Find a Carpenter you can trust in South Ockendon.

Choose from 358 Carpenters, all rated by people like you.

Over 398 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified ProOver 20 Reviews

Thomas Roof Restoration

25 review(s)
Offers services in SOUTH OCKENDON
Thomas Roof Restoration are proud to work on your property as if it were their own. Based in Canterbury, covering Kent, So...
Verified ProOver 10 Reviews

Stoneartuk

14 review(s)
Offers services in SOUTH OCKENDON
Hi my name is Martin from stone art uk ltd we are a local run landscaping company within the Pinner area we specialise in ...
Verified ProOver 10 Reviews
we Are a family run business with over 30 years experience built on reputation Our services include all types of roofing...
Verified ProOver 10 Reviews
Welcome to Home Counties, our team handle projects large and small from residential to commercial. Our Driveway service...
Verified Pro

Controlled Airflow Services

0 review(s)
Offers services in SOUTH OCKENDON
We are a small, family run business with 10 years experience in the industry and specialise in all aspects of air conditio...
Verified Pro

Jm2TilingCo

0 review(s)
Offers services in SOUTH OCKENDON
Here at Jm2TilingCo standards are kept to the absolute highest level. I will always leave a job clean and well done, plus ...

Recent Carpenter Enquiries

15 May

Garden | Decking

South Ockendon - RM15

Enquiry from: Keith M

Start Date: Immediate

I am looking to have a small deck installed, ideally made from composite materials for durability and low maintenance. The area I would like it fitted is approximately 5 feet by 5 feet. Please let me ...

Post a similar request >

27 Mar

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

Shed roof repair Replacement of existing roof damaged. Damaged over head woods frames. Fence gate repairs.

Post a similar request >

26 Feb

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

Shed roof repair Replacement of existing roof damaged. Damaged over head woods frames. Fence gate repairs.

Post a similar request >

11 Mar

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

property type: terrace roof type: flat, work description: loft conversion roof leak & shed roof needs repairs are you the property owner: owner of the property location of roof: extension, other prop...

Post a similar request >

02 Mar

Garden | Sheds

South Ockendon - RM15

Enquiry from: Richard O

Start Date: Immediate

property type: terrace roof type: flat, work description: loft conversion roof leak & shed roof needs repairs are you the property owner: owner of the property location of roof: extension, other prop...

Post a similar request >

30 Mar

Garden | Sheds

South Ockendon - RM15

Enquiry from: Isis Z

Start Date: Immediate

customer in south ockendon areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 30/03/2021 15:07.please call to arra...

Post a similar request >

28 May

Kitchen | Fitting

South Ockendon - RM15

Enquiry from: Jill W

Start Date: Immediate

new work tops - tradesman put foot through existing top are you the property owner: owner of the property what level of service do you require: install only do you have all of the required materials ...

Post a similar request >

03 Feb

Kitchen | Fitting

South Ockendon - RM15

Enquiry from: Donna H

Start Date: Immediate

Replace kitchen doors and drawers supply and fit call to appoint

Post a similar request >

12 May

Garden | Decking

London - E14

Enquiry from: Sahanara R

Start Date: Immediate

garden patio and cleaning weed disposing waste and rubbish designing a small theme for corner of garden are you the property owner: tenant (with permission) property type: other do you have a: small g...

Post a similar request >

12 May

Garden | Decking

London - E14

Enquiry from: Sahanara R

Start Date: Immediate

customer in the london area made an enquiry a couple of projects including wooden decking.call anytime and arrange an appointment to discuss. below is some details about this project: are you the prop...

Post a similar request >

02 May

Kitchen | Fitting

London - SE15

Enquiry from: John L

Start Date: Immediate

worktop replacement & sink

Post a similar request >

20 Jan

Interior work | Stud Walls

London - E17

Enquiry from: Lisa E

Start Date: Immediate

hi, hope you are well. we would like to build a 150cmx150cm temporary interior wall (stud wall) with a ceiling height of roughly 250cm to create a small office space in our living room. no need for ma...

