Find a Carpenter you can trust in Houghton Le Spring.

Choose from 24 Carpenters, all rated by people like you.

Over 62 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

C&L Surfacing

0 review(s)
Offers services in HOUGHTON LE SPRING
Here at C&L Surfacing We use only the highest quality resin bound products – backed by up to a 25-year manufacturer warr...
Verified Pro
At Green, Clean & Handy Homes Property Solutions, we specialize in transforming your gardens and patios into beautiful, fu...

Recent Carpenter Enquiries

16 Sep

Carpentry

Houghton le Spring - DH4

Enquiry from: Peter S

Start Date: Immediate

Old style stair bannister would like ideas and costs on how to modernise our stair bannister

Post a similar request >

20 Mar

Carpentry

Houghton le Spring - DH4

Enquiry from: Colin N

Start Date: 1 to 3 months

oak staircase refurbish with glass panels. panels not to have any chrome hangers are you the property owner: owner of the property property type: detached what type of job are you looking to have do...

Post a similar request >

11 Sep

Carpentry

Houghton le Spring - DH5

Enquiry from: Alan P

Start Date: Immediate

i need a door installer to installer french doors into what is currently a single door space. so new framing and fitting of double doors. this could lead to other work rrquired on site. are you the p...

Post a similar request >

11 Aug

Garden | Sheds

Houghton le Spring - DH5

Enquiry from: Bill J

Start Date: Immediate

Cutting of grass Trim bushes Planning further developments - shed, greenhouse, raised beds for veg growing in 2023

Post a similar request >

16 Nov

Garden | Decking

Houghton le Spring - DH5

Enquiry from: Nicola R

Start Date: Immediate

customer made an enquiry for wooden decking and confirmed on the quotatis site they would like quotes from a landscaper.miss lives in the houghton le spring area and would like a call to discuss optio...

Post a similar request >

25 Jul

Garden | Decking

Houghton le Spring - DH5

Enquiry from: James S

Start Date: Immediate

approx. 20 square metres timber decking on existing flag stones with membrane required on top of flags are you the property owner: owner of the property property type: semi detached what level of serv...

Post a similar request >

05 Jul

Garden | Decking

Houghton le Spring - DH5

Enquiry from: James S

Start Date: Immediate

approx. 20 square metres timber decking on existing flag stones with membrane required on top of flags are you the property owner: owner of the property property type: semi detached what level of serv...

Post a similar request >

14 Jun

Garden | Decking

Houghton le Spring - DH4

Enquiry from: David S

Start Date: Immediate

remove old decking and instal new approx 4m x 4m are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to ap...

Post a similar request >

22 Mar

Garden | Decking

Houghton le Spring - DH5

Enquiry from: VICTORIA F

Start Date: Immediate

would like a price for decking in the garden are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

31 Jul

Kitchen | Fitting

Houghton le Spring - DH4

Enquiry from: Chris B

Start Date: Immediate

to instil a full kitchen

Post a similar request >

19 Sep

Kitchen | Fitting

Houghton le Spring - DH5

Enquiry from: Melanie W

Start Date: Immediate

i have ordered a new Kitchen and would like a price to remove the old one and fit the new one. minmal plumbing required and one additional electic socket to fit. old kitchen to be taken away.

Post a similar request >

07 Jul

Garden | Sheds

Houghton le Spring - DH5

Enquiry from: Don S

Start Date: Immediate

We are looking to have a corner shed for our garden and would appreciate a quote please

Post a similar request >

27 Mar

Garden | Decking

Houghton le Spring - DH4

Enquiry from: Paul H

Start Date: Immediate

Front steps to be added onto our existing white decking on caravan at Wotton Castle Country Park Supplied and fitted Please contact to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Houghton Le Spring is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Houghton Le Spring £975-£2,495
Carpenters and joiners in Houghton Le Spring £375-£575
Plasterboard dry lining in Houghton Le Spring £638-£978
Wood flooring in Houghton Le Spring £750-£1,150
Wooden decking in Houghton Le Spring £1,125-£1,725
Garden shed in Houghton Le Spring £450-£690
Wooden window repair in Houghton Le Spring £320-£480

Related Carpenter searches in Houghton Le Spring

Carpenter FAQs

How much does it cost to hire a carpenter?

Considerations

If you're thinking about making changes around your household that include working with wood, you ought to hire a local carpenter. Looking to fix a loose piece? Or looking for some drastic improvements? A carpentry expert might be the top choice.

General carpenters are expert woodsmen and know a variety of areas from grounds to gear. Maximum carpentry depends on a rudimentary set of skills which your worker may choose to build upon by specialising. For example, few carpenters have a talent for wood repair, building original constructions or manufacturing furniture.

Time

The extent of time it takes to complete a certain project is another consideration to be kept in mind. This is particularly essential if you are on a constricted timeline or dealing with time limitations. Most carpentry projects take about 13 hours to finish. Although, this is purely dependent on the intricacy of the project and the pre-arranged timeline you and your carpenter agree to.

The cost to hire a general carpenter in the UK amounts to £20 to £25 per hour on an average. Though, it is always imperative to speak with a professional in carpentry services about this.

General Carpentry Costs in the UK:

• National Minimum Cost is £20

• National Maximum Cost is £25

• The national average is around £22

Cost Comparison of Popular Carpentry Services in the UK (Average Hourly Rate):

• Furniture Refinishing is around £17

• A Cabinet Repair is around £23

• Finish Carpentry will set you back a minimum of £30

• General Carpentry is around £20

• Fine Woodworking is about £20

Carpentry is a brilliant method to improve your household and to help maintain its visual pleasantness. Finding a decent carpenter at the correct value is a vital area that needs undivided attention in terms of your project. Whether you're reinforcing your staircase or looking for a total renovation of the house that would change its look, a general carpenter will complete your project to the highest standards.

Where can I buy kitchen cabinets?

When you’re building or redesigning your kitchen, one of the most important decisions you’d have to make is your kitchen cabinets. They are basically where you’ll keep everything you use to cook and as such, take up a lot of space in the kitchen. Therefore, if the aesthetic of your kitchen is a priority, then you’d probably want to get the best quality and good looking cabinet you possibly can. If you’re in the market for new kitchen cabinets, you can put these sources of cabinets into consideration. Let’s take a look!

  • IKEA. One of the best place to buy affordable home goods is also a great place to check if you want to buy your kitchen cabinets. According to a research carried out by J.D Power which surveyed over 1500 customers within the past one year, IKEA’s cabinet system ( Sektion) ranked the highest in terms of the overall satisfaction.
  • KraftMaid. Another winner of the survey conducted by J.D Power as it took the second position when it comes to the overall satisfaction. Therefore, this store happens to be a good option based on the reviews. This store provides you with a wide variety of colour options to select from, so regardless of what your personal preference is, you’re guaranteed to find something worthwhile to install in your kitchen.
  • Stoffer Home. When you buy your kitchen cabinet from an interior designer, there’s a better chance for suitability. Stoffer home offers top quality cabinets which can be manufactured in four various wood finishes and twelve varying paint colours which are all carefully curated.
How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to lay engineered wood flooring?

The cost of just the engineered wood flooringis from £18 to £73 per m2.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Houghton Le Spring.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Houghton Le Spring?

View our open Carpenter jobs near you

Join today
View Shortlist