Building work | Bricklaying
Beverley - HU17
Enquiry from: David S
Start Date: Immediate
Lay approx 40 mtrs of Pin curb prior to gravelling driveway.Pin curb laying only will supply materials labour only
Extensions will usually demand brickwork of some form, either to infill the existing gaps or to add insulation to pre-existing brick walls. For many conversions, the garage door is infilled and a solid wall with a couple of windows is put into the front or side of the house.
This solid wall requires foundations or lintel supports which might or might not already be present under the existing door. Often the window will not be a full width to match the existing garage door, therefore the new brickwork wall will need to take this into account. Depending on the current thickness of the exterior brickwork walls, they might require additional insulation. This is usually done with the addition of interior wall insulation like insulated plasterboard, or by adding an additional layer of brickwork to make a cavity wall. These options are again dependent on the existing garage foundations. Furthermore, if any of the walls are shared with a neighbouring property, the brickwork will have to comply with building regulations on sound proofing. With all brickwork on garage conversions, it is important to take into account the existing brickwork of the home.
As opposed to numerous beliefs, a bricklayer really does more than laying of blocks. There's more to being a bricklayer than you can possibly think of. A single bricklaying jobs calls for a wide selection of abilities. Let's look at these skills!
This is not just an visual choice, as complementing existing brickwork is potentially a requirement of planning permission or building regulations in your area. We will offer as much as 4 Bricklayers pros locally, who will certainly provide quotations for the work you desire done. You'll receive a property visit from professionals in Yorkshire & Humber that'll aid you to select the best Bricklayers for your home prior to performing the installment. Enter your postal code to start searching now.
The common cost of Bricklayers is £400. Costs fluctuate based on the materials and the tradesman chosen. The upper price range can be as high as £460. The material costs are in general around £100
Avg. price low | Avg. price low |
---|---|
Avg. price | Avg. price |
Avg. price high | Avg. price high |
£5800
£4350
£2900
£1450
£0
Labour cost | £280 | |
Material cost | £100 | |
Waste removal | £20 |
Requests for quotations in Yorkshire & Humber in April 2025
Requests for Bricklayers quotations in Yorkshire & Humber in April 2025. 0% change from March 2025.
Requests for Bricklayers quotations in United Kingdom in April 2025. 0% change from March 2025.
Beverley - HU17
Enquiry from: David S
Start Date: Immediate
Lay approx 40 mtrs of Pin curb prior to gravelling driveway.Pin curb laying only will supply materials labour only
Goole - DN14
Enquiry from: Neeraj M
Start Date: Immediate
6 ft high. the dates are 3.7 mtr in length. I need 4 pillars - 2 for drivw way and 2 for front. priority is driveway atm. I can provide you the bricks if you can tell me how many bricks will be needed...
Grimsby - DN37
Enquiry from: Margaret A
Start Date: Immediate
Need a garden wall after hedge removal - approx 8 mtrs acroo and 0.75 mts deep. Can you quote? Please email do not phone as hearing issue post surgery.
Harrogate - HG2
Enquiry from: Chris G
Start Date: 1 to 3 months
customer in harrogate area has requested that we arrange quotes for their bricklaying project.they are considering various options and would like to discuss with a builder directly.please call to disc...
Leeds - LS26
Enquiry from: Stuart B
Start Date: 1 to 3 months
customer made an enquiry for bricklaying and confirmed on the quotatis site they would like quotes from a builder.mr lives in the leeds area and would like a call to discuss options.see below details ...
Malton - YO17
Enquiry from: Charlie O
Start Date: Immediate
2 cracked patio slabs need replacing. photo available. property type: other how much work would you say needs to be done: minor works do you require the bricks to be supplied too: yes are you the pro...
Bradford - BD10
Enquiry from: Heather S
Start Date: 1 to 3 months
mrs requested quotes for bricklaying from a builder around bradford. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below is wh...
Barnsley - S70
Enquiry from: Robert C
Start Date: Immediate
small garden wall down drive
Normanton - WF6
Enquiry from: Graham T
Start Date: Immediate
i need concrete bases for 1 or 2 sheds, 12' by 8' and 8' by 6', with a trench leading from the house (30ft away) to carry pipes and electrical cables. i also need a couple of l-shaped retaining walls,...
