Find a Landscaper you can trust in Ruardean.

Choose from 75 Landscapers, all rated by people like you.

Over 122 reviews & an average rating of 4.6/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

View Shortlist
Verified Pro

Alexander Constructors

0 review(s)
Offers services in RUARDEAN
South Wales, Penarth based design and build contractor. Projects completed include new houses, extensions, kitchens, bathr...
Verified Pro

MC Roofing & Landscapes

0 review(s)
Offers services in RUARDEAN
We offer a wide range of home improvements .e.g. paths patios garden maintenance, driveway installation, extensions repair...
Verified Pro

J&D Home Improvements

1 review(s)
Offers services in RUARDEAN
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro

Wellkeptfacilites

0 review(s)
Offers services in RUARDEAN
WellKept Facilities is a professional facilities maintenance and property services provider delivering reliable, compliant...
Verified Pro
Betterview Landscaping & Patios have been providing driveways, lock paving, tarmac and hard landscaping services acros...

Recent Landscaper Enquiries

08 Jun

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Pete L

Start Date: Immediate

grass cutting hedge cutting weed cutting are you the property owner: tenant (with permission) property type: semi detached do you have a: unsure garden type: back garden, front garden work required: h...

Post a similar request >

25 Jan

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Georgia S

Start Date: Immediate

Your business is registered to our property. Please can you get this amended.

Post a similar request >

29 Sep

Driveway Repair

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Pete L

Start Date: Immediate

I have a driveway but it needs to be made longer and wider so two cars can fit side by side.

Post a similar request >

16 Jul

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Rafal G

Start Date: Immediate

i’m looking for the quote for levelling and planting grass in small garden. potentially some patio or decking as well are you the property owner: tenant (with permission) property type: semi detache...

Post a similar request >

24 Jun

Garden | Landscaping

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Margaret D

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: hard and soft landscaping areas of garden to enable lower maintenance and then r...

Post a similar request >

24 Jun

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Margaret D

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: hard and soft landscaping areas of garden to enable lower maintenance and then ...

Post a similar request >

11 Nov

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Peter S

Start Date: Immediate

customer visited the mygardeningprices.co.uk site and submitted an enquiry. property type: detached, work description: dig up and remove 15 or so mature cornis and redig and remove self seeded saplin...

Post a similar request >

08 Oct

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: C R

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Regular gardening maintenance - wildlife friendly - including hedging, but exclud...

Post a similar request >

09 Aug

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Evelyn S

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Overgrown, hedges, shrubs, tree. Pensioner let garden get out of hand. Wo...

Post a similar request >

23 Jul

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Tanya L

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Hedges and striming

Post a similar request >

02 Jun

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Piers C

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Mowing Weeding Watering

Post a similar request >

12 Apr

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Steve C

Start Date: Immediate

Customer visited the myfencingprices.co.uk site and submitted an enquiry. Property type: House, Property owner: Owner, Panel number: 5+, Work description: Supply and install 23* 6ft long * 4ft high ...

Post a similar request >

06 Feb

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: John R

Start Date: Immediate

Customer visited the myfencingprices.co.uk site and submitted an enquiry. Property type: House, Property owner: Owner, Panel number: 1-2 panels, Work description: Post and rail fences with pig wire ...

Post a similar request >

20 Nov

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Mike C

Start Date: Immediate

Customer visited the myfencingprices.co.uk site and submitted an enquiry. Property type: House, Property owner: Owner, Panel number: 5+, Work description: Remove hedge supply and fit wood or metal f...

Post a similar request >

16 Apr

Garden | Landscaping

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Frank B

Start Date: 1 to 3 months

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: partially cleared area approx 1500 sq ft needs final clearing, levelling (proba...

Post a similar request >

15 Apr

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Rita S

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: Replace broken fencing and dealing with different levels of ground.

Post a similar request >

27 Sep

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Kim D

Start Date: 1 to 3 months

Rebuild parts of a approx 3ft stone wall and replace wooden panels to run along it. Six panels..between 6 and 7 ft high panels Are you the property owner: Owner of the property Property Type: Detached...

Post a similar request >

17 Jun

Garden | Maintenance & Upkeep

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Bernadette S

Start Date: 3+ months

Lawns and strim much needed plus some possible landscaping. Work all year round Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your garden: Unsure Garden...

Post a similar request >

01 Jun

Garden | Landscaping

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: S

Start Date: Immediate

Creation of terrace at the top of a one acre field. Steep gradient.

Post a similar request >

25 Nov

Fencing | Wooden

Drybrook, Longhope, Lydbrook, Mitcheldean, Ruardean - GL17

Enquiry from: Rachael M

Start Date: Immediate

Wooden Driveway gates to secure garden for a dog. There is a stone wall to either side. Opening is 12 feet. There is restricted space in relation to garage, driveway access and pavement. Are you the ...

