Flooring | Tile
Cheltenham - GL54
Enquiry from: Natalie M
Start Date: Immediate
Vinyl flooring to run through the bathroom and front door space, and advice on bedroom carpet
-->
Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Tilers near you
Cheltenham - GL54
Enquiry from: Natalie M
Start Date: Immediate
Vinyl flooring to run through the bathroom and front door space, and advice on bedroom carpet
Cheltenham - GL54
Enquiry from: Anna E
Start Date: 1 to 3 months
Wood-effect lino in the kitchen required and laid. Are you the property owner: Owner of the property Property Type: Semi detached How many rooms are you looking to have tiles fitted to: 1-2 Rooms What...
Cheltenham - GL54
Enquiry from: TREVOR S
Start Date: Immediate
TILE COMPLETE SMALL BATHROOM
Cheltenham - GL54
Enquiry from: Phillip W
Start Date: Immediate
Property type: Terrace Property owner: Owner Number of rooms to be tiled: two Work description: 60x60 cm tiles size Kitchen diner 4.50 x 3.50 Leading into small hallway into cloakroom and cupboar...
Evesham - WR11
Enquiry from: John D
Start Date: Immediate
a new extension needs floor tiling and skirting boards. it is approximately 12 to 13 square metres. we have already bought tiles from b&q. are you the property owner: owner of the property property t...
Evesham - WR11
Enquiry from: John D
Start Date: Immediate
floor tiling and skirting board for new build conservatory/garden room (by etc). approximately 12 sq metres (irregular shape). tiles purchased from b&q are you the property owner: owner of the proper...
Cheltenham - GL51
Enquiry from: Cynthia N
Start Date: Immediate
Lounge 25ft x 20ft Engineered wood fitting included
Cirencester, Fairford, Lechlade - GL7
Enquiry from: Julie C
Start Date: Immediate
kitchen floor. currently tiled would like it to be replaced as part of kitchen refurbishment. kitchen size 171/2 feet x 12 1/2 feet are you the property owner: owner of the property property type: ...
Cheltenham - GL51
Enquiry from: Steve B
Start Date: Immediate
Tile kitchen. 3 walls to ceiling
Tewkesbury - GL20
Enquiry from: Vivienne W
Start Date: Less than one month
Approx 30sq metres of floor tiles to lay. Floor stripped Within next 2/3 was if possible nRegards - : - : - : Are you the property owner: Owner of the property Property Type: Detached How many ro...
Tewkesbury - GL20
Enquiry from: Jan H
Start Date: 1 to 3 months
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Number of rooms to be tiled: one, Work description: Travertine tiles on kitch...
Cheltenham - GL51
Enquiry from: Tanbir S
Start Date: Immediate
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Other, Property owner: Owner, Number of rooms to be tiled: one, Work description: I would like a quote for wal...
Cheltenham - GL51
Enquiry from: Michelle S
Start Date: 1 to 3 months
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Number of rooms to be tiled: one, Work description: Bathroom tiling, flo...
Cheltenham - GL51
Enquiry from: Michelle S
Start Date: 1 to 3 months
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Number of rooms to be tiled: one, Work description: Bathroom tiling, flo...
Tewkesbury - GL20
Enquiry from: Simon C
Start Date: Immediate
home owner To tile my kitchen floor supplied & fitted time scale -immediate please call to appoint *
Broadway - WR12
Enquiry from: Stewart E
Start Date: Immediate
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Detached, Property owner: Owner, Number of rooms to be tiled: one, Work description: 35 metres of quarry floor...
Evesham - WR11
Enquiry from: Anne B
Start Date: Immediate
Home Owner Bathroom tiles to be fitted Please call to appoint *
Cheltenham - GL52
Enquiry from: Dan B
Start Date: Immediate
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Number of rooms to be tiled: two, Work description: Looking for ti...
Cheltenham - GL52
Enquiry from: Dan B
Start Date: Immediate
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Semi detached, Property owner: Owner, Number of rooms to be tiled: two, Work description: Looking for tiling o...
Cheltenham - GL53
Enquiry from: Alix K
Start Date: Immediate
Customer visited the mytilingprices.co.uk site and submitted an enquiry. Property type: Other, Property owner: Owner, Number of rooms to be tiled: two, Work description: We would like our kitchen an...
How much do Tilers in Winchcombe cost?
Costs for Tilers around Winchcombe can fluctuate relying on the type of service that you require to have actually carried out in your home. It's the question we get asked a lot "how much do Tilers in Winchcombe charge?". It's often really good to have an idea of how much a Tiler will likely charge for their work. Rates will most likely vary based upon the materials as well as the tradesperson picked. The list shows the kinds of service that Tilers usually do as well as the average price range of these projects. Some projects take longer to complete than others so prices do vary by project.
