Find a Landscaper you can trust in Maghera.

Choose from 7 Landscapers, all rated by people like you.

Over 1 reviews & an average rating of 5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

View Shortlist
Verified Pro

Oaklands paving

0 review(s)
Offers services in MAGHERA
We are a brickpaving and groundwork company. In business from 2005 with over 250 happy customers.

Frontline drives

0 review(s)
Offers services in MAGHERA
From a Simple Slate To a full New drives and patos Replacement We Got You Covered. Free Quotes And Advice. If We Can’t Fix...

Recent Landscaper Enquiries

28 Apr

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Treenie B

Start Date: Immediate

Kill weeds, remove moss, re-sow the lawn

Post a similar request >

01 Feb

Fencing | Wooden

Maghera - BT46

Enquiry from: Paul C

Start Date: Immediate

I have a D rail fence and a lot of the posts have rotted at the concrete and the fence s starting tilt over, i need the post replaced

Post a similar request >

06 Feb

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Elizabeth G

Start Date: Immediate

quote for garden treatment , garden is full of moss are you the property owner: owner property type: detached do you have a: large garden garden type: front garden, side garden work required: lawn/tu...

Post a similar request >

03 Sep

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Attracta M

Start Date: Immediate

grass needs cut front & back of house are you the property owner: owner property type: semi detached do you have a: small garden garden type: back garden garden type: back garden, front garden work re...

Post a similar request >

20 Sep

Fencing | Wooden

Maghera - BT46

Enquiry from: Margaret B

Start Date: Immediate

Removal of hedges replace with wooden fencing

Post a similar request >

19 Apr

Fencing | Wooden

Maghera - BT46

Enquiry from: Peggy D

Start Date: Immediate

I’m looking to obtain a cost for a 1.8m high wooden fence to go round my property.

Post a similar request >

10 Mar

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Bronagh M

Start Date: Immediate

Lawn very damp and moss a problem

Post a similar request >

05 Sep

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Laura C

Start Date: Immediate

Cut grass Are you the property owner: Tenant (with permission) Property Type: Detached Do you have a: Small garden Garden Type: Back garden, Front garden Work Required: Lawn/Turfing Current State of g...

Post a similar request >

21 Apr

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Jennifer S

Start Date: Immediate

Need small area at the front either paved or put to grass and back garden a corner is very wet would like something done to that.

Post a similar request >

08 Feb

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Stephanie G

Start Date: Less than one month

We had our garden seeded last spring, the grass was coming up well. Unfortunately a delivery driver has drove through a section of the garden. The company has agreed to pay damages but requires 2 qu...

Post a similar request >

24 Jun

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Gareth H

Start Date: Immediate

Moving out and need overgrown garden strimmed down and cleared. Garden is 35ft squared. Looking it done as soon as possible.

Post a similar request >

20 Jun

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Gareth H

Start Date: Immediate

We are moving out of the property soon and want to get our garden tidied up. It is a smallish garden but is quite overgrown, no trees just grass and weeds. Will need strimmed down and cleared. Can ema...

Post a similar request >

22 Mar

Garden | Maintenance & Upkeep

Maghera - BT46

Enquiry from: Donna M

Start Date: Immediate

regular lawn mowing Are you the property owner: Tenant (with permission) Property Type: Detached Roughly the size of your garden: 31+ m2 Garden Type: Back garden, Front garden Do you have a desig...

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2026 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Maghera is:

£1,478

Landscaper job Landscaper cost in 2026
Wooden fencing in Maghera £1,125-£1,725
Landscaping in Maghera £2,250-£3,450
Garden maintenance and upkeep in Maghera £188-£288
Wooden decking in Maghera £1,125-£1,725
Artificial Grass in Maghera £3,000-£4,600
Garden shed in Maghera £450-£690
Garden lighting in Maghera £320-£480
Driveway repair in Maghera £1,520-£2,280
Lawn Care in Maghera £130-£200

Related Landscaper searches in Maghera

Landscaper FAQs

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
how to repair a paved driveway?

Generally, a paved driveway is always subjected to regular usage and yours isn’t likely to be an exception, otherwise you won’t be here. Regular usage automatically necessitates regular maintenance of the driveway in order to extend its lifespan, make your property safer and add more value to it. This maintenance will involve a frequent inspection of the paved driveway so as to identify and repair divots, cracks as well as rutting. Paved driveways usually have a lifespan ranging between 15 to 20 years, but this can only be guaranteed when backed by regular maintenance activities. Failure to provide your paved driveway with a regular maintenance will lead to a rapid deterioration within just a couple of years after installation.

The issues commonly faced by paved driveways is usually different based on several factors such as the weather, your location, your property’s sub base as well as some other elements. The ability to identify the problems and solve or repair them on time is key to success while it’s also save you some time and money. In this article we’re going to look at how to go about do-it-yourself tasks that involves minor cracks. More intense damages are advised to be handled only by professionals.

✓ Prepare the area. Clear the debris, weed the plants or vegetation (if any).

✓ Use a strong spray from a garden hose to wash clean the cracks

✓ In the event whereby the crack is deep, simply fill it until it reach about a quarter inch of the surface with sand.

✓ Tamp down the sand to make it more compact.

