Find a Carpenter you can trust in West Bromwich.

Choose from 75 Carpenters, all rated by people like you.

Over 91 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Damp Defender UK

0 review(s)
Offers services in WEST BROMWICH
With over 30 years of experience, we're your trusted specialists in treating rising damp, penetrating damp, condensation a...
Verified Pro

Trent Doors

0 review(s)
Offers services in WEST BROMWICH
Trent Doors is a dedicated provider of affordable garage door services, proudly catering to residential properties. Founde...
Verified Pro

Armison

0 review(s)
Offers services in WEST BROMWICH
About Armison Ltd Armison Ltd is a professional building and renovation company based in Leicester, providing high-qual...
Verified Pro

Jhdm services

0 review(s)
Offers services in WEST BROMWICH
JHDM Services has over 7 years of experience providing reliable, high-quality property maintenance and handyman services. ...

Recent Carpenter Enquiries

30 Jun

Garden | Decking

West Bromwich - B71

Enquiry from: Bob D

Start Date: Immediate

I have an existing timber deck that needs to be replaced, The timber ahs dried up and is unsafe to walk on. The timber supports under the deck may need replacing as well. the garden is approx. 57m2 wi...

Post a similar request >

27 Jan

Flooring | Wooden

West Bromwich - B71

Enquiry from: Mr S

Start Date: Immediate

Need a new floor boards and joist too

Post a similar request >

30 Jun

Kitchen | Fitting

West Bromwich - B70

Enquiry from: Adetoun O

Start Date: Immediate

i just need to fix where i put my spoons d screw loosen i need to tighten it back are you the property owner: tenant (with permission) what level of service do you require: install only do you have al...

Post a similar request >

28 Jun

Interior work | Stud Walls

West Bromwich - B70

Enquiry from: Jag S

Start Date: Immediate

Partition in the garage, stud wall put up, reinforce the joists, insulate and put up plasterboard & board up the ceiling.

Post a similar request >

28 Jan

Interior work | Stud Walls

West Bromwich - B70

Enquiry from: Nicky S

Start Date: Immediate

we need a stud wall and plastered and 4 doors put in. are you the property owner: owner of the property

Post a similar request >

05 Dec

Carpentry

West Bromwich - B70

Enquiry from: Alan M

Start Date: Immediate

need a garage back door replacing at present it’s a wooden would like it replaced with a upvc door which i have could you please give me a quote are you the property owner: owner of the property pro...

Post a similar request >

10 Mar

Garden | Decking

West Bromwich - B71

Enquiry from: Kruti M

Start Date: Immediate

customer in west bromwich areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via email at 10/03/2022 09:30.please call to arrange ap...

Post a similar request >

09 Aug

Garden | Sheds

West Bromwich - B71

Enquiry from: Philip H

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: back garden is currently split over three levels and my requirement is to level ...

Post a similar request >

12 Jul

Interior work | Stud Walls

West Bromwich - B71

Enquiry from: Paul W

Start Date: Immediate

Stud frame/ plaster for a false chimney breast

Post a similar request >

14 May

Garden | Decking

West Bromwich - B70

Enquiry from: Agron L

Start Date: Immediate

customer in west bromwich areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via telephone, sms and email at 14/05/2021 11:24.please...

Post a similar request >

22 Aug

Carpentry

West Bromwich - B71

Enquiry from: Stephen R

Start Date: Immediate

fitting of a 10 feet by 10 feet gazebo to slabs. the gazeebo is an open type, no solid walls. the slabs are already in place. time scale: immediate please call to appoint

Post a similar request >

16 Sep

Garden | Decking

West Bromwich - B70

Enquiry from: Sharon C

Start Date: Immediate

Are you the property owner: Owner Property Type: Terrace Other Forms: None Please call to appoint

Post a similar request >

27 Jul

Garden | Sheds

West Bromwich - B71

Enquiry from: Virendra S

Start Date: Immediate

Need to remove all thing make new garage build everything new we will mange to give u minimum £4000 just come see look by yourself Are you the property owner: Owner of the property Property Type: Sem...

Post a similar request >

28 Jun

Garden | Decking

West Bromwich - B70

Enquiry from: Sukhi J

Start Date: Immediate

Are you the property owner: Tenant (with permission) Property Type: Semi detached Time scale: Immediate Other Forms: None Please call to appoint

Post a similar request >

18 Jun

Garden | Decking

West Bromwich - B70

Enquiry from: Sukhi J

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Semi detached, Work description: Landscape back and front garden

Post a similar request >

23 Jun

Carpentry

West Bromwich - B71

Enquiry from: Mr R

Start Date: Immediate

Hi, Just had a wall knocked out between 2 rooms 2 make one big lounge. Looking to get a wooden, french or bi folding door to divide the two rooms. Also require other jobs like door frames and...