Tasks that Tilers in Winchcombe can do:
Tiler job | Tiler cost in 2025 |
---|---|
Floor tile fitting in Winchcombe | £375-£575 |
Floor tiling in Winchcombe | £1,125-£1,725 |
Wall tile fitting in Winchcombe | £375-£575 |
Wall tiling in Winchcombe | £525-£805 |
Kitchen Tiling in Winchcombe | £525-£805 |
Are you interested in fitting tiles in your home or office? If yes, then you’d probably want to know the total cost of getting the project over the line. And being fully aware every job is unique, having a cost per square metre to work with will give you a more accurate price estimation for the overall project.
First and foremost, the cost of a tiler depends on a wide range of factors such as the type of floor tiles and the size of the area. The cheapest of them all is the vinyl tiles which can be easily cut through and waterproof when properly sealed. As a result, making them a better fit for bathroom floors. Other kinds of tiles include ceramic tiles, mosaic tiles, quarry tiles and porcelain tiles. Each of the types have their own unique qualities including the quarry tiles’ durability and the afore-mentioned vinyl tiles’ waterproof qualities.
Having in mind that the major part of your tiles cost largely depends on the size of the area and the type of tile selected, you can then go ahead to contact your preferred tiling professional for an installation quote. The average price of bathroom tiles installation ranges about £20 to £25 per square metre. Meanwhile for a kitchen floor tiling project, the cost should range between £20 to £50 per square metre.
Finding a tiling professional you can rely on to complete your project and deliver a top quality job while also offering a very competitive price can be almost impossible. The professional you use greatly determines the price of your tiling effort, so there’s the need to review various professionals before making a decision.
Kitchen fitters are often trained carpenters and not all will offer tiling but many will know a tiler that they have worked with in the past. If you are looking to get your kitchen retiled without fitting a new kitchen when it's worth talking to tilers directly to get a range of prices.
It's useful to know in advance what tiles you like, a visit to your local tile store and either pick up a brochure or take some photos. It's probably better not to purchase the tiles at this moment though as often your appointed tiler may be able to get you a better price for the tiles or recommend alternatives.
A tiled floor perfectly blends style with function, be it a sophisticated matte finish or a gleaming glossy sheen. Moisture and stain resistant, floor tiles represent a practical choice for a busy home and its elegance makes it even more suitable irrespective of the interior design project. What’s more? Floor tiles are generally cost effective and requires low maintenance, however, this doesn’t mean you should not show your tiled floor some love and care from time to time. If you’re wondering how to go about the maintenance of your tiled floor, then you’ve come to the right place. In this post, we’re going to share with you some maintenance tips to take care of your floor tiles. Let’s take a look!
How To Lay Tiles On Concrete
Installation of tiles on concrete sub-floors can be done with relative ease under adequate guidance. Here is what you have to do.
lPrepare The Concrete Subfloor
• Ensure the concrete is dry, clean and must be at least 6 weeks old.
• If there are dips and humps, level the concrete using a levelling compound.
lSet Out
• Working from the centre outwards, take a measurement of the floor (both length and width) and draw a cross at the centre.
• Lay out the tiles from the cross with a space of 3mm between each tiles. This will allow for movement stresses within the floor and later to be filled with grout upon installation of the tiles and adhesive dried.
lCut The Tiles
• Due to the particularly had nature of some floor tiles such as natural stone and porceclain, high quality tools are usually required to produce a clean cut through the tiles. With the help of an electric wet cutter alongside a slide cutter and nippers, your job would be made a lot easier.
• For a better result during intricate cuts, make use of a cardboard template.
lFix The Tiles
• The tiles should be fixed using a cement-based adhesive.
• Ensure to refer to the packaging or product data for the mixing ratios information.
• Stir the mixture till its lump-free
lApply The Mixture
• Spread the mixture onto the concrete sub-floor to create parallel ribs with the help of a floor trowel.
• Push the tiles into the parallel ribs.
• Clear out any excess adhesive from the tiles surface with a damp sponge.
• Do not walk on the tiles for at least 2 hours.
lGrout
• Once the adhesive is dried, wipe out any dust, adhesive or dirt from the tiles’ gaps.
• Mix about 4 to 5 parts of grout powder with 1 part of water and ix together.
• Apply the mixed grout diagonally across the tiles using a soft rubber grout float.
• Wipe out excess grout from the tiles surface and allow the tiles to dry.
• Stubborn residues can be cleaned using any washing up detergent with warm water within 24 hours after grouting.
If you’re thinking about the better option between tiling your walls either before or after fitting a kitchen, you’ve come to the right place! In this article, we’ll give a good insight on the best practices to help you plan and also avoid making costly mistakes.
The short and simple answer to this question is - it depends. It depends on structure of your home or property, your kitchen as well as the surface in question, the materials selected and also your unique preferences. This answer is mainly provided because there’s no tile industry standard explaining when a kitchen or cabinet should be fitted. Therefore, there’s a need to check the suitability of any structure and substrate needs by a professional before you determine the type of tile installation as well as when to install the tile.