Post a similar request >

07 Jan

Carpentry

London - E17

Enquiry from: Emily H

Start Date: Immediate

I want to build a large cupboard in an alcove in the hallway with selves and storage areas. We also need to replace an outdoor office door, remove the old one and fit a new one

Post a similar request >

08 Nov

Carpentry

London - E1

Enquiry from: James C

Start Date: Less than one month

i need a fd30 fire door installed for the kitchen. please quote with and without the door. are you the property owner: owner of the property property type: terrace what type of job are you looking to...

Post a similar request >

10 Aug

Flooring | Wooden

London - E14

Enquiry from: Amy W

Start Date: Immediate

several pieces of my floor were burnt accidentally and there were several blackened marks on the wooden floor, please contact me via email are you the property owner: relative of owner how many rooms...

Post a similar request >

05 Jul

Garden | Decking

London - SE8

Enquiry from: John D

Start Date: Immediate

customer requested quotes for wooden decking from a carpenter around london. they are considering a couple of projects at the moment.call anytime to arrange appointment to discuss. the information bel...

Post a similar request >

20 Jun

Kitchen | Fitting

London - SE16

Enquiry from: Ian M

Start Date: Immediate

Wooden window repair Lead

Hello. A few years ago, we had a Magnet Kitchens installed in our house, and very well it has performed too. Part of the kitchen comprised a pair of ‘slide out’ corner cupboard storage floor...

Post a similar request >

18 May

Garden | Decking

London - SE23

Enquiry from: Valerie T

Start Date: Immediate

i would on my garden to be landscaped are you the property owner: owner of the property garden type: back garden do you have a design: no, but i am open to ideas work required: planting, lawn/turfing,...

Post a similar request >

17 May

Flooring | Wooden

London - SE23

Enquiry from: Lily D

Start Date: Immediate

all floorboards lifted and joists straightened with faring pieces to a specific height, floorboards laid down and broken floorboards replaced. total floor space - 74m2. are you the property owner: own...

Post a similar request >

13 May

Garden | Decking

London - SE23

Enquiry from: Valerie T

Start Date: Immediate

i would on my garden to be landscaped are you the property owner: owner of the property garden type: back garden do you have a design: no, but i am open to ideas work required: planting, lawn/turfing,...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in South Ockendon is:

£1,018

Carpenter job Carpenter cost in 2025
Kitchen Fitting in South Ockendon £1,238-£3,748
Carpenters and joiners in South Ockendon £375-£575
Plasterboard dry lining in South Ockendon £638-£978
Wood flooring in South Ockendon £750-£1,150
Wooden decking in South Ockendon £1,125-£1,725
Garden shed in South Ockendon £450-£690
Wooden window repair in South Ockendon £320-£480

Related Carpenter searches in South Ockendon

Carpenter FAQs

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How to lay solid wood flooring on concrete?

Though both solid wood and engineered wood can be installed on a concrete sub-floor, the processes are quite different from each other. Solid wood is produced from a single plank of wood which can be reactive to both temperature and humidity changes which is capable of making the wood expand or contract. Hence, the different approach to solid wood and engineered wood flooring installation on concrete. Here, we’ll discuss how you can lay solid wood on your concrete.

First and foremost, you’d have to determine the method you’ll use to attach the planks to the floor. Is it floating whereby you only have to lay the wood flooring on the concrete after fitting the right underlay? You can also go for the most popular installation method which is gluing your floor with a flexible wood adhesive (to be applied to both the boards and the sub-floor). Or perhaps you’d prefer to use the traditional method of nailing the boards to the concrete (the nails will be covered as you lay the subsequent planks and the groove locks with the tongue).

After making this decision, you’d have to ensure that the sub-floor is well prepared for the installation. This implies checking the wood’s moisture content (mustn’t exceed 7 to 8 percent). Also inspect the floor to ensure its neat, if not, clear out the dirt or debris and make sure the surface is flat to avoid post-installation problems.

