Find a Shop Fitter you can trust in Westminster.

Choose from 0 Shop Fitters, all rated by people like you.

Over reviews & an average rating of /5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Shop Fitters near you

View Shortlist

Sorry!

We can't find any professionals in your area at the moment. If you're a professional looking to take advantage of our service, you can sign up for free here

Recent Shop Fitter Enquiries

02 Jun

Air Conditioning | Repairs & Service

London - W3

Enquiry from: Homy M

Start Date: Immediate

Service or repair air con Looking for quotes.

Post a similar request >

02 Jun

Air Conditioning

London - SW4

Enquiry from: Burak K

Start Date: Immediate

Commercial installation of air con needed

Post a similar request >

01 Jun

Roofline | Soffits / Fascias

London - SW17

Enquiry from: Ponnampalam S

Start Date: Immediate

are you the property owner: tenant (with permission) property type: terrace

Post a similar request >

01 Jun

Windows | uPVC

London - SW17

Enquiry from: Gina W

Start Date: Immediate

Call anytime. Number of windows: 7 Number of doors: 2 Quote requested on windows and doors, in PVCu, to be supplied and fitted.

Post a similar request >

31 May

Windows | uPVC

London - NW8

Enquiry from: Hanan J

Start Date: Immediate

Customer made an online enquiry for replacement windows via one of our websites. Confirmed via . 2+ windows Supply and install Please call to arrange an appointment to quote.

Post a similar request >

31 May

Windows | Velux

London - SW16

Enquiry from: Joe W

Start Date: Immediate

Skylight for bathroom (currently no window)

Post a similar request >

30 May

Air Conditioning

London - NW4

Enquiry from: Cookie M

Start Date: Immediate

rip out existing split Aircon and replace with yours. ideally need it to be 18000 but and an Aircon that goes to 16degrees.

Post a similar request >

30 May

Air Conditioning

London - W14

Enquiry from: Samir Y

Start Date: Immediate

install air con in my flat. need quotes.

Post a similar request >

29 May

Tree Surgery

London - W10

Enquiry from: Eva M

Start Date: Immediate

I need to have a yellow-plum tree removed iodine stumps.

Post a similar request >

29 May

Roofing | Pitched | Repair

London - NW10

Enquiry from: Muniza I

Start Date: 1 to 3 months

 Lead  Lead  Lead

please only email as working roof needs leak repair and lead flushing seal redone. some flat area (less 20%). we would like a proper survey for accurate costs up front. are you the property owner: own...

Post a similar request >

29 May

Air Conditioning | Repairs & Service

London - NW2

Enquiry from: Nasar I

Start Date: Immediate

Air conditioner is not working

Post a similar request >

29 May

Air Conditioning

London - SW15

Enquiry from: Mo E

Start Date: Immediate

Installing split units ACs

Post a similar request >

28 May

Asbestos | Removal

London - W5

Enquiry from: Steve L

Start Date: Immediate

Removal of garden shed , roof and few of the side panels are asbestos sheets. Shed if c2.5m x 3m

Post a similar request >

28 May

Air Conditioning

London - W3

Enquiry from: Paro M

Start Date: Immediate

Install in multiple rooms4

Post a similar request >

26 May

Air Conditioning

London - W5

Enquiry from: Omer M

Start Date: Immediate

Install in one room Looking for quotes.

Post a similar request >

26 May

Air Conditioning

London - NW11

Enquiry from: Matt R

Start Date: Immediate

New air conditioner Looking for quotes.

Post a similar request >

25 May

Insulation | External Wall

London - W5

Enquiry from: Kaushik G

Start Date: Immediate

require quote for front wall ground and first floor external insulation asap if possible using govt grant are you the property owner: owner of the property property type: terrace property age: 1930-7...

Post a similar request >

25 May

Air Conditioning

London - SW20

Enquiry from: Sinnathamby R

Start Date: Immediate

I already have an air conditioner which was installed 20 yrs ago and stopped working 2 years back . I need someone to check and advice what to do? Repair or replace?

