- Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
- Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
- Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
- Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
Bishopton
Bishopton is a town in Renfrewshire, Scotland. It lies around 2 miles (3.2 kilometres) west of Erskine. In 2005, BAE Systems and also Redrow sent propositions to make use of a huge part of the site for constructing new housing which would certainly, at least, double the dimension of Bishopton. Local residents showed their problem at the propositions; the significant problems they had were with the size of the growth-- with the associated ripple effects to the local facilities-- and worries of the contamination that was likely to be located on the site. In December 2008 Renfrewshire Council approved summary preparation approval for the development as well as thorough planning approval for an associated motorway junction off the A8/M8. By very early 2016, adhering to comprehensive decontamination work, a substantial portion of the development had been finished, with a number of your houses (the complete variety of residences having risen from 2,500 in 2008 to 4,000 in 2019, including numerous housebuilder) developed and also lived in together with some buying centers. Nonetheless, a brand-new primary school which was initially approved in 2009 had still not been completed a years on and was reassessed to be integrated in 2021 with fresh concerns over the recommended catchment area possibly bring about department between the old and brand-new areas in the location, which the school would merely be as well tiny to handle the continuous increase of youngsters, with the majority of the Dargavel housing being marketed for young households to relocate there.