Find a Carpenter you can trust in Neath.

Choose from 67 Carpenters, all rated by people like you.

Over 56 reviews & an average rating of 4.2/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro
Serving the local area we take pride in our work . And our reputation have been build on loyalty to our customers over ...
Verified Pro

The Grass Master

0 review(s)
Offers services in NEATH
Established in 2006 The Grass Master Ltd has completed hundreds of landscaping projects across Kent. We cover Artificial L...
Verified Pro
Johns gardening landscaping and maintenance services We are company based in Llandeilo with 4 full time staff and three ...
Verified Pro

Owner

0 review(s)
Offers services in NEATH
At R AND S FECING we provide an excellent service and quality of work we are fully insured and all our materials are from...

Recent Carpenter Enquiries

27 Sep

Carpentry

Neath - SA10

Enquiry from: Lee W

Start Date: Immediate

Pictures hanging 7 pictures

Post a similar request >

10 Mar

Carpentry

Neath - SA10

Enquiry from: Amanda C

Start Date: Immediate

Suggestions for new handrails/spindles or glass replacement

Post a similar request >

06 Nov

Carpentry

Neath - SA11

Enquiry from: Carly A

Start Date: Immediate

i am looking to have fitted wardrobes in my daughters bedroom are you the property owner: owner of the property what type of job are you looking to have done: furniture fitting what level of service d...

Post a similar request >

06 Aug

Kitchen | Fitting

Neath - SA11

Enquiry from: Sybil W

Start Date: Immediate

customer is looking for kitchen design & installation quotes. they are unsure of options so would like to discuss. confirmed interest via sms/ customer lives in neath area please call to arrange an a...

Post a similar request >

29 Mar

Garden | Sheds

Neath - SA11

Enquiry from: Scarlett W

Start Date: Immediate

customer made an online enquiry for garden shed and confirmed on sms and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the pro...

Post a similar request >

17 Apr

Garden | Decking

Neath - SA10

Enquiry from: Brian M

Start Date: Immediate

i have a recently moved into a house with a split level pond which is delapited and very tired. it has one pond at ground level linked to a second, raised pond approximately 30-40cms above it. there a...

Post a similar request >

10 Mar

Carpentry

Neath - SA11

Enquiry from: Gregory M

Start Date: Less than one month

i have recently moved into the property and the previous owners said they had changed them not so long ago. but i feel the stairs are too steep. are you the property owner: owner of the property what ...

Post a similar request >

25 Jan

Garden | Sheds

Neath - SA11

Enquiry from: Karen H

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: other, work description: ground prep for shed on slightly sloped site. pier type structure to support shed. ...

Post a similar request >

09 Sep

Carpentry

Neath - SA10

Enquiry from: Pauline R

Start Date: Less than one month

we would like a base for a new summer house we have purchased. the base will need to be 10ft x 10ft on a slightly sloping garden time scale: less than one month please call to appoint

Post a similar request >

30 May

Garden | Decking

Neath - SA10

Enquiry from: Leighton N

Start Date: Immediate

i require 36sq mtrs of sliver hd xs decking, 8 mtrs of bullnose and facias, plus all fixings. please can you send me a quote and delivery time. property type: detached what level of service do you req...

Post a similar request >

24 Jan

Carpentry

Neath - SA10

Enquiry from: Angus D

Start Date: Immediate

require a 13 ft. long crown pattern stair handrail installed?

Post a similar request >

19 Sep

Windows | Wooden | Repair

Neath - SA10

Enquiry from: Alyson W

Start Date: 1 to 3 months

window sill replacement needed for a wood framed double glazed unit installed in 1980. Aluminium framed unit contained in a wooden frame and sill. Wooden sill has rotted extensively as on first floor ...

Post a similar request >

15 May

Carpentry

Neath - SA11

Enquiry from: Caroline C

Start Date: Immediate

Plane and re-hang bedroom door. Sticking following new carpet. Time scale: Immediate Please call to appoint

Post a similar request >

11 Apr

Garden | Decking

Neath - SA11

Enquiry from: Dawn E

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: I have just moved to the area and have a small/medium back garden and woul...

