- A sturdy ladder
- Gloves and safety goggles
- A hammer and nails to secure your fascia so it doesn’t fall down mid-replacement
- A hacksaw – this will cut through uPVC guttering – just make sure you leave a margin of error with every cut you make
- Cable ties or rope to secure the existing gutters while you dismantle them, so they don’t fall off
- All the right fixings and brackets to secure the guttering
- An electric drill and/or screwdrivers
- Add a gutter bracket to the top of the fascia board at the opposite end to the stop-end outlet, if you have one. Then tie a piece of string around the base of the bracket.
- You’ll need to place the gutter outlet accurately over the drain. Hold a plumb line against the fascia directly over the drain, and mark that position with a pencil. Following the manufacturer’s advice on the number of screws to use, fit the gutter outlet no more than 50mm below the level of the roof tiles.
- Stretch the piece of string you tied on the bracket along the fascia board, and tie it to the outlet. Make sure you check with a spirit level that the string slopes towards the outlet.
- Mark the positions of the other brackets. They should be no more than 800mm apart, or 600mm if your roof is very steep. They also shouldn’t be any more than 150mm from a joint or fitting. Then fit the rest of the brackets.
- Fit a stop-end to the first length of gutter and clip it into position on the brackets. At the other end, fit a union piece and screw it into the fascia.
- Then fit the next length of gutter into it, and the next until you’re finished. Cut the last one to fit using your hacksaw before attaching a stop-end. Then make sure all the joints line up with the insertion depth marks on the fittings. Then you’re done!