Post a similar request >

25 May

Air Conditioning

London - SW15

Enquiry from: Surbhi V

Start Date: Immediate

Install in multiple rooms. 5 rooms

Post a similar request >

22 May

Pest Control

London - W5

Enquiry from: Juliet S

Start Date: Immediate

2 bedroomed empty flat. Carpet moth infestation

Post a similar request >

How much do Shop Fitter services cost?

How much do Shop Fitters in Westminster charge?
Prices for Shop Fitters around Westminster can vary relying on the type of work that you require to have done in your house. It's the question we are asked a great deal "how much do Shop Fitters in Westminster charge?". It's always very good to have an idea of how much a Shop Fitter will likely cost for their services. Rates will likely vary based upon the materials as well as the tradesman selected. The table shows the types of service that Shop Fitters generally do as well as the average cost series of these tasks. Some tasks take longer to complete than others so costs do be very different by project.

Tasks that Shop Fitters in Westminster can do:

View our Shop Fitter cost guide View our Shop Fitter advice

Shop Fitter FAQs

How long can scaffolding be left up?

You must use a builder or scaffolding outworker who is skilled and knowledgeable to put up scaffolding. This means they require to have the essential skills, knowledge and familiarity to be able to accomplish health and safety. A capable scaffolder will hold an effective Construction Industry Record Scheme (CISRS) Card – it is up to your agent to check that this person is capable before any work begins.

When should scaffolding be checked for safety?

According to the law, the user of the scaffolding must check it to ensure that it is safe:

• Before they first use it

• After every seven days after putting it is up

• After any alterations, or damage due to extreme weather conditions

When do you need scaffolding?

It is up to your trader to evaluate the level of hazard and use a suitable apparatus. Repairing or replacing a single tile is never going to be same as installing solar panels that are high up 30 storeys high. Everything is dependent on the type of work and the risks involved. Traders need to guarantee that their staff will remain safe as they work on your property. This means working from the ground if possible. If they need to work at higher altitudes, they must minimise the danger of falling by using present safe roof zones or scaffolding.

You wouldn’t need a license if your builder has to put up scaffolding inside your property premises. However, if the scaffolding has to go out on the pavement or anywhere outside your premises, your builder or scaffolder needs to get a license from the building council.

Insurance

Scaffolders face an inimitable set of hazards due to working at high altitudes. Builders or scaffolding organizations require insurance that covers those risks, together with public liability insurance to cover any damage to the public triggered by falling items from the scaffold as well as employers’ liability insurance to cover their persons if they are wounded while working at height. This is an important thing to check before any other work begins.

Will I have to get different contractors for the plumbing, heating and electrics?

In some circumstances, you may have to hire different companies for different parts of your garage conversion. But most of the time, garage conversion companies have their own tradespeople or contractors that are qualified to do all the work involved. When you're at the quotation stage, any contractor will advise you of what they are able and not able to cover.

how to tile a floor?

Are you interested in having a tiled floor in your residential or commercial space? There are so many benefits that comes with installing tiles and that’s why so many home or property owners are considering it. Not only do they increase the visual appeal of the property, but they’re also resistant to moisture helping to increase the durability of the house, whether it’s wall or floor tiles. So if you wish to lay tiles for your house, this guide will help put you in the right direction, ensuring you get it right, the first time.

Floor Tiles Installation Procedures

• Floor Preparation

✓ The first step is to prepare the floor by moving all objects like mortar, adhesives and more.

✓ Use concrete patching compound to fill ill low spots and cracks, until the floor is levelled.

✓ Ensure the floor is dry and clean.

• Pattern Layout

✓ Take the measurement of each wall’s length while also taking into account the room’s diagonals.

✓ To help place the tiles in an orderly manner, make use of a chalk to mark down lines on the levelled surface in question and ensure it’s parallel to the walls.

• Adhesive Preparation

✓ Mix the appropriate amount of water with the adhesive (bonding agent).

✓ The mixture should be toothpaste-like thick to ensure the durability of the tiles.

• Tiles Placement

✓ Depending on the tile’s size, evenly spread the mortar on the floor using a notched trowel.

