Find a Carpenter you can trust in Mallaig.

Choose from 20 Carpenters, all rated by people like you.

Over 130 reviews & an average rating of 4.5/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
We are a small family run TV Aerial and Satellite company that also specialise in CCTV and TV Wall Mounting too. With o...

Active drives

0 review(s)
Offers services in MALLAIG
Hi here at active drives we are a Family run business with over 25 years of experience. no job too big or too small.we h...

Mills Agri Services

0 review(s)
Offers services in MALLAIG
Fencing is our bread and butter whether it’s security fencing or garden timber all the way to livestock and deer we have a...

Recent Carpenter Enquiries

03 Apr

Carpentry

Mallaig - PH41

Enquiry from: David B

Start Date: Immediate

Build in two double wardrobes in bedroom alcove

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Mallaig is:

£879

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Mallaig £975-£2,495
Carpenters and joiners in Mallaig £375-£575
Plasterboard dry lining in Mallaig £638-£978
Wood flooring in Mallaig £750-£1,150
Wooden decking in Mallaig £1,125-£1,725
Garden shed in Mallaig £450-£690
Wooden window repair in Mallaig £320-£480

Related Carpenter searches in Mallaig

Carpenter FAQs

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How much is plasterboard?

How Much Is Plasterboard?

Do you wish to install plasterboard in the nearest future? If yes, then you’d probably want to know the amount it’s going to cost. Here, we’ll give you a detailed plasterboarding prices breakdown to help you calculate an estimate for your project.

A plasterboarding project including the cost of both materials and labour with the use of a high quality panels is about £4 to £5 per panel. Therefore, if you wish to calculate on the basis of a standard room about 12x12ft would cost about £500 to £600. However, this price can fluctuate significantly depending on the professional as well as the quality of the materials you wish to incorporate in completing the project. We’d recommend that you hire the services of a professional with accreditation as he would provide you with a detailed quote with no hidden charges or costs. To give you a clearer idea, we’ve taken the time out to put together some estimated costs of employing the services of a seasoned professional plasterer to supply and plasterboard your home or office. Let’s take a look!

• A 6 x 12ft room with panels and plasterboard should have an average cost within the range of £250 to £400 and duration of one to two days.

• The individual cost of plasterboarding or drywalling a standard 12 x 12ft room should have an average cost within the range of £500 to £600 and duration of one to three days. These includes 60% for materials used (£330), 30% for tradespersons (£165) and the remaining 10% for waste removal (£55) to give a total cost of £550.

• A 12 x 24ft room with panels and plasterboard should have an average cost within the range of £1000 to £1200 and duration of three to six days.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to lay decking on uneven ground?
There are two ways to lay decking on uneven ground. We’ve explained how to build a raised deck in our FAQ ‘How to build a raised deck’ above, and that’s great for uneven ground or sloped gardens. But there’s another way that you can lay decking on uneven ground if you don’t want a raised deck: you can create a level supporting base. We’ll go through the basics here. Materials you’ll need
  • Paving slabs – old or cheap ones are fine
  • Timber for the frame and legs
  • Type 1 MOT hardcore
How to lay decking on uneven ground
  1. Mark out the area as we explain in ‘How to lay decking’. Then, dig to 200mm below where you want to surface of the decking to be.
  2. Add a 50mm layer of hardcore and make sure it’s compact.
  3. Build the decking sub-frame as we describe in ‘How to build a deck frame’.
  4. Lay out paving slabs along the edges and in the centre of the area. This will help to spread the weight of the decking.
  5. Set the decking frame on the slabs, checking for high or low points and adding off-cuts of timber where needed. Don’t forget to sand and seal these off-cuts with decking preservative.
  6. Add your joists and then the deck boards, leaving the recommended gaps of expansion of between 5-8mm.
Building your decking on top of paving slabs is a good way to get it level, but you still may not be able to get as good a finish as if a professional did it. If you’re in any doubt, get in contact with some decking specialists and see what they would recommend.
How to build decking on a slope?
You might think that building decking on a slope is a no-go, but it’s actually a great way to help you make use of your garden when the ground is sloping. It will provide you with a level surface that you can BBQ on as well as dine alfresco without finding that your meal is rolling down the table. But how do you build decking on a slope? Our guide in the FAQ above, ‘How to build a raised deck’, is the perfect solution – but we’ll break it down here if you just want to get an idea of what’s involved. Dig out the area If you’re laying on soil or turf, you’ll need to dig it out. Dig down and remove all the turf from the area and ensure that there are no weeds or stones in the area you’re going to build your decking on. Since you’re building on a slope, it will be hard to get it level, but dig out to a depth of 50mm and lay weed-control fabric with gravel over the top. Add posts and set with concrete Make holes for posts and add them in, ensuring they’re longer than you need. Make sure they’re level, then fill the holes with a concrete mix to set them in place. Build the outer frame Make sure you always work at the top of the slope when you’re building your decking, and measure where the highest point of the decking will be. Secure the 4 sides of the outer frame and factor in a 2mm fall for every metre of decking so rainwater can run off. Add joists Secure joists along your frame at 400mm intervals. If you get to the last joist and there will be more than a 400mm gap left at the end, add in an extra one for support. Lay your deck boards Screw your deck boards to the joists, ensuring that the deck boards are running in the opposite direction to the joists. For timber boards, you need to make sure you leave an expansion gap of 5-8mm. These steps should give you an idea of whether you want to have a go at building decking on a slope, or whether you want to leave it to the pros.
What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Mallaig.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Mallaig?

View our open Carpenter jobs near you

Join today
View Shortlist