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2026 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Ruardean is:

£1,887

Landscaper job Landscaper cost in 2026
Wooden fencing in Ruardean £1,063-£4,863
Landscaping in Ruardean £2,250-£3,450
Garden maintenance and upkeep in Ruardean £188-£288
Wooden decking in Ruardean £1,125-£1,725
Artificial Grass in Ruardean £3,000-£4,600
Garden shed in Ruardean £1,817-£3,730
Garden lighting in Ruardean £320-£480
Driveway repair in Ruardean £1,520-£2,280
Lawn Care in Ruardean £130-£200

Related Landscaper searches in Ruardean

Landscaper FAQs

how to repair hole in asphalt driveway?

Is there a hole in your asphalt driveway you feel you can repair yourself? If it’s something you know you can confidently do then this step by step guide is just for you. If otherwise, then we’d recommend you hire the services of a reliable professional who can guarantee the best results while also saving you some time and extra money that could result from possible errors. In this article, we’d go over the reparation process of an asphalt driveway with a hole in it.

✓ Get the necessary tools. You’re going to need a broom ( to clean the area), caulking gun ( to fill the hole), a hand tamp a plate compactor or a hammer ( to level the filled in hole) and a weeding glove (just in case there are weeds growing in the hole).

✓ Prepare the area. Do this by weeding the plants or weeds that might have grown inside the hole and identify your asphalt filler.

✓ Wet your soil, if necessary. It’s important to note that this is only necessary if your soil is dry to help the filler stick properly.

✓ Fill in deep holes. If the hole goes down about 3 to 4 inches or more, simply fill it with any material like rocks, clay etc.

✓ Apply the asphalt filler. Fill the hole with the asphalt filler to about half an inch higher than the surface of the driveway.

✓ Level the filler. For a large hole, make use of a plate compactor or a hand stamp, but a hammer will be sufficient for smaller holes.

✓ Cover the hole, if necessary. If your home isn’t level, covering your hole with a piece of plywood is advisable.

✓ Clean off the seal. After the asphalt looks done and in place, simply brush away the debris from the seal to finish off the project.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
how much does it cost to repair a driveway?

Is your driveway damaged or starting to show some signs of cracks and gaps? If yes, then you’d probably be thinking of repairing it before it gets even worse. Repairing a driveway is largely an unknown process but also a very tedious task as well. So if you’re looking to hire a professional for help, just how much is the repair going to cost? In this article, we’re going to look at the various factors that can determine the cost of a driveway repair.

In the UK, the average price of repairing a driveway is usually within the range of £1,400 to £1,800, where as the normal price of a driveway repair will range between £700 to £2,400. although some small repairs tasks can be as low as £250, while huge driveway repairs can skyrocket to about £4,200.

However, in general, the overall cost of repair a driveway can not be determined as each driveway is unique with their special repair needs. The factors that can influence the price of a driveway repair includes the material used, the perimeter of the driveway as well as the condition of the foundation. The only factor that’s not unique to any one driveway is the materials used, so let’s take a look at the differences in price using the based on the various types of materials available.

✓ Concrete. The average cost of repairing a concrete driveway is usually between £250 to £3,200. Have it in mind at most times the price of fixing an overly damaged driveway can be more than the cost of buying a new one.

✓ Asphalt. The average cost of repairing an asphalt driveway is usually between £750 to £2,800.

✓ Brick. The average cost of repairing a brick driveway is usually between £700 to £1,700.

✓ Cobblestone. The average cost of repairing a cobblestone driveway is usually between £500 to £1,600.

How to build a shed base?
You need a firm, level base for your shed to ensure that it stays structurally sound – without one, doors will sag, walls will lean and it won’t last you as long. But how do you build a shed base and what should you make it from? Timber shed bases A timber shed base is made from pressure-treated timber and has metal spikes that you hammer into the ground to keep it in place. You can often buy them with your shed installation kit, but they also come separately, often in 6x4 or 7x5 sizes. To build a timber shed base, you’ll drill holes then fit screws in the timber until the entire frame is built. Remember to check it’s square, then fix L-shaped feet to the inside of the frame. If you’re putting your shed on a hard surface like concrete, this is all you need to do. If you’re putting the base on soft ground, hammer in spikes at each corner until they’re level with the top of the base, then secure the spikes to the base with screws. Then you can position the shed floor onto the base. How to build a plastic shed base A plastic shed base is a simple and quick way to build a shed base. You can lay it on level concrete or paving slabs, but adding sharp sand on top will help keep it more secure. They come in a kit containing plastic grids. To build your plastic base, first measure out the site and hammer a peg into each corner and tie with string or builder’s line. Make it slightly larger than the shed base to help with drainage. Then cut into the lawn and remove the turf, making sure it’s level. Lay down a membrane sheet and weigh it down if it’s windy. Then lay out the number of plastic grids you need, then remove the locking pins and clip all the grids together. Once they’re all connected, put the locking pins back in the centre of the grids. Put your shed floor on top and you’re done! Concrete or paved shed bases For a concrete base or a shed base made from paving slabs, you’ll need to dig a sub-base. For concrete bases, you’ll need to dig down 150mm so you can add 75mm of compact hardcore under 75mm of concrete. For paved shed bases, you’ll want it to be about 120mm deep for 50mm of compact hardcore and the paving slabs.
  1. How to build a shed base out of paving slabs
    • Mix sand and cement together to make mortar or use a pre-mixed one
    • Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
    • Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
    • Next lay slabs along the two adjacent outer edges, filling in the central area row by row
    • Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
  2. Building a shed base from concrete
    • Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
    • Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
    • Wet the sub-base using a watering can with a rose on the end
    • Pour the concrete onto the framed base starting in one corner
    • Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
    • Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
    • Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
    • Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
    • Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
    • Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
    • Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Don’t fancy having a go at building a shed base yourself? Get a range of quotes from a professional and see how much it will cost.
Can I attach something to my neighbour’s fence?