✓ Lay the first tile on the bonding agent (adhesive or mortar) and apply a gentle and little pressure on the tile.

✓ Repeat the technique for other tiles using plastic spacers to ensure the edges and corners are properly aligned.

• Tiles Cutting

✓ Cut the tiles (if necessary) with the help of a wet saw or scoring cutter featuring a diamond-tripped blade.

• Grout Application

✓ Filling of the tiles’ gap is done using the grout. It can be applied to the joints with a rubber float.

✓ After application, allow the grout to set up for some minutes.

✓ Use sponge and a bucket of water to clear out any adhesive leftover.

• Grout Sealing

✓ Use a foam brush or applicator bottle for the sealants’ application.

✓ Clean out excess sealer within 10 minutes.

Floor tiling can be a very tricky activity that can end up being disastrous, especially when done by a novice. Unless you have prior experience or well-trained, it would be advisable to employ the services of a seasoned professional - it’ll save you lots of time, money and guarantee a top quality job is done.

what thickness plasterboard for ceiling?

Plasterboard or drywall is simply gypsum plaster covered from both sides by thick paper layers. It’s known to be a highly versatile product used on both interior walls and ceiling as a result of its numerous advantages. This popular material in residential buildings can be designed to be fire resistant, humidity resistant and noise resistant. They have a low impact on the environment, while also being quite easy to repair and perfect to hide stuffs from plain sight. Most home and property owners in the UK have this material installed in their space as despite the multiple benefits, they’re also quite affordable. However, if you’re thinking about installing a plasterboard on your ceiling, one challenge you’re likely to face is determining the appropriate plasterboard thickness to incorporate as this make or mar your entire project. In this post, we’re going to take a look at the right plasterboard thickness for ceiling so as to help you make an informed decision moving forward. Let’s take a look!

 

Firstly, let’s consider the size of the plasterboard sheet. The standard plasterboard sheet size is 120 cm in width and within the range of 180 cm to 360 cm in height. These sizes are designed to provide the much-needed support to the standard stud spacing which is 160 cm. Depending on the manufacturer, plasterboard can be in four different widths. Now talking about the thickness, there are two standard thicknesses of plasterboard - 9.5 mm and 12.5 mm. The sizes of plasterboard for ceilings are 9.5 mm or 10 mm. Most individuals tend to assume that the thicker the plasterboard the better, but this is absolutely false. A thicker plasterboard will only stick harder to the ceiling which will make it hard to seal joints if required.

how long does it take to pebble dash a house

Are you looking to pebble dash your house? This is a cool way to add a stunning new look to your home or property while also adding to its resale value should you wish to sell later on. The list of the benefits goes on, however one thing that most home and property owners would like to know before starting such a project is exactly how long it’ll take to complete it. If you’re also having similar thoughts, then you’ve come to the right place! In this post we’re going to give you an insight into the duration of pebble dashing a house. Let’s take a look!

First and foremost, just like any other home improvement project, the duration of a house pebble dashing project is affected by a number of variables. These variables include the size of your house, the company or contractor hired and lots more. In general, a house pebble dashing project should take within the range of 3 to 14 days depending on the size of your home. It should be noted that you’ll have to pay the workers on a daily basis. Most labourers will charge within the range of £140 to about £160 per labourer per day. And you should expect to have at least 2 labourers to work on your house’s pebble dashing project per day. On the other hand, the more labourer you have working on your project, the more you’re going to pay on a daily basis but this will also significantly reduce the time frame it’ll take to get the project over the line.

How to repair resin bound driveways?

Resin bound driveways are known to last a long time without the need for repairs, but sometimes accidents happen. You also need to make sure you regularly maintain your driveway by sweeping and power washing it to prevent damage. But if it does get damaged, how do you repair your resin bound driveway?

If you notice a crack in your resin bound driveway, it’s important to repair it as soon as possible. If you leave it to erode, you could end up with a difficult repair that will cost much more money.

To repair a crack, you’ll need to carefully chisel it open slightly so you can apply a primer then fill in the crack with a matching-coloured resin and aggregate mix. While there are variations in colour and size with all stone mixes, usually it’s easy to find a batch that matches almost perfectly. And once the crack has been repaired for a while, it will blend in seamlessly with the rest of your driveway.

