- Plan your shed base
You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
- A concrete base laid on hardcore
- Concrete slabs on sharp sand
- Treated wood beams on hardcore or shingle
- An interlocking plastic system
- Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
- Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
- Put up the shed walls
- Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
- Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
- Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
- Fit the roof
- If the shed comes with a support bar, put this in position before you put the roof panels in.
- Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
- Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
- Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
- Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
- Add the shed windows
- Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
- From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
- Fix the window beading on the top and sides with 25mm nails.
- Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
Find a Carpenter you can trust in Tain.
Choose from 11 Carpenters, all rated by people like you.
Over 0 reviews & an average rating of 0/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you


Highland Green
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Tain is:
£879
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Tain | £975-£2,495 |
Carpenters and joiners in Tain | £375-£575 |
Plasterboard dry lining in Tain | £638-£978 |
Wood flooring in Tain | £750-£1,150 |
Wooden decking in Tain | £1,125-£1,725 |
Garden shed in Tain | £450-£690 |
Wooden window repair in Tain | £320-£480 |
Carpenter FAQs
- How to build a shed base out of paving slabs
- Mix sand and cement together to make mortar or use a pre-mixed one
- Use a trowel to lay mortar for 1 slab at a time on the sub-base and lift a damp-sided slab onto the mortar, using a piece of timber and club hammer to tap the slab into position carefully. Continue to lay the first row of slabs
- Make equally-sized spacers in all the joints in the slabs to ensure they’re the same size, checking it’s level as you go along
- Next lay slabs along the two adjacent outer edges, filling in the central area row by row
- Leave the mortar to set according to the instructions or for at least 48 hours before filling in the joints with mortar or paving grout
- Building a shed base from concrete
- Create a wooden frame around your shed base area (also called formwork) to stop the concrete from spreading
- Mix pre-mixed concrete with water or use 1 part cement to 5 parts ballast
- Wet the sub-base using a watering can with a rose on the end
- Pour the concrete onto the framed base starting in one corner
- Push the blade of a shovel up and down in the edges of the concrete to get rid of air bubbles
- Use a rake to spread the concrete, leaving it around 18mm higher than the top of the frame. Work in sections of around 1-1.m2
- Compact the concrete using a straight piece of timber that’s longer than the width of the base. Move the timber along the site, hitting it along at about half of its thickness at a time until the surface is evenly ridged
- Remove excess concrete and level the surface by sliding the timber back and forwards from the edge that you started. Fill in any depressions and repeat until even
- Run an edging trowel along the frame to round off exposed edges of the concrete and prevent chipping
- Cover the concrete with a plastic sheet raised on wooden supports to allow slow drying. Weigh it down with bricks
- Once the concrete is set, you can install your shed and remove the wooden frame with a crowbar
Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.
Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.
A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.
As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.
It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.
It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.
Are you a new homeowner? Or perhaps you’re simply looking to revitalize your home by adding some new flooring options. Wooden flooring is one of the most popular flooring options amongst home and property owners in the UK due to the multiple benefits it offers. It adds your home’s curb appeal making it stand out while also adding to resale value of your home - should you decide to sell in the near future. When it comes to the installation of wooden flooring, you have two options which includes carrying out the installation yourself or calling in a professional for help. While some homeowners would prefer to tackle this themselves, it’s highly advisable to get professional support for the project. In this article, we’re going to consider some of the benefits you stand to derive from getting your wooden flooring installed by a professional. Let’s take a look! Efficient installation. Since professionals do this type of work almost on a daily basis, they’re generally able to complete a basic job within a day or two. With them, you’d be certain that you job would be completed to perfection within a certain timeframe. Access to a range of wooden flooring options. Professionals are usually familiar with top notch wooden flooring options so they’re able to make recommendations on the most suitable wooden flooring type for your home and needs. Flooring removal. Professionals typically remove old or existing flooring and clean up the area prior to the installation of the new wooden flooring. This way, you wouldn’t have to bother about hiring someone else to remove the existing flooring or to clean up the entire area before you can be able to install the new wooden flooring yourself.
How Much Plasterboard Do I Need?
Although many people especially contractors have a tough time estimating the number of drywall or plasterboard needed to complete a project, it’s a rather simple task if all factors are taken into consideration. If you’re able to follow the same procedures taken by professionals to count dry wall sheets, you’ll be in the right direction. Let’s have a look at the procedures to follow!
lTake Square Footage Measurement
• Measure the square footage of the area where the plasterboard will be fitted.
• Multiply the height by the width of each wall or ceiling area.
• Add all quantities to obtain a total square-foot amount.
lCalculate Drywall Sheets
• To calculate the number of drywall or plasterboard sheet is very simple once you’ve gotten the total square footage.
• To get started, simply divide the total square footage of area by 32 (that’s if you are using a 4 by 8 sheets) or you can also make use of 48 to make the division (only if you’re making use of the 4 by 12 sheets).
• The answer you get after the division will give you the full number of plasterboard sheets that’s required to complete the project.
We’d recommend you include an extra 10 to 15 percent of whatever you calculate to take care of the possible odd cuts and wastages. This implies that if your total area is 1600 square feet while incorporating 4 by 8 sheets, simply divide 1600 by 32 which equals 50 sheets, now take 10% of 50 which equals 5, then add back the 5 extra to the 50 sheets earlier calculated to get 55 sheets. If you wish to estimate the cost, simply multiply the number of sheets gotten by the price per sheet. Do not forget to include delivery charges and local taxes.
Yes, although you should make sure that the terrace or decking is able to support the weight of a hot tub. Usually, you will need to have a structural survey carried out on the area. Seek the advise of a hot tub retailer or installer about the logistics of installing one at your property.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Tain.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Tain?
View our open Carpenter jobs near you
Join today