for a job. When they work, they may need to build sleds to haul timber via wooded areas and rough terrain where motorized vehicles cannot access. Finished carpentry, on the other hand, involves carpenters who are skilled in making cabinetry, furniture, models as well as instruments. They’re also able to make ornate, detailed as well as fine wood products for a number of different uses. They must be able to work efficiently on a small scale while also being detailed oriented.
There are a variety of tasks you can employ a Carpenter for, as well as some of one of the most typical jobs that Carpenter are asked to do consist of:
Carpenter FAQs
Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.
Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:
- Incorporate flexible wood on concrete adhesives.
- With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
- Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
- Put 10mm spacers against the wall to see to the consistency in expansion gaps.
- Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
- Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
- Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
To install onto plywood, you can follow this guide:
- Make use of a porta-nailer.
- Position 10mm spacers against the wall - parallel with the installation direction.
- Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
- Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
- Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
- Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
- Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
- Add a central step riser to stairs wider than 900mm to prevent them buckling
- Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
- Step treads (the actual step themselves)
- Step risers
- Coach screws
- Deck screws
- Saw
- Drill
- Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
- Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
- Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
- After drilling pilot holes, screw the treads into the risers at each end with deck screws.
- If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
- Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
- Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
- Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in your area.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter?
View our open Carpenter jobs near you
Join todayRecent Carpenter Enquiries
Carpentry
Bungay - NR35
Enquiry from: David N
Start Date: Immediate
I have2 brick-weave steps leading to my front door, the brick-weave has timber to both side which have rotted and need to be set in and bolted together
Garden Decking
Sandhurst - GU47
Enquiry from: Gordon D
Start Date: Immediate
Have two of my front garden stairs come loose need them reset
Carpentry
Whitchurch - SY13
Enquiry from: Vincent F
Start Date: Immediate
Put a new loft hatch in hallway ceiling cut out. Put new loft ladder up . Loft ladder provided
Wooden Window Repair
Diss, Eye - IP21
Enquiry from: Nick N
Start Date: Immediate
Cottage years old. Need some repairs to 2 wooden windows and replacement of 1 (small)
Garden Shed
Clydebank - G81
Enquiry from: Elizabeth L
Start Date: Immediate
Some one to pull an old shed down
Wood Flooring
Sunderland - SR5
Enquiry from: Ramona D
Start Date: Immediate
Flooring and skirting board for one bedroom 15m square
Carpentry
Preston - PR1
Enquiry from: Tanveer H
Start Date: Immediate
Units to be made in the attic as this is a loft conversion completed need shelves fitting
Wooden Window Repair
Carrickfergus - BT38
Enquiry from: Samuel J
Start Date: Immediate
I have 10 windows which are double glazed with wood. That's the way house was built in 1990. The windows are ok but many of the slips externally are showing signs of rot. Could you repair such slips a
Wooden Window Repair
West Kilbride - KA23
Enquiry from: Allan G
Start Date: Immediate
Dormer window wood needs repaired/replaced
Stud Wall & Plasterboard
London - E13
Enquiry from: Victorino P
Start Date: Immediate
Room partitioing and wood flooring repairs
Carpentry
Herne Bay - CT6
Enquiry from: Jimmy J
Start Date: Immediate
To Hang 6 internal doors
Wooden Window Repair
Cupar - KY14
Enquiry from: Sue H
Start Date: Immediate
I need 2 wooden outside window sills replacing with wooden sills as in conservation area approx. 69 inches long on my ground floor flat
Carpentry
Pudsey - LS28
Enquiry from: Joanne B
Start Date: Immediate
Non standard outhouse doors and frames need repair or replacement. Would also like a quote for a gate installation. If you can call me, fabulous. Thanks
Kitchen Fitting
London - SE18
Enquiry from: Mai D
Start Date: Immediate
A worktop has sunk from the wall slightly behind the sink. Can it be restored?
Wood Flooring
Littlehampton - BN17
Enquiry from: Mike K
Start Date: Immediate
Having carpet replaced top landing some floor boards need replacing
Carpentry
Gloucester - GL2
Enquiry from: Hayley M
Start Date: Immediate
I would like a sliding door replaced with a French doors
Kitchen Fitting
Morecambe - LA3
Enquiry from: Cena J
Start Date: Immediate
I had an upstand on the kitchen worktop but I want installed wall board splashback same decor as my worktop
Garden Decking
London - W9
Enquiry from: Alex M
Start Date: Immediate
Replace old decking in garden. 5x4m
Wood Flooring
Sutton Coldfield - B75
Enquiry from: Theresa i
Start Date: Immediate
2 laminate floor boards need replacing and small area of uneven wooden floor made good. spare floorboards replaced. its near the edge of a kitchen so doesn't need lots of boards lifting
Wood Flooring
Gerrards Cross - SL9
Enquiry from: Ash B
Start Date: Immediate
I need to fit skirting in Snug Room, Lounge and Dinning room
Carpenter in your region
- Carpenter Scotland
- Carpenter Northern Ireland
- Carpenter North East
- Carpenter North West
- Carpenter East Midlands
- Carpenter West Midlands
- Carpenter Wales
- Carpenter South West
- Carpenter South East
- Carpenter Greater London
- Carpenter Isle of Man
- Carpenter Channel Islands
- Carpenter Yorkshire & Humberside
- Carpenter East Anglia