Find a Carpenter you can trust in Invergarry.

Choose from 22 Carpenters, all rated by people like you.

Over 130 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
We are a small family run TV Aerial and Satellite company that also specialise in CCTV and TV Wall Mounting too. With o...

Active drives

0 review(s)
Offers services in INVERGARRY
Hi here at active drives we are a Family run business with over 25 years of experience. no job too big or too small.we h...

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Invergarry is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Invergarry £975-£2,495
Carpenters and joiners in Invergarry £375-£575
Plasterboard dry lining in Invergarry £638-£978
Wood flooring in Invergarry £750-£1,150
Wooden decking in Invergarry £1,125-£1,725
Garden shed in Invergarry £450-£690
Wooden window repair in Invergarry £320-£480

Related Carpenter searches in Invergarry

Carpenter FAQs

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
Can I insulate my shed?

Yes, it is possible to insulate a shed. You might want to do this if you’re planning on working in it during the winter. A professional will be able to help you find an insulated shed or advise you on how to insulate a shed that you already have. Always seek professional advise first before attempting to do this yourself!

How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
How much maintenance will a wooden deck need?

Properly installed wooden decking will not need a lot of maintenance. Most manufacturers recommend regularly brushing leaves and dirt off the deck, and a yearly cleaning and staining procedure. This will keep the wood in the best condition. Fluids and treatments are readily available from all DIY shops and stores.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Invergarry.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Invergarry?

View our open Carpenter jobs near you

Join today
View Shortlist