- Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
- Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
- Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
- Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
Girvan
Girvan is a burgh in Carrick, South Ayrshire, Scotland. Girvan is located on the east coastline of the Firth of Clyde, with a population of regarding 6,700. It exists 21 miles (34 km) south of Ayr, as well as 29 miles (47 km) north of Stranraer, the primary ferry port from Scotland to Northern Ireland. Girvan was initially a fishing port. In 1668, it became a metropolitan burgh included by charter.