Post a similar request >

31 Oct

Garden | Decking

West Bromwich - B70

Enquiry from: Frederick C

Start Date: Less than one month

Are you the property owner: Owner of the property Property Type: Detached Time scale: Less than one month Other Forms: None Please call to appoint

Post a similar request >

12 Sep

Flooring | Wooden

West Bromwich - B71

Enquiry from: Colin O

Start Date: Immediate

Customer visited the myflooringprices.co.uk site and submitted an enquiry. Property owner: Owner, Work description: To do my living room

Post a similar request >

09 Jul

Carpentry

West Bromwich - B70

Enquiry from: Marie J

Start Date: Immediate

Customers own description of work to be carried out: We are a Conference Centre and have a large meeting room which has a partition to make into two rooms. There is a gap on the top and bottom of thi...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in West Bromwich is:

£846

Carpenter job Carpenter cost in 2026
Kitchen Fitting in West Bromwich £975-£2,495
Carpenters and joiners in West Bromwich £375-£575
Plasterboard dry lining in West Bromwich £638-£978
Wood flooring in West Bromwich £750-£1,150
Wooden decking in West Bromwich £663-£1,863
Garden shed in West Bromwich £325-£795
Wooden window repair in West Bromwich £320-£480

Related Carpenter searches in West Bromwich

Carpenter FAQs

What does a carpenter do?

Carpenters are involved with numerous diverse kinds of construction, from home improvement to cabinet making, and framing to large construction projects.

Since the start of time, men have utilised hand tools to make things. You need to understand the correct usage of a hand saw, hammer, plane, screwdriver, and other manual tools. These tools are used to attach ready pieces and produce a complete product, such as nails, screws, and dowels (pre-formed fragments of wood that fit into pre-drilled holes), which are then fastened and amassed.

Carpenters must be adept with the safety and proper usage of numerous power tools, including the ones that do the cutting, shaping, and refining of the wood. This permits constituents to take the arrangement desired for a specific project. Some of these tools include large table saws and drills, band saws and sanders. Apart from power tools, there are also tons of power hand tools including saws and hand drills that can help with the smaller details of any project.

Cabinetry and Furniture Making

Being a cabinet fabricator or furniture maker gives you the chance to build purposeful devices for a home. You need to be able to plan cabinets, chairs, tables, and other products, frequently to fit into a provided space. It is up to you to pick the proper material such as wood, metal, or fabric, and then make the decision about the type of stain or paint, and also the necessary hardware needed to attach the cabinets and complete the furniture.

Residential Carpentry

Looking to become a residential carpenter? Your primary work would be on home improvement and other repair projects; indoors and outdoors. Residential carpenters complete setting up projects on wood flooring, outdoor decks, and patios. This job requires you to design your projects and then work on those designs. You also have to be skilful at work with your client base of proprietors, who you have to satisfy both aesthetically and financially, by keeping costs in check.

How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

What is second fix carpentry?

Two of the commonly used terms in the UK and Irish construction industry is “First Fix and “Second Fix First fix encompasses all the work required to take a building from foundation to stroking plaster on the interior walls. This comprises of building walls, floors and ceilings, and implanting cables for electrical supply and pipes for water supply.

Some claim that First Fix starts after the shell of the building is complete, and ends when the walls are plastered. Some of the elements in the first fix are as follows.

• Drain runs: must be downhill and straight

• Spare conduits: drawstrings

• Soil pipes

• Copper pipes

• Normal pipes

• Doorbell

• Door frames

• Pocket doorframes

• Stairwell

• MVHR (mechanical heat recovery ventilation runs)

• Push-fit or other plastic piping

• Electrical back boxes

• Electricity cable runs

• Telephone, data and audio-visual cables

• Socket location

• Security

• Fire alarm

• Sound insulation

• Plasterboarding

It is to be kept in mind that the list goes on as there are several things that you can do when you are building a house from scratch and it is impossible to cover each and every aspect in detail.

The second fix includes all the work after the plastering of a complete house. These include linking cables to the electrical fittings, coupling pipes to the baths and sinks and fitting doors into doorframes. Second fix work requires a tidier finish than the first fix.

Carpenters, electricians and plumbers get a proper idea on the division of work. They will also be able to visit the construction site at different times.

Project managers can simply report it as the "first fix complete" or "the second fix 50% done" and others would very easily understand.

Regardless of the fact that a construction company might specialise in a certain form of fix, be it the first or the second, they are obligated to have a rudimentary understanding of both and are required to perform them from time to time.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

Will I need safety barriers or balustrades for my decking?

If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.

How to lay solid wood flooring on floorboards?

Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.

If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.

The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in West Bromwich.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in West Bromwich?

View our open Carpenter jobs near you

Join today
View Shortlist