- Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
- Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
- Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
- Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
Garve
Garve is a village on the Black Water river, in Ross-shire, as well as is in the Highland Council area of Scotland. It is positioned 5 miles (8 km) northwest of Contin, on the A835, the highway to Ullapool on the west shore, close to where the A832 branches off towards Achnasheen. The town is served by the Garve train station, on the Kyle of Lochalsh Line, which goes across the A835 road on a degree crossing. In 1890 Garve was recommended as the starting-point of a train to Ullapool. The town has a primary school and hotel yet no shop. The town is within the Garve as well as District Community Council area. Garve and also District are offered by the Garve and District Development Company, a company developed by the area during 2017.