To prevent cracking in your resin bound driveway, it’s best to tackle the issue at initial installation. Speak to your installer about whether it’s possible to add fibreglass mesh to the base. You should also ask your installer to add expansion trims as these will significantly reduce the risks of cracks.

So the best way to repair resin bound driveways is to prise open the crack and fill it in. It might seem simple, but getting the right colour match is something that should be left to the professionals, so get a few quotes to ensure you get the best finish.

how to plant a garden?

There are several reasons why you may wish to plant a garden. To have a healthier environment, eat healthier, cook with fresh produce and lots more. Regardless of your purpose, one challenge faced by several home and property owners is exactly how to go about this and where to get started. If you’re having the same issues, then you’ve come to the right place. In this post, we’re going to take you through the process involved in planting a garden to ensure your project turns out a success. If you lack the confidence required to pull this off, we’d highly recommend you call in a professional who can guarantee the best results.

  1. Start small. Being overly ambitious when planting a garden could be easiest way to a disastrous outcome. Give yourself a realistic goal and learn to plant healthy and productive plants by starting small.
  2. Identify your site. To ensure a great garden, the plants need lots of sunlight. So, you can go for a space that gets about 6 to 8 hours of sunlight on a daily basis. Also, make sure that there’s a water source nearby to make it easy to give your plants water as required.
  3. Choose you garden type. Decide how your garden will grow, be it in raised beds, in ground, in containers or a combination of styles. This will ensure that your garden is neat and orderly while also enhancing its curb appeal.
  4. Make a list. Create a list of the plants you’d love to have in your garden.
  5. Plan your planting. This involves spacing your plants as they’re going to grow bigger, deciding which plant goes where and identifying the best soil to grow them.
  6. Get your plants.
  7. Plant them.
How to lay floor tiles on concrete?

How To Lay Tiles On Concrete

Installation of tiles on concrete sub-floors can be done with relative ease under adequate guidance. Here is what you have to do.

lPrepare The Concrete Subfloor

• Ensure the concrete is dry, clean and must be at least 6 weeks old.

• If there are dips and humps, level the concrete using a levelling compound.

lSet Out

• Working from the centre outwards, take a measurement of the floor (both length and width) and draw a cross at the centre.

• Lay out the tiles from the cross with a space of 3mm between each tiles. This will allow for movement stresses within the floor and later to be filled with grout upon installation of the tiles and adhesive dried.

 

lCut The Tiles

• Due to the particularly had nature of some floor tiles such as natural stone and porceclain, high quality tools are usually required to produce a clean cut through the tiles. With the help of an electric wet cutter alongside a slide cutter and nippers, your job would be made a lot easier.

• For a better result during intricate cuts, make use of a cardboard template.

lFix The Tiles

• The tiles should be fixed using a cement-based adhesive.

• Ensure to refer to the packaging or product data for the mixing ratios information.

• Stir the mixture till its lump-free

lApply The Mixture

• Spread the mixture onto the concrete sub-floor to create parallel ribs with the help of a floor trowel.

• Push the tiles into the parallel ribs.

• Clear out any excess adhesive from the tiles surface with a damp sponge.

• Do not walk on the tiles for at least 2 hours.

lGrout

• Once the adhesive is dried, wipe out any dust, adhesive or dirt from the tiles’ gaps.

• Mix about 4 to 5 parts of grout powder with 1 part of water and ix together.

• Apply the mixed grout diagonally across the tiles using a soft rubber grout float.

• Wipe out excess grout from the tiles surface and allow the tiles to dry.

• Stubborn residues can be cleaned using any washing up detergent with warm water within 24 hours after grouting.

Shop Fitter help and advice

How it works

Tell us about your Shop Fitter project

Answer a few quick questions to help us match you with the right Shop Fitter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Shop Fitters working in Westminster.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Shop Fitter.

Are you a Shop Fitter in Westminster?

View our open Shop Fitter jobs near you

Join today
View Shortlist