If you decide to install the wall tiles before fitting the kitchen, here are some benefits you stand to derive:
✓ There will be no finish cuts or sealant application required for the perimeter joints at the finished sides of the cabinets making the installer’s job a lot easier
✓ This also implies extra square footage for the installer, but less detail as well as trim work.
✓ Water leaks from the kitchen won’t be able to cause much damage.
✓ It allows for more flexibility when remodelling in the future.
However, installing the wall tiles after fitting the kitchen also comes with some advantages. Let’s have a look!
✓ This means less in square footage, but more time in both detail as well as trim work.
✓ The risk of damage to the wall tiles by other trades is significantly minimized.
✓ It’ll be easier to change the wall tiles later on without having to remove the kitchen.
Are you looking to tile your bathroom floor very soon? Well, we’ve got you covered! Tiling is not the easiest skill to acquire and definitely not one you’d want to try out on your bathroom without some practices. For the best results and to get it right the first time, we’d recommend you hire the services of a reliable professional especially if you’re inexperienced or without a bathroom tiling training. Hopefully, this quick step-by-step guide will put you in the right direction.
How To Lay Wall Tiles
Laying of wall tiles is a task that should be done with great caution, especially if you’re working on a tight budget. It is guided by its own unique set of rules which you do not dare to break if you wish to get it right the first time, and also to avoid incurring some additional costs. If you do not have a proper training or experience, laying of wall tiles is better left to a skilled professional for the best possible outcome. However, this guide will walk you through the various steps in the process to help improve your knowledge. Let’s get started!
lPrepare The Wall Surface
• Make sure the surface is clean, dry and smooth
• In wet areas, wall tiles should be fitted over a backer board
• If it’s a painted wall, ensure to sand the surface before installation.
lCreate The Layout
• Locate the centre of the wall
• Create an intersecting vertical and horizontal layout lines using a level
• Ensure to include spaces for grout joints when creating the layout.
lApply The Adhesive
• For wet areas, makes use of thin-set adhesive that’s cement-based.
• For dry areas, you can use pre-mixed mastic adhesive
• Follow the manufacturer’s instruction to prepare the adhesive
• Using a notched trowel, apply the adhesive (hold the trowel at about 45 degrees angle)
• Ensure not to cover the layout lines with the adhesive
lInstall The Tiles
• Follow the layout lines to install the wall tiles
• Place the full tiles firmly on the adhesive and twist slight and gently to make them fit.
• Use tile spacers to ensure constant gaps for grout joints.
lCut The Tiles
• After installation of the full tiles, there’ll most likely be a need to cut some tiles to fit.
• Cut the tiles with a wet saw or manual tile cutter
lGrout The Tile
• Ensure the adhesive is well dried and remove the tile spacers.
• Prepare the grout as instructed by the manufacturer.
• Use a rubber gloat to apply the grout.
• Remove the excess grout from the tile surfaces
• Wipe the tiles and joints gently using a grout sponge and clean water.
How To Take Tiles Off A Wall
The bonding agent or adhesive usually incorporated to hold a tile against the wall are always very strong or else you’ll find your tiles peeling off. As a result, to have them removed is not the easiest of tasks and bashing them with a hammer, will only have them broken leaving you with the task of having to scrape off the pieces. A better and much easier approach to removing tiles from a wall will be to pry them off one after the other. So how do you go about this? Let’s have a look!
lSafety First, Then Remove The First Tile
• Wear a protective eye goggle and gloves.
• Break up the grout around a tile located atthe wall’s centre using a putty knife and hammer.
• Place the putty knife under the the tile and gently it with the hammer.
lRemove The Remaining Tiles
• By tapping and prying using the tools - hammer and putty knife, wipe off all the tiles in the vertical row.
• Once done, continue to detaching the tiles in the adjacent rows until you’re able to open a wallboard section that’s around 12 inches wide and does not obstruct a stud.
• Use a keyhole blade to poke it through the wallboard.
• With the help of a reciprocating saw, cut out the wallboard’s section.
lCut The Fasteners
• Using a metal-cutting blade, cut te wallboard-holding fasteners. Make sure the fasteners holding the wallboard to the top and bottom plates of the wall are both detached.
lRemove All Wallboard Sections
• Using a similar approach, gently remove the other sections of the wallboard.
• Once completed, you can easily sweep the tiles’ broken pieces.
• Finally, vaccum the grout dust to ensure the work is neatly done.
If you lack a proper training or experience, taking off your tiles from a wall is best left to a skilled professional for the best results and to prevent potential damages which can lead to additional costs.
Answer a few quick questions to help us match you with the right Tiler
Receive no-obligation quotes from 4 Tilers working in Winchcombe.
Compare prices, customer reviews and services, and hire the right Tiler.
View our open Tiler jobs near you
Join today