Post a similar request >

26 Jan

Carpentry

Neath - SA10

Enquiry from: Stephen M

Start Date: 1 to 3 months

Looking to convert a conservatory roof, from a polycarbonate roof to a solid but lightweight insulated roof. Time scale: 1-3 months Please call to appoint Please call to appoint

Post a similar request >

26 Jan

Garden | Decking

Neath - SA11

Enquiry from: Tracey M

Start Date: 1 to 3 months

I have an approx 30 sq m lawn which I'd like replace with either paving or composite decking. I would like quotes for both to compare. Thank you Are you the property owner: Owner of the property Pr...

Post a similar request >

18 Oct

Carpentry

Neath - SA11

Enquiry from: Karen S

Start Date: Immediate

I am looking to have a wall partition up in my living room Regards Karen Smith

Post a similar request >

30 Apr

Flooring | Wooden

Neath - SA10

Enquiry from: Robert B

Start Date: Immediate

Property owner: Owner Work description: Wood floor fitting for a downstairs room 14 ft w X 23ft long

Post a similar request >

25 Nov

Flooring | Wooden

Neath - SA11

Enquiry from: Alex R

Start Date: Immediate

Customer visited the myflooringprices.co.uk site and submitted an enquiry. Property owner: Owner, Work description: Hallway in wood

Post a similar request >

03 Aug

Carpentry

Neath - SA11

Enquiry from: Vicky J

Start Date: Immediate

Home Owner counter top for bathroom Please Call to Appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Neath is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Neath £975-£2,495
Carpenters and joiners in Neath £375-£575
Plasterboard dry lining in Neath £638-£978
Wood flooring in Neath £750-£1,150
Wooden decking in Neath £1,125-£1,725
Garden shed in Neath £475-£1,595
Wooden window repair in Neath £320-£480

Related Carpenter searches in Neath

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

What does a carpenter do?

Carpenters are involved with numerous diverse kinds of construction, from home improvement to cabinet making, and framing to large construction projects.

Since the start of time, men have utilised hand tools to make things. You need to understand the correct usage of a hand saw, hammer, plane, screwdriver, and other manual tools. These tools are used to attach ready pieces and produce a complete product, such as nails, screws, and dowels (pre-formed fragments of wood that fit into pre-drilled holes), which are then fastened and amassed.

Carpenters must be adept with the safety and proper usage of numerous power tools, including the ones that do the cutting, shaping, and refining of the wood. This permits constituents to take the arrangement desired for a specific project. Some of these tools include large table saws and drills, band saws and sanders. Apart from power tools, there are also tons of power hand tools including saws and hand drills that can help with the smaller details of any project.

Cabinetry and Furniture Making

Being a cabinet fabricator or furniture maker gives you the chance to build purposeful devices for a home. You need to be able to plan cabinets, chairs, tables, and other products, frequently to fit into a provided space. It is up to you to pick the proper material such as wood, metal, or fabric, and then make the decision about the type of stain or paint, and also the necessary hardware needed to attach the cabinets and complete the furniture.

Residential Carpentry

Looking to become a residential carpenter? Your primary work would be on home improvement and other repair projects; indoors and outdoors. Residential carpenters complete setting up projects on wood flooring, outdoor decks, and patios. This job requires you to design your projects and then work on those designs. You also have to be skilful at work with your client base of proprietors, who you have to satisfy both aesthetically and financially, by keeping costs in check.

Do I need planning permission for a shed?
Generally, you don’t need planning permission for a shed if you live in England or Wales. This applies whether it’s a wooden, metal, plastic or brick shed. However, there are a few conditions your shed will have to meet to not require planning permission:
  • The shed doesn’t cover more than 50% of the garden
  • It’s not in front of your house
  • The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
  • There’s no veranda or balcony
  • The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
  • The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
Exceptions Of course, there are always exceptions:
  • If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
  • If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
  • If you own a piece of woodland, you must seek planning permission for any permanent structure
  • In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
  • In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
So if you live in a straightforward house in England or Wales, you shouldn’t need planning permission for your shed. If you’re in any doubt, make sure you check with your local planning office.
What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Neath.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Neath?

View our open Carpenter jobs near you

Join today
View Shortlist