Building work | Bricklaying
Holywell - CH8
Enquiry from: O
Start Date: Immediate
brick work to create enclosed porch.
Extensions will typically need brickwork of some form, either to infill the existing gaps or even to add insulation to existing brick walls. For most conversions, the garage door is infilled and a solid wall with one or two windows is added to the front or side of your home.
This solid wall will need foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, so the new brickwork wall will need to take this into account. Depending on the current thickness of the external brickwork walls, they'll require extra insulation. Normally, this is done with the addition of internal wall insulation like insulated plasterboard, or with the addition of an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if the walls are shared with a neighbour, the brickwork must comply with building regulations on sound proofing. With all brickwork on garage conversions, it's important to consider the existing brickwork of the house.
Unlike several beliefs, a bricklayer really does more than laying of bricks. There's more to being a bricklayer than you can probably consider. A solitary bricklaying tasks requires a broad array of abilities. Allow's take a look at these abilities!
This is not merely an cosmetic choice, as complementing existing brickwork might be a condition of planning permission or building regulations in your area. We will offer as much as four Bricklayers pros in your area, that will offer quotations for the work you want done. You'll get a property visit from experts in Holywell that'll aid you to choose the best Bricklayers for your residence prior to accomplishing the installation. Enter your postal code to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£600
£450
£300
£150
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Holywell in May 2025
Requests for Bricklayers quotations in Holywell in May 2025. 0% change from April 2025.
Requests for Bricklayers quotations in Clwyd in May 2025. 0% change from April 2025.
Holywell is the 5th largest community as well as a community in Flintshire, Wales. It lies to the west of the tidewater of the River Dee. The community consists of Greenfield. The marketplace community of Holywell takes its name from the St Winefride's Well, a holy well bordered by a chapel. The well has been known considering that a minimum of the Roman duration. It has actually been a site of Christian expedition because about 660, dedicated to Saint Winefride who, according to legend, was beheaded there by Caradog who tried to assault her. The well is one of the Seven Wonders of Wales and the community expenses itself as The Lourdes of Wales. Numerous explorers from around the globe continue to see Holywell as well as the Well. Administratively, Holywell town includes 3 wards of the Flintshire Area Council regional authority. At the 2001 Census, the overall population of the community was 5,974 with the adjoining villages including Greenfield, Whitford and Carmel the population of the location is over 15,000.
Holywell - CH8
Enquiry from: O
Start Date: Immediate
brick work to create enclosed porch.
Ellesmere Port - CH66
Enquiry from: Nayde M
Start Date: Immediate
Garden wall for back garden.
Neston - CH64
Enquiry from: Philip J
Start Date: Immediate
We have a single story extension that requires approx 8 coping stones going on top of a staggered wall. Would you be interesting in coming to have a look and give us a price? Thanks
Ellesmere Port - CH65
Enquiry from: Debbie A
Start Date: Immediate
repointing to part of small semi detached house how much work would you say needs to be done: lots of work property type: commercial
Chester - CH4
Enquiry from: Stuart F
Start Date: Immediate
we have a 20m existing brick wall in our garden and wish to extend it upwards using reclaimed bricks. are you the property owner: owner of the property property type: detached how much work would you ...
Ellesmere Port - CH66
Enquiry from: Steve M
Start Date: Immediate
garage conversion : at stage where the exising garage door area requires block, brickwork and window etc. approx size of opening 2.5m x 4.0m are you the property owner: owner of the property how much ...
Neston - CH64
Enquiry from: David E
Start Date: Immediate
prop up flat roof, remove wooden supports and cladding. build blockwork wall 10m up to support roof from existing concrete base. render outside. are you the property owner: owner of the property pro...
Abergele - LL22
Enquiry from: Allan D
Start Date: 1 to 3 months
Existing 40ft long 2ft high double leaf wall. Remove top courses of bricks and rebuild to 3ft high with '2 brick by 2 brick' columns 8ft high spaced every 6ft for the installation of 6ft by 5ft close ...
Deeside - CH5
Enquiry from: BEVERLEY G
Start Date: Immediate
Brick steps to the front of house to be removed and rebuilt
Chester - CH4
Enquiry from: Vicky H
Start Date: Immediate
Require quotes to build a garden wall 6ft high / 14.5 ft length. Double skin and remove existing fencing pannels. All materials required. Home owner Please call to appoint
Buckley, Mold - CH7
Enquiry from: G H
Start Date: Immediate
Home owner Build a small break wall around the front of the property Time scale 3-6months Contact to Appoint *
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Holywell.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Are you about to start a new construction job when it’s a heavily rainy period? Or perhaps you’re just interested in knowing how bricklayers work. Well regardless of your purpose, one thing you should know is laying of bricks has a few rules and one of them is not to lay a brick wall when its raining. This is mainly because your structure’s quality and integrity would be heavily compromised if water comes in contact with the mortar before it gets the time to dry. However, with the help of a concrete protective tent, you can prevent water from coming in contact and damaging the mortar. So let’s look at the procedures to follow to work in the rain!
lDetermine The Concrete Protective Tents Required
• Concrete protective tents come in various sizes so you have to know what’s required to get the job done.
• Firstly, calculate the amount of space required to lay the brick wall
• Then, incorporate the appropriate size and number of tents.
lSet Up The Tents
• Follow the manufacturer’s instruction to set up the tents
• Once installed, the tent should extend past the location for the bricklaying and slope downwards.
l Access The Area
• Inspect the location during rainfall to ensure water is not sneaking through.
lBuild a Lumber Frame
• Use 2 to 4 pieces of lumber to build a frame.
• Set it into the ground depending on the size of your wall
lApply Concrete or Mortar
• Fill up the frame with either concrete or mortar.
• Follow the manufacturer’s instruction to allow the mixture to cure.
lPrepare the Brick Wall’s Mortar
• Mix the mortar for the brick wall construction
• Follow the manufacturer’s instruction for the process.
When you’re done laying the bricks, you can remove the protective tents once you’re certain the rain has stopped. Exposure to sun and air will speed up the curing process, which is quite important to protect the integrity of your structure.
Laying of bricks is a skilful trade which requires the bricklayer to fully understand the process involved in the required building material preparation necessary to construct a foundation as well as to mix the concrete or mortar. As a tradesperson, you also need to fully comprehend how to make use of various materials and master the art of shaping, polishing and cutting it. A typical bricklaying endeavour is expected to include different activities such as preparation of the surface, assembly, installation, reinforcement as well as repair.
As a result, every aspect of the job demands an in depth and extensive knowledge, skills and also experience. To get started in this career path, you can also consider getting a bricklaying license as this will stand you out from the lots from your customer’s point of view. However, to obtain a bricklaying license, you’ll need to have some qualifications which includes an industry experience in the field as well as a trade certificate. These formal and nationally recognized qualifications can be gotten through the Recognition of Prior Learning.
It must, however, be said that several states will require either a building practitioner registration or a bricklaying license to enable you practice as a professional bricklayer in order to ensure that the national standards for quality is always met. In other states, a bricklayer must meet some certain registration requirements or possess concrete licenses. Some will necessitate that you register as a building practitioner to take on certain projects but only to a particular level.
Overall, a bricklaying license will help you meet the building commission’s requirements so as to avoid stern punishments like fines and sanctions. It also allows you to sign legal contracts and agreements, market your services and lots more to steer ahead of competition in the industry.
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today