Find a Carpenter you can trust in Southam.

Choose from 67 Carpenters, all rated by people like you.

Over 69 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
As a friendly team of highly motivated landscapers we strive for customer satisfaction from the very beginning. We specia...
Verified Pro

Wellkeptfacilites

0 review(s)
Offers services in SOUTHAM
WellKept Facilities is a professional facilities maintenance and property services provider delivering reliable, compliant...
Verified Pro

NC CONSTRUCTION

0 review(s)
Offers services in SOUTHAM
With over 20 years of experience, we specialize in bathroom fitting and renovations. Our skilled team delivers exceptional...

Recent Carpenter Enquiries

27 Nov

Garden | Sheds

Southam - CV47

Enquiry from: Sharron W

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Commercial Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

27 Nov

Garden | Decking

Southam - CV47

Enquiry from: Sharron W

Start Date: 1 to 3 months

Are you the property owner: Owner of the property Property Type: Commercial Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

15 Apr

Kitchen | Fitting

Southam - CV47

Enquiry from: Emma S

Start Date: Immediate

Fitting a second hand kitchen, all parts are included cooker, hob, sink and already cut into place Are you the property owner: Owner of the property What level of service do you require: Install Only ...

Post a similar request >

28 Aug

Carpentry

Stratford-upon-Avon - CV37

Enquiry from: Karen H

Start Date: Immediate

Shelving in the air cupboard. Bathroom door adjustment.

Post a similar request >

01 Jul

Interior work | Stud Walls

Rugby - CV23

Enquiry from: Sujung P

Start Date: Immediate

Build a stud wall using 4x2 carcassing timber in existing opening Install 2’ 6” door frame and door between office and kitchen, door and door furniture to match as best as possible Plasterboard ...

Post a similar request >

03 Jun

Garden | Sheds

Banbury - OX15

Enquiry from: Flo J

Start Date: Immediate

customer made an online enquiry for garden shed and confirmed on sms and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the pro...

Post a similar request >

24 May

Garden | Decking

Stratford-upon-Avon - CV37

Enquiry from: Sheila S

Start Date: Immediate

New decking to replace rotten wood

Post a similar request >

16 May

Garden | Sheds

Warwick - CV34

Enquiry from: Hazel C

Start Date: Immediate

looking for a quote to purchase a pent shed 6x10 or 5x6, will go onto existing slabs and will need installing. are you the property owner: tenant (with permission) do you have a: medium size garden wh...

Post a similar request >

10 May

Garden | Decking

Stratford-upon-Avon - CV37

Enquiry from: Sheila S

Start Date: Immediate

Decking to be removed and replaced with new

Post a similar request >

30 Apr

Carpentry

Banbury - OX17

Enquiry from: Phillip D

Start Date: Less than one month

i am looking to buy a house in woodstock oxfordshire. at present the stairs are dangerous and need replacing (slope and tread depth). the work also needs a door filled in and an old door to be reinst...

Post a similar request >

06 Apr

Garden | Decking

Daventry - NN11

Enquiry from: Keith M

Start Date: Immediate

To fit a decked area of roughly 7.2m x 6.5m with 2 steps using composite decking and all fittings supplied by myself, most of ground work will be done in advance. Please contact by email initially a...

Post a similar request >

27 Sep

Carpentry

Daventry - NN11

Enquiry from: Keith M

Start Date: Less than one month

i need two doors hanging plus the door furniture fitting, which i have. are you the property owner: tenant (with permission) property type: terrace what type of job are you looking to have done: wood...

Post a similar request >

24 Aug

Kitchen | Fitting

Leamington Spa - CV31

Enquiry from: Nuri R

Start Date: Immediate

Rip off old kitchen units, flooring , tiling And ceiling jobs, fitting new kitchen units and appliances

Post a similar request >

22 Aug

Kitchen | Fitting

Warwick - CV34

Enquiry from: Jess P

Start Date: Immediate

Install fully assembled DIY kitchen units, and cut laminate worktops down to fit.

Post a similar request >

14 Aug

Carpentry

Leamington Spa - CV32

Enquiry from: Amrit R

Start Date: Immediate

Recently had new carpets fitted. 11 Fire Doors taken down. The fire doors need to be trimmed and rehung.

Post a similar request >

06 Jul

Carpentry

Warwick - CV35

Enquiry from: Katie C

Start Date: Immediate

Old kitchen removed, modifications to plumbing/electrics/gas, fitting of new kitchen, tiling of small area above worktop.

Post a similar request >

17 Jun

Carpentry

Warwick - CV35

Enquiry from: Rob S

Start Date: Immediate

Hi there, I live in Wellesbourne and was wondering if you have availability to quote for a small carpentry job. My house has a number of door frames where previous owners have had new doors fitted, ...

Post a similar request >

21 May

Garden | Sheds

Coventry Southern Satellite Villages & Kenilworth - CV8

Enquiry from: Alan P

Start Date: Immediate

hard landscaping and patio are you the property owner: owner of the property property type: detached roughly the size of your garden: 31+ m2 garden type: back garden do you have a design: no, but i am...

Post a similar request >

23 Apr

Garden | Sheds

Warwick - CV35

Enquiry from: Claire W

Start Date: Immediate

Wooden window repair Lead Wooden window repair Lead Wooden window repair Lead

we need a base for a 6x4 shed on a slight slope in a playground (asphalt). do you do this? thanks

Post a similar request >

23 Apr

Garden | Sheds

Stratford-upon-Avon - CV37

Enquiry from: Emma M

Start Date: Immediate

Area at the bottom of the garden is stoned and covered in weeds, would like area slabbed, and one end made into a raised circular seating area with wooden pergola over it, potentially a small boarder ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Southam is:

£846

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Southam £975-£2,495
Carpenters and joiners in Southam £375-£575
Plasterboard dry lining in Southam £638-£978
Wood flooring in Southam £750-£1,150
Wooden decking in Southam £663-£1,863
Garden shed in Southam £325-£795
Wooden window repair in Southam £320-£480

Related Carpenter searches in Southam

Carpenter FAQs

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to lay wood flooring?

How To Lay Wood Flooring

Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.

Here are some simple steps to follow to properly lay your wood flooring:

• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.

• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.

• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.

• With the help of the click system, the boards will click together.

• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.

• Cut the last board of the row to size if its too long.

• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.

• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.

• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.

Click here to learn more about wood flooring.

How to cut plasterboard?

Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!

• Firstly, you need to put the plasterboard sheet flat on a firm surface.

• Use the tape measurement to measure the cut you wish to make.

• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.

• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.

• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.

• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.

• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.

• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.

• Using a fine sandpaper, remove all forms of paper burrs.

The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Southam.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Southam?

View our open Carpenter jobs near you

Join today
View Shortlist