In the event whereby you discover a high moisture content, you’d want to acquire a damp proof membrane. This will not only enhance the floor’s stability, but also prevent shrinking or warping of the wood due to changes in humidity or temperature.

It is crucial to note that the preparation of the sub-floor is equally as important as the laying of the planks as this can go a long way to improve the durability and strength of your floor. Click here to learn more about wood flooring.

Can I fit a hot tub on my terrace or decking?

Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.

Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How much decking do I need?
How much decking you need will – of course – depend on how big you plan your deck to be. There is an equation to help you work out how many deck boards you need. It’s a little complicated until you’ve been shown how it works, but once you know how to do it it’s easy to work out how much decking you need for any project. The equation takes into account the recommended 10% wastage and includes the expansion gaps that are required, which is between 5-8mm along the length of the deck boards (EGL, or expansion gap length) and 3mm along the ends of the deck boards (EGW, or expansion gap width) for timber. It also assumes you’re laying your decking horizontally, as if you’re looking for a diagonal or chevron design you’ll need more deck boards. Let’s go through an example, assuming you have a 10m x 6m area that you want to cover with decking made from timber boards that are 2.4m long and 144mm wide. We’ll use the EGL of 5mm and EGW of 3mm.
  1. Calculate the surface area for your decking Multiply the length (L) of your decking area by the width (W): L x W = Decking Surface Area (DSA) in m2 10 x 6 = 60m2
  2. Work out the coverage of your deck boards Add your deck board width (DBW) to the expansion gap length (EGL), then add the deck board length (DBL) to the expansion gap width (EGW). Then multiply these numbers. (DBW + EGL) x (DBL + EGW) = Single Board Coverage (SBC) 0.144m + 0.005m = 0.149m 2.4m + 0.003m = 2.403m 0.149 x 2.403 = 0.358m2
  3. Calculate the number of deck boards you need Multiply the SBC by 1.1 to allow for 10% wastage. Then, divide the DSA by the SBC. DSA / SCB x 1.1 = Total number of boards required 60m2 / 0.358m2 x 1.1 = 184.36 boards – so round up to 185 so you’re not left short.
If that all seems a bit complicated for you, let a professional do the maths – they will be able to give you an idea of how much decking you’ll need in no time.
How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
How to fit wooden flooring?

Installing wooden flooring is a quite simple process, however to get it right the first time, there are very essential preparations that must be made. These includes determining the site is in the best condition before installation, removal of all floor coverings and underlay for a more stable and durable installation and incorporation of the right expansion gap of about 10mm to 12mm which would be maintained around the floor’s perimeter.

Wooden floor fitting can be done on two types of sub-floor - Concrete and Plywood. To install onto concrete, you can follow the guide below:

• Incorporate flexible wood on concrete adhesives.

• With the help of a 3mm toothed trowel, spread above 2 board widths of adhesive along the starting wall sub-floor, beginning at a corner of your room.

• Position the first row of flooring into the area that is glued using the tongue facing opposite the wall.

• Put 10mm spacers against the wall to see to the consistency in expansion gaps.

• Make sure the joints are at a minimum of 150mm apart from the first row when fitting the second row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

To install onto plywood, you can follow this guide:

• Make use of a porta-nailer.

• Position 10mm spacers against the wall - parallel with the installation direction.

• Fit the first row using the tongue facing opposite the wall and with the help of the porta-nailer or flooring nailer.

• Lay the second row and make sure the short end joints are at a minimum of 150mm apart from that of the first row.

• Utilize pre-cut smaller boards if you’re to start a new row with staggered joints.

• Continue with this nailing method and make sure the 10mm expansion gaps are consistent around the floor’s perimeter.

Click here to learn more about wood flooring.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in South Ockendon.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in South Ockendon?

View our open Carpenter jobs near you

Join today
View Shortlist