There is a variety of methods available to ensure that your paving drains properly, for example draining into a lawn or soakaway. Correct drainage of paving is a requirement for planning permission. See our guide on planning permission for paving for more information.
Find a Landscaper you can trust in Merriott.
Choose from 40 Landscapers, all rated by people like you.
Over 102 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Landscapers near you
Orchard Landscapes
Premier Roofing & Building
Alexander Constructors
How much do Landscaper services cost?
How much do Landscapers cost? Prices for Landscapers in 2026 can vary depending on the type of work that you want to have performed in your home.
If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?
Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.
In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.
The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.
View our Landscaper cost guide View our Landscaper adviceThe average price
of a Landscaper in Merriott is:
£1,478
| Landscaper job | Landscaper cost in 2026 |
|---|---|
| Wooden fencing in Merriott | £713-£1,313 |
| Landscaping in Merriott | £2,250-£3,450 |
| Garden maintenance and upkeep in Merriott | £188-£288 |
| Wooden decking in Merriott | £1,125-£1,725 |
| Artificial Grass in Merriott | £3,000-£4,600 |
| Garden shed in Merriott | £475-£1,595 |
| Garden lighting in Merriott | £320-£480 |
| Driveway repair in Merriott | £1,520-£2,280 |
| Lawn Care in Merriott | £130-£200 |
Landscaper FAQs
- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
If your lawn edges are overgrown, it can make an otherwise well-cared for lawn look unsightly. Luckily, it’s easy to edge your lawn and make it look beautiful again. You should edge your lawn every spring and trim any overhanging grass you notice after mowing. How to edge a lawn There are different types of equipment you can use for different types of edging:
- Edging shears
- Half-moon edger
- Grass shears with a long handle
- Gardening knife
- Long rope or a plank of wood
Depending on how regularly you’ve maintained the edging of your lawn, you might want to do one of the following things:
- Annually in spring or if you’ve left the grass to get out of hand: Decide whether you want a straight or a curved edge along your lawn. If you want a straight edge, lay a plank of wood along the edge and use your half-moon edger to cut along. If you want a curve, lay a rope along the edge and cut along that. Or if you can still see the existing curve of the lawn, you can stick with that.
- After mowing: Use long-handled shears to trim the grass the mower couldn’t reach. If you want to make it look extra tidy, collect up the cuttings and put them on your compost heap or dispose of them.
- Overgrowing grass onto paths: Use a sharp gardening knife to cut the pieces of turf that are growing over the path and pull them away.
- When your lawn is flush with the path: Snip a clean edge along your path with your long-handled grass shears to make it look neat and tidy.
- If you’d rather a low-maintenance option: Spiked metal sheeting is a good material to use to keep your lawn’s edges at bay. Fix it in the ground along the edges to keep the outline of your lawn and stop it from growing into your borders.
The best way to keep your lawn edges looking fabulous is to keep them maintained. Remember to give them a little trim every time you mow your lawn to be the envy of all your neighbours.
Hard landscaping refers to structural elements like patios, pathways, paving and sheds, usually required for a complete garden overhaul. Soft landscaping means plants, grass and trees, this can usually be managed by a general gardener and requires little disruption.
- Plan your shed base
You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
- A concrete base laid on hardcore
- Concrete slabs on sharp sand
- Treated wood beams on hardcore or shingle
- An interlocking plastic system
- Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
- Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
- Put up the shed walls
- Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
- Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
- Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
- Fit the roof
- If the shed comes with a support bar, put this in position before you put the roof panels in.
- Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
- Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
- Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
- Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
- Add the shed windows
- Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
- From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
- Fix the window beading on the top and sides with 25mm nails.
- Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Most responsible contractors will dispose of the old fencing via an approved commercial waste site. Do check that the cost of taking rubbish away is included in the quotes you receive, otherwise you might find you get stung when it comes to paying for the work.
- Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
- Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
- Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
- Get a length of post longer than you need and place one in each hole. You can cut it down later.
- Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
- Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
- Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
- Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
- Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
- Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
- Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
- Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
- Trim down all the posts to the correct height using a saw.
- Add your weed-control fabric and weigh down with gravel across the entire area.
- Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
- Attach a joist hanger to each end of the joist.
- Place the joist in position so the centre lines up with the 400mm spacer mark.
- Secure using external grade screws once you’re happy that the joist is flush with the frame.
Landscaper help and advice
How it works
Tell us about your Landscaper project
Answer a few quick questions to help us match you with the right Landscaper
Get up to 4 free quotes
Receive no-obligation quotes from 4 Landscapers working in Merriott.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Landscaper.
Are you a Landscaper in Merriott?
View our open Landscaper jobs near you
Join today