Find a Carpenter you can trust in South Molton.

Choose from 74 Carpenters, all rated by people like you.

Over 96 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 50 Reviews

First Choice

65 review(s)
Offers services in SOUTH MOLTON
A business with customer satisfaction guaranteed, we aim to please with our workmanship, good reliable company. No job to ...
Verified Pro

First choice drives and patios

0 review(s)
Offers services in SOUTH MOLTON
Here at first choice drives and patios we offer a wide ranges of finishes and the possibility’s are limitless we aim to im...
Verified Pro

Dymond finish

0 review(s)
Offers services in SOUTH MOLTON
Hi I'm sam here at dymond finish we offer a professional and clean finish to all works carried out, we pride ourselves in ...

Recent Carpenter Enquiries

06 Apr

Carpentry

South Molton - EX36

Enquiry from: Christine B

Start Date: Immediate

Hello I am looking for someone to renovate a singer sewing table I have ( it’s in good condition ) do you know anyone please ? Thank you Christine

Post a similar request >

18 Feb

Carpentry

South Molton - EX36

Enquiry from: Nicky B

Start Date: Immediate

we would like 4 doors replaced in our home would like a quote please. thank you for your time

Post a similar request >

20 Jun

Garden | Decking

South Molton - EX36

Enquiry from: Lynne O

Start Date: 1 to 3 months

Property Type: Detached Time scale: 1-3 months Other Forms: None Please call to appoint

Post a similar request >

19 Jul

Carpentry

Barnstaple - EX32

Enquiry from: Liam D

Start Date: Immediate

Hi I was wondering if you would like to take an hard working apprentice

Post a similar request >

06 Mar

Carpentry

Barnstaple - EX32

Enquiry from: Peter Y

Start Date: Immediate

Following a fire risk assessment our 1950s built property that we holiday let needs all it's internal doors replaced with doors that comply with fire retardent regs. Plus a sliding door needs to be re...

Post a similar request >

25 Jan

Garden | Decking

Tiverton - EX16

Enquiry from: Debi W

Start Date: Immediate

customer in tiverton areas is looking to do a couple of projects at the moment, and would like quotes for wooden decking.confirmed interest via email at 25/01/2024 13:05.please call to arrange appoint...

Post a similar request >

09 Jan

Garden | Decking

Tiverton - EX16

Enquiry from: Kevin M

Start Date: Immediate

small tree removed from front garden, hedge trimmed, patio jet washed and general clear up of back garden are you the property owner: owner property type: semi detached do you have a: extra large gard...

Post a similar request >

01 Nov

Carpentry

Barnstaple - EX32

Enquiry from: Zara R

Start Date: Immediate

Hi there I wonder if you would be able to help. We have an indoor stair / door guard that we could do with being made a little bigger - if you're able to help with this kind of thing? The it...

Post a similar request >

14 Sep

Garden | Sheds

Crediton - EX17

Enquiry from: Keith F

Start Date: Immediate

two sheds in good condition removing to good home and maybe small terrrace laying are you the property owner: owner of the property do you have a: small garden what level of service are you looking fo...

Post a similar request >

19 Aug

Carpentry

Barnstaple - EX31

Enquiry from: Nimmy M

Start Date: Immediate

Remove an existing kitchen cupboard for the purpose of fitting a a dishwasher.

Post a similar request >

08 Jun

Garden | Decking

Tiverton - EX16

Enquiry from: JAMIE M

Start Date: Immediate

hi please can we have the grass cut, the fence potentially repainted and cleaned, weeds pulled up and controlled and the drive and outside of the house cleared and decking cleared. please could we arr...

Post a similar request >

17 Mar

Carpentry

Tiverton - EX16

Enquiry from: Christopher R

Start Date: 1 to 3 months

stuck drawer sorting out & new doorstep making for garage are you the property owner: owner of the property property type: detached what type of job are you looking to have done: wooden window/doors ...

Post a similar request >

12 Nov

Garden | Decking

Tiverton - EX16

Enquiry from: Shaun D

Start Date: Immediate

decking needs replacing and addition poles inserted so fence can be installed, also require one side to be lapped fenced are you the property owner: owner of the property property type: semi detached ...

