Find a Carpenter you can trust in Dudley.

Choose from 156 Carpenters, all rated by people like you.

Over 50 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Jukoro

0 review(s)
Offers services in DUDLEY
Started in 2007 and incorporated in 2019, Jukoro Ltd is Worcester based building and construction business dedicated to se...
Verified Pro

Jds kitchens & berooms

0 review(s)
Offers services in DUDLEY
Supplier and installer of kitchens & bedrooms.
Verified Pro

Beautiful Gardens

0 review(s)
Offers services in DUDLEY
We are a professional landscape gardening business serving Lichfield, Sutton Coldfield, Rugeley and surrounding villages. ...
Verified Pro
Here at Value Floors, we offer flooring products such as laminate flooring, engineered flooring, wood flooring, flooring i...
Verified Pro
At ColourFence we manufacture & fit beautiful metal garden fences. Able to withstand winds of up to 130mph, our steel-made...
Verified Pro

Drg landscaping

0 review(s)
Offers services in DUDLEY
We’re based in the West Midlands and have a passion for the job that we do. Seeing a happy customer with their dream garde...

Recent Carpenter Enquiries

13 Aug

Interior work | Stud Walls

Dudley - DY3

Enquiry from: Ellen L

Start Date: Immediate

I was looking to get a quote for fitting soundproofing panels in 7 alcoves (lounge, dining room, and two bedrooms). Coving and skirting would need cutting and moving, and replastering after. The sound...

Post a similar request >

03 May

Garden | Sheds

Dudley - DY2

Enquiry from: Paula W

Start Date: Immediate

customer made an enquiry for garden shed and confirmed on the quotatis site they would like quotes from a carpenter.miss lives in the dudley area and would like a call to discuss options.see below det...

Post a similar request >

07 Feb

Flooring | Wooden

Dudley - DY1

Enquiry from: Haywood G

Start Date: Immediate

Need to recommend good products.

Post a similar request >

24 Mar

Garden | Decking

Dudley - DY1

Enquiry from: Dave T

Start Date: Immediate

decking replaced with slabs are you the property owner: owner of the property property type: semi detached garden type: back garden work required: paving, decking current state of garden: the garden i...

Post a similar request >

20 Mar

Kitchen | Fitting

Dudley - DY3

Enquiry from: Maggi B

Start Date: Immediate

i have between 9 and 11 kitchen units to be fitted including a small ireland as it's a small kitchen area looking for the job to start 4.4.2022 . are you the property owner: owner of the property what...

Post a similar request >

20 Dec

Garden | Decking

Dudley - DY2

Enquiry from: Jason C

Start Date: Immediate

Decking supply and install

Post a similar request >

16 Mar

Garden | Decking

Dudley - DY1

Enquiry from: Beverley S

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: maintenance free decking on patio back of house.

Post a similar request >

11 Jan

Garden | Decking

Dudley - DY1

Enquiry from: Hannah R

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: A rectangle grassed area decked over no sides or railings

Post a similar request >

27 Oct

Carpentry

Dudley - DY1

Enquiry from: Julie S

Start Date: Immediate

to supply and fit small interior barn door style door to cover arch way between hall and bedroom (was a garage). would need to be installed on the bedroom side of archway time scale: immediate pleas...

Post a similar request >

17 Oct

Carpentry

Dudley - DY2

Enquiry from: Inge B

Start Date: Immediate

hi guys!we are looking for somebody to replace  4 wooden door frames in our house, it is all stripped back to the brick, old frames removed.we just need new frames and a workman. would you be interes...

Post a similar request >

13 Aug

Carpentry

Dudley - DY2

Enquiry from: Chantelle A

Start Date: Less than one month

how much would it be to hang 5 new doors with handles? please time scale: less than one month please call to appoint

Post a similar request >

22 May

Garden | Decking

Dudley - DY1

Enquiry from: ASH N

Start Date: Immediate

are you the property owner: owner of the property property type: detached other forms: garden maintenance, wooden decking agreed to receive quotes for selected products: yes please call to appoint

Post a similar request >

22 Mar

Garden | Sheds

Dudley - DY1

Enquiry from: Danny L

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Want area approx 25feet x 8feet digging/levelling and base prep for garden...

Post a similar request >

06 Jun

Garden | Decking

Dudley - DY3

Enquiry from: Amanda A

Start Date: Immediate

Are you the property owner: Owner of the property Property Type: Detached Other Forms: None Please call to appoint

Post a similar request >

21 Apr

Kitchen | Fitting

Dudley - DY3

Enquiry from: David B

Start Date: Immediate

Thanks for that. How many units do you need fitted? 5+ Ok, so what product are we talking about? Fitting of Units x

Post a similar request >

04 Mar

Carpentry

Dudley - DY2

Enquiry from: Jamie T

Start Date: Immediate

Great, what do you need done? Supply and Installation 8 internal doors. Cheap as possible to supply and hang.