There are a number of reasons why disputes can arise between neighbours – all of which can be quite frustrating and challenging. In some cases, this can even cause serious friction and lead to an all-out war. When it comes to the topic of fencing, one of the most common questions that arises is whether or not you can attach something to your neighbour’s fence. If you’re having the same concern, then you’ve come to the right place. In this post, we’re going to give you a good insight into this to help you make informed decisions moving forward. Let’s take a look!

 

The short and simple answer to this question is no, you can’t attach anything to your neighbour’s fence. If your neighbour owns the fence and you’ve not obtained any permission to do so, then you’re not allowed to attach anything to the fence. Otherwise, you can get into serious trouble with your neighbour as well as the law. If you want to attach something or have the wall on your side painted using another colour, then there’s the need to get a permission from the owner. And while doing so, make sure you’re provided with a written permission so as to avoid problems later in the future.

 

Another question that mostly arises is what if your neighbour declines your request, is there anything you can do about it? Well, the answer to this is no, there’s nothing you can do about it unless you’re able to convince your neighbour otherwise. And you should know starting a neighbour war or being spiteful can only make matters worse for you.

How to overseed a lawn?

Overseeding your lawn is an essential part of keeping your lawn looking its best. It’s also known as reseeding, and helps to repair damaged areas that might have been caused by a harsh summer or winter. It’s best to overseed your lawn during the spring or autumn, when the temperature is mild but there’s still a fair amount of rainy days to help the grass seed grow. To prepare your lawn for overseeding, you should do the following things around 1-2 weeks beforehand:

  • Weed the lawn by hand or using a weedkiller (make sure you leave enough time to do this according to the instructions)
  • Remove stones and large twigs
  • Scarify your lawn to remove moss and loosen soil
  • Fertilise the soil with a quick-release fertiliser

Once you’ve taken these steps, you’re ready to start overseeding your lawn.

  1. Mow your lawn to around 25mm in length.
  2. Water the soil so it’s moist but not too damp.
  3. Sprinkle your new grass seed evenly over the lawn, but apply more in patchy or thin areas. Generally gardeners say to use 35g per square metre, but up to 50g on thin areas.

When you’re finished, give your lawn a final water, and do this every day until the new grass is established – particularly if it’s not rained. Just make sure you don’t overwater it. It’s also a good idea not to walk on your lawn for around 2-3 weeks after you’ve overseeded it.

How to edge a lawn?

If your lawn edges are overgrown, it can make an otherwise well-cared for lawn look unsightly. Luckily, it’s easy to edge your lawn and make it look beautiful again. You should edge your lawn every spring and trim any overhanging grass you notice after mowing. How to edge a lawn There are different types of equipment you can use for different types of edging:

  • Edging shears
  • Half-moon edger
  • Grass shears with a long handle
  • Gardening knife
  • Long rope or a plank of wood

Depending on how regularly you’ve maintained the edging of your lawn, you might want to do one of the following things:

  • Annually in spring or if you’ve left the grass to get out of hand: Decide whether you want a straight or a curved edge along your lawn. If you want a straight edge, lay a plank of wood along the edge and use your half-moon edger to cut along. If you want a curve, lay a rope along the edge and cut along that. Or if you can still see the existing curve of the lawn, you can stick with that.
  • After mowing: Use long-handled shears to trim the grass the mower couldn’t reach. If you want to make it look extra tidy, collect up the cuttings and put them on your compost heap or dispose of them.
  • Overgrowing grass onto paths: Use a sharp gardening knife to cut the pieces of turf that are growing over the path and pull them away.
  • When your lawn is flush with the path: Snip a clean edge along your path with your long-handled grass shears to make it look neat and tidy.
  • If you’d rather a low-maintenance option: Spiked metal sheeting is a good material to use to keep your lawn’s edges at bay. Fix it in the ground along the edges to keep the outline of your lawn and stop it from growing into your borders.

The best way to keep your lawn edges looking fabulous is to keep them maintained. Remember to give them a little trim every time you mow your lawn to be the envy of all your neighbours.

How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Ruardean.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Ruardean?

View our open Landscaper jobs near you

Join today
View Shortlist