Post a similar request >

20 May

Garden | Decking

Tiverton - EX16

Enquiry from: Dolores S

Start Date: Immediate

mrs requested quotes for wooden decking from a landscaper around tiverton. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information below...

Post a similar request >

13 May

Garden | Sheds

Tiverton - EX16

Enquiry from: Richard G

Start Date: Immediate

erection of 10 * 6 shed. the base is already prepared. are you the property owner: owner of the property what level of service are you looking for: install do you have a: large garden please call to ...

Post a similar request >

26 Apr

Garden | Sheds

Tiverton - EX16

Enquiry from: Claire R

Start Date: Immediate

basic shed to fit cycle, mower and small amount of furniture. are you the property owner: owner of the property do you have a: small garden what level of service are you looking for: supply, install ...

Post a similar request >

05 Jul

Garden | Decking

Barnstaple - EX32

Enquiry from: Natasha C

Start Date: Immediate

Raised decking approx 2.5 met width by 4 met length approx 2ft from ground running from bifold doors

Post a similar request >

27 Apr

Carpentry

Tiverton - EX16

Enquiry from: Martyn T

Start Date: Immediate

I have 8 new internal doors that require hanging. I have the doors, handles and hinges etc just need a price and your availability please. Thank you

Post a similar request >

20 Nov

Kitchen | Fitting

Barnstaple - EX31

Enquiry from: Michelle W

Start Date: Immediate

Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: unsure, Property type: Other, Work description: fit two double floor units, one double wall unit, one single f...

Post a similar request >

10 Apr

Garden | Decking

Barnstaple - EX32

Enquiry from: John P

Start Date: 1 to 3 months

Require existing decking with balustrade to be replaced with flat decking covering larger area. Are you the property owner: Owner of the property Property Type: Detached Roughly the size of your gar...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in South Molton is:

£943

Carpenter job Carpenter cost in 2025
Kitchen Fitting in South Molton £975-£2,495
Carpenters and joiners in South Molton £375-£575
Plasterboard dry lining in South Molton £638-£978
Wood flooring in South Molton £750-£1,150
Wooden decking in South Molton £1,125-£1,725
Garden shed in South Molton £475-£1,595
Wooden window repair in South Molton £320-£480

Related Carpenter searches in South Molton

Carpenter FAQs

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How much plasterboard do I need?

How Much Plasterboard Do I Need?

Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!

lTake Square Footage Measurement

• Measure the square footage of the area where the plasterboard will be fitted.

• Multiply the height by the width of each wall or ceiling area.

• Add all quantities to obtain a total square-foot amount.

lCalculate Drywall Sheets

• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.

• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).

• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.

We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.

How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

What is plasterboard?

What Is Plasterboard?

The plasterboard is unarguably one of the most common building materials across the globe. Sometimes referred to as gypsum board, gyprock, drywall or wall board, the plasterboard is mostly incorporated for ceiling cladding and interior walls in several homes and offices in recent times. However, despite its global acceptability, it’s a very misunderstood building material.

The plasterboard is manufactured using a gypsum core with a heavy paper covering both sides of the sheet. The measurement of a standard plasterboard sheet is a length of 2.4 metres in and a width of 1.2 metres, with a thickness of about 13mm. The board usually have either a bevelled or a bit flat edge. The bevelled edge makes it easy for the installers to use a plaster to smooth out the surface after nailing the sheets to walls and ceilings as well as taping the edges.

The plasterboard comes in different types. Although various manufacturers provide a unique name for their products, but they’re all included in one of the following categories:

• Water Resistant Plasterboard - This type of plasterboard are best suited to be used in water areas like bathroom, laundry rooms and kitchens.

• Acoustic Plasterboard - Due to its sounding proofing qualities, this type of plasterboard is preferred to be used in home theatres or noisy areas.

• Flexible Plasterboard - This is to be incorporated on curvy surfaces.

• Fire Resistant Plasterboard - Just like the name implies, this type of plasterboard is best suited for use in high fire hazard areas.

If you’re about to kick start some small renovations around your house or office, using a plasterboard to clad your walls is a very simple and worthwhile task. However, if you want to do major renovations or need to apply plasterboard to your ceiling, the best option would be to leave it to a seasoned professional.

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in South Molton.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in South Molton?

View our open Carpenter jobs near you

Join today
View Shortlist