✓ Apply a patching compound to the surface of the cracked paved driveway.

✓ Leave it for some time to cure.

✓ Once cured, you can then apply your sealant.

How to make a shed door?
There are a few ways to make a shed door and each has their benefits, but we’re going to go through a quick guide on how to make a ledged and braced shed door, which is a good option to stop the door from dropping over time. Tools and equipment required
  • Tongue and groove timber boards
  • Boards for the ledges and braces, at least 20mm thick
  • Nails
  • Hammer
  • Saws, including a circular saw
  • Chisel
  • Mallet
How to make your shed door
  1. Cut your boards to size If you can’t buy boards at the right height and width for your door, cut the boards to length using a circular saw. Don’t forget to sand and treat any cut ends with timber preservative. Lay out the boards in the best arrangement for your shed door, with the inside of the door facing up.
  2. Arrange the ledges and braces On most shed doors, you’ll probably need 3 boards across the back of the door to form the ledges. The ledges keep the door straight and keep the boards of the door together. The braces are the parts of the door that slope down to form a ‘Z’ shape between the ledges. Ensure that the braces are sloped up from the bottom and middle hinge to stop the door from sagging as the timber expands and contracts in the weather. Once you’re happy with the arrangement, mark the spots on the boards where they will meet and cut out of the housings using a chisel and mallet.
  3. Put the door together Use clamps to pull the boards together and hold the ledges and braces in place. Nail from the front of the door through the boards and ledges to fix them. Secure the ledges and braces with screws; you may want to pre-drill and countersink holes to prevent the wood from splitting. Remember to treat them with preservative if you do.
  4. Fix the shed door hinges Make sure you measure carefully before attaching the hinges, ensuring you know where the pin sits in relation to where the door opens.
  5. Treat the door and add locks and handles Apply some wood oil, like linseed or teak oil, to help prevent water damage. Then add locks or handles to your shed to help keep it secure.
  6. If you’d rather leave it to the professionals, there are plenty of specialists that will be able to make a shed door for you, or even put up an entire shed.
how to repair hole in asphalt driveway?

Is there a hole in your asphalt driveway you feel you can repair yourself? If it’s something you know you can confidently do then this step by step guide is just for you. If otherwise, then we’d recommend you hire the services of a reliable professional who can guarantee the best results while also saving you some time and extra money that could result from possible errors. In this article, we’d go over the reparation process of an asphalt driveway with a hole in it.

✓ Get the necessary tools. You’re going to need a broom ( to clean the area), caulking gun ( to fill the hole), a hand tamp a plate compactor or a hammer ( to level the filled in hole) and a weeding glove (just in case there are weeds growing in the hole).

✓ Prepare the area. Do this by weeding the plants or weeds that might have grown inside the hole and identify your asphalt filler.

✓ Wet your soil, if necessary. It’s important to note that this is only necessary if your soil is dry to help the filler stick properly.

✓ Fill in deep holes. If the hole goes down about 3 to 4 inches or more, simply fill it with any material like rocks, clay etc.

✓ Apply the asphalt filler. Fill the hole with the asphalt filler to about half an inch higher than the surface of the driveway.

✓ Level the filler. For a large hole, make use of a plate compactor or a hand stamp, but a hammer will be sufficient for smaller holes.

✓ Cover the hole, if necessary. If your home isn’t level, covering your hole with a piece of plywood is advisable.

✓ Clean off the seal. After the asphalt looks done and in place, simply brush away the debris from the seal to finish off the project.

Why has my driveway cracked?

Driveway surfacing materials like concrete, asphalt and clay brick usually crack because they’ve been exposed to extreme temperatures or put under high pressure. It’s important to repair driveway cracks before they get worse and cause damage to vehicles and perhaps others to trip on raised cracks.

how to build garden steps

Chances are at some point you’d probably given a though about how steps would fit in perfectly in your garden, except of course, your yard and garden is flat. Adding steps and gardens makes it a lot easier to get around your yard while also enhancing its curb appeal. In order to avoid the cost of hiring a professional to get the task done, you might be tempted to make it a DIY task. However, if you lack the required skill and confidence to pull this off, we’d strongly recommend you call in a professional so as to avoid costly errors. In this post, we’re going to take you through the garden steps building process. Let’s take a look!

  1. Measure the vertical height of the slope by marking it with two parallel lines. Once done, proceed by connecting a string line to the slope’s top and hold it in a horizontal way, take a measurement of the flight’s length and breadth. Divide the measurement by 200mm to get the number of steps that’ll be required. Then proceed to divide the number by the height to identify the depth of each step.
  2. Working downwards from the flight’s top, dig the step shapes and also dig a shallow trench and install a concrete foundation.
  3. Enable the foundation to harden by leaving it for about 48 hours, then install two courses of bricks on the concrete strip and use gravel to backfill.
  4. With the help of a trowel, apply mortar to the top of the brickwork. Place the first slab on the mortar bed and press down. Then, make use of a spirit level to make sure that the steps are level.
  5. On the back edge of the first tread, you should proceed to build the second rise, backfill and install the slab to form the second tread – just like the previous step. Repeat this process until you’ve gotten to the top of the flight.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Maghera.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Maghera?

View our open Landscaper jobs near you

Join today
View Shortlist