Sheffield - S26
Enquiry from: Catherine M
Start Date: Immediate
it's a guess but i think the lintels have stopped load bearing on at least three possibly 4 windows. the lintels would need replacing and the brick work around them replacing/repairing/repointing. ar...
Hartlepool - TS26
Enquiry from: Sarah D
Start Date: Immediate
new front garden wall we will be knocking the old wall down we have all the bricks ready job will be ready to go are you the property owner: owner of the property property type: semi detached how much...
Dewsbury - WF12
Enquiry from: Irfan P
Start Date: Immediate
i want to learn quick ways bricklaying are you the property owner: owner of the property property type: terrace how much work would you say needs to be done: lots of work do you require the bricks to ...
Wakefield - WF4
Enquiry from: Don B
Start Date: Less than one month
replace chimney cement cap and some pointing. property is bungalow are you the property owner: owner of the property property type: semi detached what type of work do you need to have done: roof work,...
Scunthorpe - DN17
Enquiry from: Teresa T
Start Date: Immediate
i need one of my driveway posts moving to widen my drive then a bit of cementing down the grass side are you the property owner: relative of owner property type: other how much work would you say need...
Pudsey - LS28
Enquiry from: Pete W
Start Date: Immediate
Repair *** length of boundary wall that has been damaged by vehicle
Barnsley - S71
Enquiry from: Karen G
Start Date: Immediate
to knock out and make safe for in wall electric fire. the electric work is done.think it will need a lentil and som brick work. are you the property owner: owner of the property property type: semi d...
Dewsbury - WF12
Enquiry from: Mohamed A
Start Date: Immediate
lean to on right side of semi detached ( double walls 1 brick 1 block with insulation between ) 10m long x 2m wide x 2.3m height - 3 0r 4 windows along with 2 dividing walls in side. in the rear 2m x...
Sheffield - S6
Enquiry from: Nagore O
Start Date: Immediate
hi! we were wondering if you can come and do a small job in our drive. we had a small car accident and some brick felt from a wall. it needs rebuilding. we are 167 dykes hall road. please let us know....
Stockton-on-tees - TS17
Enquiry from: Dawn S
Start Date: Immediate
looks like it needs pointing all round are you the property owner: owner of the property property type: detached how much work would you say needs to be done: medium job do you require the bricks to b...
York - YO30
Enquiry from: Mark M
Start Date: Immediate
1) part of my back garden brick wall needs correcting. the last tradesman did a terrible job and was not honest about his bricklaying abilities. part of it needs taking down and correcting. then i wan...
Answer a few quick questions, so we can match you with local builders who can help.
Get free, no-obligation local bricklayers quotes from 4 verified builders working in Yorkshire & Humber.
Compare customer reviews, services and prices, and choose the right tradesperson for you.
Would highly recommend, they found me a firm which I was happy with a quote they give me and went ahead and had my job done within 2 days of enquiring.
Good easy way to find a selection of trades you need all in one place.
Love LeadsDoWork it's a big part of my Business I would recommend to anyone
Do you want your house to be built using brick? Or perhaps you just require the professional services of a bricklayer. Regardless of your bricklaying needs, the cost charged depends on each job as every job is unique. Bricklayers generally look at each task individually and charges based on the complexity of each. We’ve put together this guide to give you an idea of the costs charged by bricklayers. Let’s have a look!
Generally, bricklayers charge either based on a daily rate or a fixed price for a particular amount of bricks ( usually a thousand bricks or 10 - 12 metres square). On the average, an experienced bricklayer can charge within a range of £150 to £200 daily rate and if a labour is needed for the job, an additional £60 to £100 may be included to get the job completed in a quick and fast manner. If the quoting is done based on the number of bricks to be incorporated, then a thousand bricks will be quoted in between £350 to £450 which should be completed in a couple of days.
You should however take note that most times, the bricklayer’s cost will depend on the amount of work involved in the project. As a result, a more tedious and challenging project will most definitely cost more than a simpler one. Examples of some difficult projects that’s likely to cost more are hard to reach areas, difficult sites as well as second storeys which are considered to be more challenging than single storey buildings. What’s more? The complexity of the project is also a great cost factor. While some projects are basically direct and straightforward, others involve curves and more complex designs which will ultimately make the cost jump up.
