Garden | Sheds
Yelverton - PL20
Enquiry from: Judith D
Start Date: Immediate
I would like a base prepared for a new garden shed. I have paving slabs but the ground area needs flattening out.
Over 101 reviews & an average rating of 4.6/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Yelverton - PL20
Enquiry from: Judith D
Start Date: Immediate
I would like a base prepared for a new garden shed. I have paving slabs but the ground area needs flattening out.
Yelverton - PL20
Enquiry from: Tessa T
Start Date: Immediate
Repairs to dovecote repairs to dovecote
Yelverton - PL20
Enquiry from: Alan S
Start Date: Immediate
existing shed roof needs recoating xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx xx size 3m by 3m
Yelverton - PL20
Enquiry from: Kim S
Start Date: Immediate
Repairs to Oak conservatory
Yelverton - PL20
Enquiry from: Pat R
Start Date: Immediate
Customer visited the myflooringprices.co.uk site and submitted an enquiry. Property owner: Owner, Work description: bamboo flooring installed Are you the property owner: Owner of the property How ...
Yelverton - PL20
Enquiry from: H P
Start Date: Immediate
Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 12x12, Property type: House, Work description: Installation of kitchen with extra electric sockets and floor t...
Plymouth - PL9
Enquiry from: Julie H
Start Date: Immediate
A frame built around a wood burner to put up electric wall fire
Plymouth - PL6
Enquiry from: Judith B
Start Date: Immediate
Oak flooring in lounge diner + remodelling of stair case in possible oak with glass panelling
Buckfastleigh - TQ11
Enquiry from: Maria C
Start Date: Immediate
Decking needs replacing in an area approx 3m x5m
Torpoint - PL11
Enquiry from: Christine G
Start Date: Immediate
Repair or replace decking
Saltash - PL12
Enquiry from: Nicola H
Start Date: Immediate
wooden decking replaced front and back of house 35 beatrice avenue saltash are you the property owner: owner of the property property type: terrace what level of service do you require: supply and dec...
Saltash - PL12
Enquiry from: Hazel F
Start Date: Immediate
2 B&Q kitchen cabinets with pull out tray storage. Plus beech worktop All parts paid for
Plymouth - PL5
Enquiry from: Mike D
Start Date: Immediate
i need a kitchen worktop around my sink fitted as it has become water damaged. i already have the work top replacement stored, it just needs to be cut to size and fitted and sealed. are you the prope...
Saltash - PL12
Enquiry from: Evelyn B
Start Date: 1 to 3 months
several jobs needed- 1) curtain pole put up over patio doors. 2) wooden porch frame and front door restored and door furniture replaced- at the moment some pieces of frame timber need replacing , doo...
Buckfastleigh - TQ11
Enquiry from: Ben M
Start Date: Immediate
Hi, my father in law needs a quote for new windows around his house. It’s a listed cottage so the windows need to match two existing styles.
Ivybridge - PL21
Enquiry from: Dawn M
Start Date: Immediate
Removing and Rebuilding to a wooden corner box and fitting a pine wooden top in a bedroom. Approx 140x60 cm in size. I can send a photo of space .
Torpoint - PL11
Enquiry from: Hannah S
Start Date: Immediate
New stairs or renovation.
Plymouth - PL7
Enquiry from: David P
Start Date: Immediate
Need to doors internal to be put up one a fire door six panel and one 6 panel bedroom door
Ivybridge - PL21
Enquiry from: William C
Start Date: Immediate
Hello, interested in removing a stud wall dividing kitchen from living room. There is a wooden staircase attached to the wall which may need alterations or replacing. Not urgent work, interested in do...
Ivybridge - PL21
Enquiry from: Brian L
Start Date: Immediate
Hi Paul, I want to replace my kitchen worktops, also replace the ceramic floor tiles with LVT flooring. Advise on option i.e. click or glue down would be appreciated. I'm not looking to do this until...
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Yelverton | £975-£2,495 |
| Carpenters and joiners in Yelverton | £375-£575 |
| Plasterboard dry lining in Yelverton | £638-£978 |
| Wood flooring in Yelverton | £750-£1,150 |
| Wooden decking in Yelverton | £1,125-£1,725 |
| Garden shed in Yelverton | £450-£690 |
| Wooden window repair in Yelverton | £320-£480 |
Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.
First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).
After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.
In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.
It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
If your deck isn’t going to be flat to the ground, it’s a good idea to have some kind of balustrade to avoid any tripping. If the gap between the deck and the ground is less than 600mm, use a 900mm balustrade. If it’s higher than 600mm, the balustrade should be 1100mm tall.
Cutting a plasterboard is a relatively simple process requiring only some basic tools. Unfortunately, the lack of knowledge serves as big deterrent for many people who wishes to put it to good use. Plasterboard can actually be sawn using an ordinary timber saw that’s fine-toothed to get a cleaner edge. However, the basic tools you may also need includes a sharp knife (Stanley Knife), pencil, a fine sandpaper, a straight edge and measurement tape as well as a wall board saw. Let’s have a look at the cutting process!
• Firstly, you need to put the plasterboard sheet flat on a firm surface.
• Use the tape measurement to measure the cut you wish to make.
• With the help of a pencil, simply mark out the part you wish to cut on the plasterboard’s front side.
• Once marked, place a spirited level over the marked spot on the plasterboard sheet you want to cut.
• Cut a shallow mark into the plasterboard sheet using the Stanley Knife to cut along the edge.
• The cut should be slow and gradual to ensure you do not wander off the edge of the marked area.
• Once the shallow cut has been made, turn the plasterboard sheet on its edge and deliver a quick and sharp push towards the plasterboard’s back and on one side of the cut.
• Place the plasterboard sheet backing against a flat surface ensuring the line of the cut is over an edge. Once done, give a quick and sharp push towards the back of the plasterboard sheet and on the part of the board is reaches beyond the edge.
• Using a fine sandpaper, remove all forms of paper burrs.
The process of cutting plasterboard requires a lot of practice. If you lack the training and experience, the cutting process is best left to a proficient professional who can guarantee the best results the first time and save you some additional costs due to potential damages.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Yelverton.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today