Building work | Bricklaying
Dumbarton - G82
Enquiry from: M
Start Date: Immediate
Quote for new perimeter wall and removal of old one Please call to appoint
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For some conversions, the garage door is infilled and a solid wall with one or two windows is put into the front or side of the property.
This solid wall will need foundations or lintel supports which may or may not already be present under the existing door. Usually the window will not be a full width to match the existing garage door, so the new brickwork wall should take this into consideration. Depending on the current thickness of the exterior brickwork walls, they will likely require extra insulation. This is usually achieved by adding internal wall insulation like insulated plasterboard, or by adding another layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbour's property, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the home.
Unlike many ideas, a bricklayer actually does more than laying of bricks. There's more to being a bricklayer than you can most likely consider. A single bricklaying projects calls for a broad range of skills. Let's look at these skills!
This is not simply an cosmetic decision, as matching existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will give approximately four Bricklayers pros in your area, who will supply quotations for the work you desire done. You'll get a property visit from specialists in Dumbarton that'll assist you to choose the best Bricklayers for your home before performing the setup. Enter your postal code to start browsing currently.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Dumbarton in May 2025
Requests for Bricklayers quotations in Dumbarton in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in Dunbartonshire in May 2025. 0% change from April 2025.
Translating as 'fort of the Britons', Dumbarton is a town in West Dunbartonshire. It is on the north edge of the River Clyde where the River Leven encounters the Clyde estuary in Scotland. In the past, Dumbarton was the capital of the ancient Kingdom of Alclud, then the county town of Dunbartonshire, being a Royal burgh between 1222 and 1975. Dominating the town is Dumbarton Castle, situated at the top of Dumbarton Rock, which has a long history, recognised mainly for its significant role in the War of Independence by being the prison of William Wallace after his capture by the English. As a Scheduled Ancient Monument, Dumbarton Rock is legally protected from any sort of work happening on the rock, including forbiding such activities as rock climbing. Dumbarton was bombed on a large scale through the 2nd World War, as the German air force was targeting shipyards, with Clyde and Leven Street being profoundly affected. Decoy lights were routinely positioned on the Kilpatrick hills above the town and on storage tanks in the attempt to imitate those of the shipyards and to outwit the bombing planes, which had a reasonable degree of success. Despite the fact that Dumbarton was known for its shipbuilding, glassmaking and whisky production, the decline of these markets in the 20th century has meant that it is mainly a commuter town for its 20527 residents. The town is home to Dumbarton F.C., playing in the Scottish Professional Football League at Scottish Championship level. The Denny Civic Theatre is used by a number of regional groups, such as the Dumbarton People's Theatre who put on several performances. For all of your home upgrades, make sure to make use of reliable professionals in Dumbarton to make certain of quality.
Dumbarton - G82
Enquiry from: M
Start Date: Immediate
Quote for new perimeter wall and removal of old one Please call to appoint
Glasgow - G78
Enquiry from: Davie C
Start Date: Immediate
REQUIRE FRONT DOOR STEPS REBUILT
Glasgow - G43
Enquiry from: Linda A
Start Date: Immediate
Home Owner Brick wall to be demolished and Rebuilt Please call to appoint *
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Dumbarton.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
This is an individual who is trained in the art of working with concrete blocks or bricks, clay bricks as well as other kinds of mortar building materials. In a combination of these materials and good bricklaying skills, a bricklayer can build and repair veneer as well as full brick construction, arches, partitions and other structures.
Contrary to many beliefs, a bricklayer actually does more than laying of bricks. There’s more to being a bricklayer than you can probably think of. A single bricklaying projects requires a wide array of skills. Let’s have a look at these skills!
• Using damp resistant materials to seal foundations.
• Spreading mortar between joints and applying them to serve as a thick layer binding the bricks together in rows.
• Reading and working from specifications as well as plans.
• Working with brick-cutting machines.
• Taking charge and caring for cement blocks or bricks, clay bricks and the likes.
• Construction of scaffolding - subject to possession of some licenses in some states.
A bricklayer mostly works outdoors, in the field and may also work at heights. Depending on the job, a bricklayer can work as part of a team or be in contact with the public. They are mostly recruited by building and construction companies and bricklaying sub contractors. However, they can also set up their own private construction firm or become a self employed tradesperson.
A bricklaying qualification is one of just two construction trades which can continue to become a registered builder. And regardless of the form a bricklaying employment takes, there are certain qualities that makes a really good bricklayer. These includes:
• Ability to work at heights and outdoors
• Enjoy practical work
• Technical aptitude
• Good hand-eye coordination
• Independent and yet a team player too
• Top physical fitness
• Attitude and attendance.
Sand is a very important element in bricklaying as far as a mortar mix is concerned. Generally, the quality of the sand is the major factor determining the quality of a plaster mix or mortar mix. It’s recommended that the sand should have enough ‘fines’ (- 75 micron material) to get a good plastic mix with a water content that’s less than 350 litres/m3. Generally, a mortar mix or plaster mix is made within the range of one bag of cement to 200 to 300 litres of damp sand.
Apart from experience the next best indicator of the quality of sand is a field test. In other words, if you do not have the required training or experience in bricklaying, the best bet to determine the amount of sand for a good quality mix is by carrying out a field test. Let’s have a look!
• Get about 50kg of sand and air dry it.
• Scoop 25kg of the sand, 5 kg of cement as well as litres of water ( with 1 litre and 1.5 litres of the water in different containers).
• Mix the cement and sand to form a smooth, uniform and consistent colour.
• One after the other, mix the the sand - cement mixture in the three quantities of water. Do this until you’re able to achieve a mix that’s workable enough to use as plaster.
With that done, you should take note that if 5 litres of water is sufficient then the quality and quantity of the sand is perfect. If you’d require 6 litres of water to get a mix workable as a plaster, then both the quality and quantity of the sand is average. However, if you’d need 7 litres of water to get a mix workable as a plaster, then the quality of the sand is poor. Any requirement of water above 7 litres implies a very poor quality of sand.