Find a Carpenter you can trust in Kirkliston.

Choose from 40 Carpenters, all rated by people like you.

Over 162 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
We are a small family run TV Aerial and Satellite company that also specialise in CCTV and TV Wall Mounting too. With o...

Active drives

0 review(s)
Offers services in KIRKLISTON
Hi here at active drives we are a Family run business with over 25 years of experience. no job too big or too small.we h...

Recent Carpenter Enquiries

04 Feb

Carpentry

Craigiehall - EH29

Enquiry from: Mae M

Start Date: Less than one month

I need the two bottom wooden panels of my wooden door replaced with glass, and the top two glass panels removed to match the new ones. Time scale: Less than one month Please call to appoint Please ca...

Post a similar request >

02 Aug

Carpentry

Edinburgh - EH54

Enquiry from: Kevin D

Start Date: Immediate

12 internal doors hung oak doors

Post a similar request >

24 Jul

Garden | Sheds

Oakbank - EH27

Enquiry from: Rajkumar A

Start Date: Immediate

Garden shed installation

Post a similar request >

30 May

Interior work | Stud Walls

Rosewell - EH24

Enquiry from: Ian S

Start Date: Immediate

Stud wall taken down and rebuilt 2 feet further in to the room. New build house. AFAIK not load bearing. 3.4 m wide. 2.4 m high. Concrete floor.

Post a similar request >

07 May

Garden | Sheds

Milton Bridge - EH25

Enquiry from: Andrew H

Start Date: Immediate

Need concrete slabs to be put down for a 12 *** shed.

Post a similar request >

02 May

Garden | Decking

Edinburgh - EH48

Enquiry from: Zen R

Start Date: Immediate

Hey, I'm looking for help with a timber base installation in Armadale (5m x 3m area). The structure is intended to support a log cabin gym setup, similar in build to a raised decking frame — with ti...

Post a similar request >

19 Dec

Carpentry

Edinburgh - EH54

Enquiry from: David C

Start Date: Immediate

I have an internal door that needs to be moved about three feet from where it currently is. The whole timber door frame would need to be moved or a new frame built for it.

Post a similar request >

16 Apr

Carpentry

Edinburgh - EH48

Enquiry from: Robert H

Start Date: Less than one month

alter three pine doors so they close properly. adjustment needed to take account of new carpet. are you the property owner: owner of the property property type: detached what type of job are you loo...

Post a similar request >

08 Apr

Carpentry

Salvesen Crescent - EH47

Enquiry from: Ajay K

Start Date: Immediate

i would like to get a conservatory and kitchen work done along with shower room please let me know best time to talk how soon we can get this done and a tentative quote thanks are you the property ow...

Post a similar request >

16 Dec

Carpentry

West Calder - EH55

Enquiry from: Tim J

Start Date: 1 to 3 months

doot installation in a 1700x1900 space are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/doors how many windows do...

Post a similar request >

08 Nov

Carpentry

Edinburgh - EH48

Enquiry from: Robert H

Start Date: Less than one month

apply white bathroom silicone around shower cubicle to prevent leaks fix 8 m skirting to en suite rehang door and cut and fit facings, rehang door, adjust 2 other doors. are you the property owner: o...

Post a similar request >

29 Oct

Garden | Sheds

Salvesen Crescent - EH47

Enquiry from: Tony B

Start Date: Immediate

need a bespoke large robust garden shed. approx 10m x 4m pent roof, double patio doors. internal separation wall as double purpose are you the property owner: owner of the property what level of servi...

Post a similar request >

05 Oct

Garden | Decking

Loanhead - EH20

Enquiry from: Manik K

Start Date: Immediate

customer in loanhead area has requested that we arrange quotes for their wooden decking project.they are considering various options and would like to discuss with a carpenter directly.please call to ...

Post a similar request >

27 Sep

Carpentry

Edinburgh - EH54

Enquiry from: Amer M

Start Date: Immediate

bath door cutting and fixing only are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors do you require a door(s): none time scale: immedi...

Post a similar request >

23 Aug

Carpentry

Edinburgh - EH54

Enquiry from: Jim B

Start Date: Immediate

cut doors to size and ha***ors. are you the property owner: relative of owner property type: semi detached what type of job are you looking to have done: wooden window/doors how many windows do you ne...

Post a similar request >

04 Jul

Flooring | Wooden

Edinburgh - EH48

Enquiry from: John O

Start Date: Immediate

skimming two doors replacing a piece of spitting.

Post a similar request >

30 Jun

Garden | Sheds

Salvesen Crescent - EH47

Enquiry from: Lynn A

Start Date: Immediate

garden shed 7x5 approx. single door. no window . needs to be delivered and to be built. thanks are you the property owner: owner of the property do you have a: large garden what level of service are y...

Post a similar request >

20 May

Garden | Decking

Edinburgh - EH54

Enquiry from: Susan M

Start Date: Immediate

deck to be cleaned, sanded & restained are you the property owner: owner of the property property type: terrace what level of service do you require: deck only please call to appoint

Post a similar request >

30 Apr

Garden | Decking

Edinburgh - EH17

Enquiry from: Joan C

Start Date: Immediate

we have a new miller homes property in edgelaw, edinburgh. the grassed rear garden is approx 30 x 35ft in size. we would like an original paved area extended and the grass removed. remaining gard...

Post a similar request >

16 Apr

Garden | Decking

Edinburgh - EH54

Enquiry from: Niku S

Start Date: Immediate

full back garden decking work are you the property owner: owner of the property property type: detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Kirkliston is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Kirkliston £975-£2,495
Carpenters and joiners in Kirkliston £375-£575
Plasterboard dry lining in Kirkliston £638-£978
Wood flooring in Kirkliston £750-£1,150
Wooden decking in Kirkliston £1,125-£1,725
Garden shed in Kirkliston £450-£690
Wooden window repair in Kirkliston £320-£480

Related Carpenter searches in Kirkliston

Carpenter FAQs

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

How much is wood flooring?

The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

What is engineered wood flooring?

What Is Engineered Wood Flooring?

Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.

Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.

The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:

• Its very easy and simple to install

• When compared to solid wood flooring, it’s more cost effective.

• It can be utilized alongside an under floor heating

• It can be loose laid, meaning it does not need to be fixed in position

• It is available in multiple varieties of wood and finishes

• It can be incorporated alongside an underlay including thermal barriers

• It can be utilized in areas with a fluctuating humidity and temperature.

• It is available in different kinds of thickness.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Kirkliston.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Kirkliston?

View our open Carpenter jobs near you

Join today
View Shortlist