Cement is a crucial element in bricklaying that’s widely used in both construction as well as finishing works. Generally, they’re used to aerate concrete blocks, connect bricks, prepare plaster, floor levelling as well as the making of precast products. The major reason cement is one of the most common construction materials as its incredible ability to hold structure together. To get a cement plaster, you’d simply have to mix cement with both water and sand. However, when you mix cement with lime, sand and water, you’ll get a mortar.
For cements mortars to be used inside joints, you’ll have to include 1 part cement at the minimum to not more than 2 parts sand by weight which should be dry mixed and moistened with enough water to allow for troweling and packing without falling apart. Generally, the cement sand ratio in a mortar is in between 1:2 to 1:6. The cement and sand mix ratio is largely based on the importance of the project.
Cement provides a plethora of uses in bricklaying and these includes:
• Preparation of cement concrete
• Preparation of cement mortar
• Building fireproof and thermal proof structures
• Building chemical proof structures
• Serving as a grout material
• Building hydrographic and frost resistant structures
• Manufacturing precast members
• Constructing aesthetic concrete
• Constructing cement concrete roads
There are several types of cements with each having its specific purpose. For instance, the type of cement more suited to building a fire proof structure is a high alumnia cement and to build a hydrographic structure, cements like expanding cement, hydrophobic cement, pozzolana cement and quick setting cement are the best bet. Acid resistant cements are more useful in building chemical proof structures, portland cements are best suited to making grout materials, while coloured cements are preferable to building aesthetic structures.
When it comes to laying of bricks, it is essential to get the right mortar mix. It is vital, be it for construction or maintenance projects, so far mortar is required. There are several materials incorporated in getting mortar which includes both cement and sharp sand, soft sand or plasterer’s sand and lots more. Here, we are going to look at the right ratio for cement and sand mix in bricklaying.
Cement include ingredients such as iron, aluminium, as well as silicon and it is mainly used for mortars like aerated cement mortar, Portland cement mortar and gauged mortar. Sand, on the other hand, comes in different forms such as sharp sand, soft sand and plasterer’s sand. The sharp sand consists of a larger grain size than the others and is usually incorporated in the construction areas that requires more strength as well as flexibility. Soft sand is the most common one used in mortar and it’s also referred to as bricklayers’ sand. These are used to make all types of mortar. Finally the plasterer’s sand which neither has the sharp sand’s coarseness nor the fineness of the soft sand, but can also be used for any form of mortar.
Cement and sand mortar is used for a plethora of bricklaying jobs serving as a glue for bricks, walls and pillars, while also repairing or maintaining old listed buildings. The preferred ratio here is 1:3 to 1:5 of cement and building sand. Meanwhile, to get a sand cement mix, essential materials that are required includes water, soft building sand as well as cement. However, you must also note that a sand and cement mortar is not used for structural projects, rather a concrete ratio is used.
Well, just like many other team work, a bricklayer is only as good as his supporting cast. And a hard-working labourer should be able to keep three bricklayer gangs happy. But even when he gets to serve just one bricklayer, the site conditions and nature of the wall can also play a huge role in determining the number of bricks that can be laid within 24 hours.
With the best possible site condition, hard-working labourer and best scenario with no pillars, no face brick, long straight wall and no wall ties, a well trained bricklayer should be able to lay within a range of 800 to 1100 bricks all day long. However, you rarely get walls like this as there is always going to be some corner or curve somewhere which usually takes some time to get right. Furthermore, once the bricklayer has laid up to 5 feet, there’ll be a need to get some lift. From that point onwards, the job understandably gets slower and tougher - meaning there’ll most definitely be a face brick.
In addition, there are multiple other factors that can affect the number of bricks that can be laid in a day. Sometimes its the complex designs or weather that’ll determine the daily rate.
With the aforementioned factors and more realistically, on a good day and great site, an expert bricklayer should be able to lay about 500 to 800 bricks in a day. This is generally a very good target, but of course you never can tell with the reasons above and other factors that are simply beyond the control of the bricklayer. If you have a project and want it completed as soon as possible, you can pay the bricklayers based on the number of bricks laid to increase their efficiency.
We can help you get more bricklayers work with our qualified job leads and boost your business.
Join today