Find a Carpenter you can trust in Brierley Hill.

Choose from 154 Carpenters, all rated by people like you.

Over 50 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Jukoro

0 review(s)
Offers services in BRIERLEY HILL
Started in 2007 and incorporated in 2019, Jukoro Ltd is Worcester based building and construction business dedicated to se...
Verified Pro

Jds kitchens & berooms

0 review(s)
Offers services in BRIERLEY HILL
Supplier and installer of kitchens & bedrooms.
Verified Pro

Beautiful Gardens

0 review(s)
Offers services in BRIERLEY HILL
We are a professional landscape gardening business serving Lichfield, Sutton Coldfield, Rugeley and surrounding villages. ...
Verified Pro

Value Floors Hall Green

0 review(s)
Offers services in BRIERLEY HILL
Here at Value Floors, we offer flooring products such as laminate flooring, engineered flooring, wood flooring, flooring i...
Verified Pro
At ColourFence we manufacture & fit beautiful metal garden fences. Able to withstand winds of up to 130mph, our steel-made...
Verified Pro

Drg landscaping

0 review(s)
Offers services in BRIERLEY HILL
We’re based in the West Midlands and have a passion for the job that we do. Seeing a happy customer with their dream garde...

Recent Carpenter Enquiries

09 Nov

Carpentry

Brierley Hill - DY5

Enquiry from: Terry J

Start Date: Less than one month

fitting 6 white grained moulded doors are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: wooden window/doors what level of se...

Post a similar request >

27 Aug

Kitchen | Fitting

Brierley Hill - DY5

Enquiry from: Jacqueline P

Start Date: Immediate

worktops already purchased to be fitted with cut out for hob and sink, also a mitre to be done are you the property owner: owner of the property what level of service do you require: install only do...

Post a similar request >

03 Feb

Carpentry

Brierley Hill - DY5

Enquiry from: Imran H

Start Date: Immediate

6 Fire doors 7 normal doors 8 square laminate flooring Time scale: Immediate Please call to appoint

Post a similar request >

01 Feb

Garden | Decking

Brierley Hill - DY5

Enquiry from: Katherine S

Start Date: 1 to 3 months

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: We are hoping to have our garden overhauled later this year. We are lookin...

Post a similar request >

13 Jul

Garden | Decking

Brierley Hill - DY5

Enquiry from: David W

Start Date: Less than one month

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: I am looking for someone to quote to do some decking in our back garden. O...

Post a similar request >

22 Sep

Carpentry

Brierley Hill - DY5

Enquiry from: Hollie B

Start Date: Immediate

Carpet fitted in a rectangle room (approx 24 square meters) with a fire place on one wall No removal of old carpet or cut offs of new carpet necessary

Post a similar request >

10 Jun

Garden | Decking

Brierley Hill - DY5

Enquiry from: C S

Start Date: Immediate

Raised decking approx 7 x 4 metres and 1 metre above existing patio

Post a similar request >

08 Jun

Garden | Decking

Brierley Hill - DY5

Enquiry from: C

Start Date: Immediate

decking quote 18 square metres

Post a similar request >

31 May

Garden | Decking

Brierley Hill - DY5

Enquiry from: Lee E

Start Date: Immediate

Composite decking to fit 8 metre by 2.4 metre Charcoal

Post a similar request >

12 Mar

Garden | Decking

Brierley Hill - DY5

Enquiry from: Hannah N

Start Date: Immediate

raised decking- around 8ft by 12ft

Post a similar request >

26 Jun

Garden | Decking

Brierley Hill - DY5

Enquiry from: Kelli U

Start Date: Immediate

Customers own description of work to be carried out: Decking patio area no steps just a platform For table an chairs - Estimated Service Date: 23/08/2015 - Estimated Decking Area (sq ft): 15 by 15 -...

Post a similar request >

17 May

Garden | Decking

Brierley Hill - DY5

Enquiry from: Kevin T

Start Date: Immediate

Property type: Detached, Work description: decking at top of garden or seating area Supplied and Fitted Please Contact to Appoint

Post a similar request >

08 Apr

Garden | Decking

Brierley Hill - DY5

Enquiry from: Terri V

Start Date: Immediate

Work description: Approx.20ft by 20ft decking to back garden,decking to be put on top of existing slabs Are you the property owner: Tenant (with permission) Property Type: Semi detached What level ...

Post a similar request >

04 Apr

Garden | Decking

Brierley Hill - DY5

Enquiry from: Janice P

Start Date: Immediate

Home owner Property type: Terrace Work description: To do decking from a lawn Please contact to appoint

Post a similar request >

18 Mar

Kitchen | Fitting

Brierley Hill - DY5

Enquiry from: Jean T

Start Date: Immediate

Kitchen Area: 90, Property type: House, Work description: 4 wall units 5 floor units work surface Homeowner Please contact to appoint

Post a similar request >

03 Mar

Kitchen | Fitting

Brierley Hill - DY5

Enquiry from: B P

Start Date: Immediate

Home Owner Fit kitchen Please call to appoint

Post a similar request >

03 Mar

Kitchen | Fitting

Brierley Hill - DY5

Enquiry from: B P

Start Date: Immediate

Home Owner Full kitchen installation Please call to appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Brierley Hill is:

£846

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Brierley Hill £975-£2,495
Carpenters and joiners in Brierley Hill £375-£575
Plasterboard dry lining in Brierley Hill £638-£978
Wood flooring in Brierley Hill £750-£1,150
Wooden decking in Brierley Hill £663-£1,863
Garden shed in Brierley Hill £325-£795
Wooden window repair in Brierley Hill £320-£480

Related Carpenter searches in Brierley Hill

Carpenter FAQs

How to plasterboard a brick wall?

How To Plasterboard A Brick Wall

Do you want to cover your brick wall with plasterboard? The key to success here is the preparation. You must ensure that brick wall is prepared well enough to receive the plasterboard. To get started, there’s the need to attach wood furring strips to the wall which serves as studs in a wood frame structure. This way, the plasterboard will be prevented from getting in touch with the brick. You can always hang pictures or any other forms of decoration in between the gap between the walls. Let’s have a look!

lAttach Furring Strips

• Get a 2 inch by 4 inch wood stud and apply a bead of construction adhesive.

• Using a masonry bit, drill a pilot hole through the wood stud’s base as well as the brick wall.

• Hit a 3 inch fluted nail through the hole using a sledgehammer

• Using a construction adhesive, bind a horizontal 2 inch by 3 inch stud to the upper edge of the wall.

• Using an adhesive, bind the length of a 2 inch by 3 inch stud on its wide side.

• Use a masonry drill to drill a hole on the wood stud and 1 1/2 inches into the brick wall.

• Hit a 3 inch fluted nail through the pilot hole.

lApply Plasterboard

• Hold a plasterboard sheet against the furring strips.

• Use plasterboard screw to hold the drywall sheets in place.

• Use fibreglass to cover the joints where the two plasterboard sheets meet.

• Use a thin layer of the joint compound on the tape. Once done, screw it using a 6 inch taping knife, then allow to dry overnight.

• Use a sandpaper to smooth the joint compound.

• Use a fresh coat of the joint compound to block the holes and joints. Once done, allow the compound to dry.

• Use a light sandpaper to smooth the final coat.

Plasterboarding a brick wall is a simple task but the preparation part must be done right to protect your investment. Therefore, we’d recommend you hire the services of a skilful professional, who can guarantee the best results especially if you lack enough training and experience to carry out a DIY project.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Brierley Hill.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Brierley Hill?

View our open Carpenter jobs near you

Join today
View Shortlist