Post a similar request >

01 Oct

Carpentry

Dudley - DY3

Enquiry from: Rachel M

Start Date: Immediate

door frame and two doors to be hung, some carpentry work required outside to be discussed when quoting.

Post a similar request >

10 Aug

Garden | Decking

Dudley - DY3

Enquiry from: Helen B

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Complete garden makeover

Post a similar request >

05 Jun

Garden | Decking

Dudley - DY2

Enquiry from: JOEL C

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: I need part of my garden turning over and then turf laying .. its roughly ...

Post a similar request >

14 Oct

Kitchen | Fitting

Dudley - DY2

Enquiry from: Shannon N

Start Date: Immediate

Home Owner Call to Appoint

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Dudley is:

£846

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Dudley £975-£2,495
Carpenters and joiners in Dudley £375-£575
Plasterboard dry lining in Dudley £638-£978
Wood flooring in Dudley £750-£1,150
Wooden decking in Dudley £663-£1,863
Garden shed in Dudley £325-£795
Wooden window repair in Dudley £320-£480

Related Carpenter searches in Dudley

Carpenter FAQs

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How much does a stair banister cost?

The flight of steps in your multi-storey household doesn’t have to be purely efficient. With just a little thought given to banister design, the boring flight of stairs can turn into something you would like to show to people and be proud of. Replacement of your banister can even enhance the worth of your property, giving the entry an outstanding presence. But how much will new banisters and spindles cost you?

If you are considering starting with this project, having a help from a professional is always advised.

New banister cost

Banisters are also known as handrails. They are reinforced by balustrades or spindles – a row of pillars that improve the security of the stairway and donate in the direction of the overall look and feel. Banisters and spindles may appear dull due to use over time. A fresh coat of polish might help your staircase get a new facelift.

The cost of new banisters and spindles will fluctuate solely reliant on the material. The price for a new banister starts around £40 for softwood and can reach £120 for a metal one.

Spindle prices are also a contributing factor in determining the cost with prices in the range of £30 to £150 per meter based on the materials used.

How much does a new staircase banister cost?

Hiring a professional is very important when trying to properly install a new banister since they are familiar with the process and work as per safety compliance. Fitting your new banister can be easily taken care by a general builder as well as a carpenter.

Below is a table depicting the average costs of different types of bannisters and spindles:

White oak bannister is around £105 and spindles are around £13.50.

Pine bannister is around £35 and spindles are around £7.

Primed wood bannister costs around £31 and spindles costing around £18.

Metal bannister is around £110 with the spindles being around £6.

What does a carpenter do?

Carpenters are involved with numerous diverse kinds of construction, from home improvement to cabinet making, and framing to large construction projects.

Since the start of time, men have utilised hand tools to make things. You need to understand the correct usage of a hand saw, hammer, plane, screwdriver, and other manual tools. These tools are used to attach ready pieces and produce a complete product, such as nails, screws, and dowels (pre-formed fragments of wood that fit into pre-drilled holes), which are then fastened and amassed.

Carpenters must be adept with the safety and proper usage of numerous power tools, including the ones that do the cutting, shaping, and refining of the wood. This permits constituents to take the arrangement desired for a specific project. Some of these tools include large table saws and drills, band saws and sanders. Apart from power tools, there are also tons of power hand tools including saws and hand drills that can help with the smaller details of any project.

Cabinetry and Furniture Making

Being a cabinet fabricator or furniture maker gives you the chance to build purposeful devices for a home. You need to be able to plan cabinets, chairs, tables, and other products, frequently to fit into a provided space. It is up to you to pick the proper material such as wood, metal, or fabric, and then make the decision about the type of stain or paint, and also the necessary hardware needed to attach the cabinets and complete the furniture.

Residential Carpentry

Looking to become a residential carpenter? Your primary work would be on home improvement and other repair projects; indoors and outdoors. Residential carpenters complete setting up projects on wood flooring, outdoor decks, and patios. This job requires you to design your projects and then work on those designs. You also have to be skilful at work with your client base of proprietors, who you have to satisfy both aesthetically and financially, by keeping costs in check.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

How is wooden flooring installed

Wooden flooring is very popular flooring option amongst home and property owners in the UK and understandably so. It adds to your space’s curb appeal, it’s quite easy to maintain, it adds to the value resale value of your property if you later wish to sell and lots more. If you’re looking to have wooden flooring installed in your home, you have two options which includes doing it yourself or calling in a professional – the latter being more advisable. However, by following some simple but essential steps, you can also install your wooden flooring successfully by yourself. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

 

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

  • Incorporate flexible wood on concrete adhesives.
  • With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.
  • Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.
  • Put 10mm spacers against the wall to see to the consistency in expansion gaps.
  • Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

  • Make use of a porta-nailer.
  • Position 10mm spacers against the wall - parallel with the installation direction.
  • Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.
  • Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.
  • Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.
  • Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Dudley.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Dudley?

View our open Carpenter jobs near you

Join today
View Shortlist