- Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
- Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
- Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
- Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Find a Carpenter you can trust in Isle Of Rum.
Choose from 60 Carpenters, all rated by people like you.
Over 21 reviews & an average rating of 4.5/5 stars, you'll find the right pro
Choose and shortlist
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Keen to get on with the job?
Get up to 4 quotes from local Carpenters near you


Pitch Perfect Laens


Garden Bros


K&D joinery


Composite Decking Glasgow


Boxelder Landscapes


Hutchison garden services
How much do Carpenter services cost?
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter adviceThe average price
of a Carpenter in Isle Of Rum is:
£879
Carpenter job | Carpenter cost in 2025 |
---|---|
Kitchen Fitting in Isle Of Rum | £975-£2,495 |
Carpenters and joiners in Isle Of Rum | £375-£575 |
Plasterboard dry lining in Isle Of Rum | £638-£978 |
Wood flooring in Isle Of Rum | £750-£1,150 |
Wooden decking in Isle Of Rum | £1,125-£1,725 |
Garden shed in Isle Of Rum | £450-£690 |
Wooden window repair in Isle Of Rum | £320-£480 |
Carpenter FAQs
What Is Engineered Wood Flooring?
Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.
Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.
The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:
• Its very easy and simple to install
• When compared to solid wood flooring, it’s more cost effective.
• It can be utilized alongside an under floor heating
• It can be loose laid, meaning it does not need to be fixed in position
• It is available in multiple varieties of wood and finishes
• It can be incorporated alongside an underlay including thermal barriers
• It can be utilized in areas with a fluctuating humidity and temperature.
• It is available in different kinds of thickness.
Click here to learn more about wood flooring.
How To Fit Plasterboard
If you’re planning to renovate your house, then here is a must-read guide! Fitting of plasterboard is a crucial step when it comes to renovation. If you’re bringing down an existing lath and plaster for an upgraded surface or adding a new wall, a plasterboard is required for your project to be a true success. If you’re a novice with no prior practice or experience, you can protect your investment by hiring the services of a professional plasterer to guarantee the best results, the first time. However, we’ve put together this guide to give you an insight on how the plasterboard fitting process is done.
To get started, you’ll need a power drill, hammer, plasterboard nails or screws, broad knife, utility knife, measurement tape, pencil, ladder as well as a joint tape.
Before proceeding, you need to identify the number of plasterboard sheets needed to commence the project by measuring the height and width of the wall as well as calculating the square footage. If you possess a stud timber wall, the steps below will get you the best results.
• Measure the walls and mark the plasterboard where you’ll make the cuts. Start with a full sheet and cut pieces down in such a way that would fit
• Score the front paper of the plasterboard with utility knife. Fold the sheet to get a clean cut through the board and make use of the knife to the remaining paper.
• Place the first sheet against the wall and use an offcut to prevent the plasterboard from touch the floor.
• Make the plasterboard rest snugly against the wall in position and screw it firmly on each stud. Once done, fasten it at all the sheets’ edges and in a line down the stud to make for a firm connection. Follow the same process for the remaining plasterboard sheet till the wall is fully covered.
Do you have existing floorboards and wish to fit new solid wood floor over it? If you’re planning to go for a DIY effort, there are a number of things you should put into consideration before you even get started. Firstly, you should have it in mind that existing softwood floorboards are usually not flat, implying that the surface of the existing might not be ideal to serve as the foundation on which to put your new solid wood flooring. Secondly, if you’re going to lay the new solid floor on the existing floorboards, it would be wise to select wood that is a minimum of 18mm thick to make your new solid wood flooring a lot more stable.
If you discover that your old floor is not too even, there are two option you can consider to protect your investment. You can lay the new floor at a 90 degree angle over the existing one. In other words, you should lay the new floor lengthways if the old one is laid widthways. Using this technique alongside a method of fitting referred to as secret nailing will go a long way to make sure your installation efforts is a successful one.
The second option you can put into consideration when laying solid wood flooring over old ones is to lay chipboard or plywood over the existing floor prior to the installation of the new floor. Here, there will be an increase in the cost of your installation, however it will be more reliable and durable as it assists in ensuring the stability of your new flooring. Some benefits that comes with this option includes the freedom to lay the new solid wood flooring in any direction you want as well as the freedom to use any fitting method you deem fit. Click here to learn more about wood flooring.
- Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
- Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
- Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
- Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
- Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
- Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.
There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.
You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).
Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:
• holiday entitlement starts as soon as you begin work;
• your employer has a complete say in when you can take your holiday;
• for holidays you get normal pay;
• after completing the job, you will be compensated for any unused holidays.
In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.
You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.
Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.
There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.
- The shed doesn’t cover more than 50% of the garden
- It’s not in front of your house
- The shed is single-storey with eaves no higher than 2.5m and the overall height is no taller than 4m for a dual-pitched roof, or 3m for any other type. If it’s located within 2 metres of your property’s boundary, it mustn't be more than 2.5m high
- There’s no veranda or balcony
- The floor area is no bigger than 15m2 - up to 30m2 may be covered under Permitted Development if other conditions are met
- The shed is for domestic use only by those who live in the property and there’s no sleeping accommodation – that means you can’t run a business from the shed unless you apply for planning permission
- If you live in a listed building, you’ll need Listed Building Consent before you can build a shed in your garden
- If you live in a conservation area or similar, the maximum area of ground covered by outbuildings, pools and enclosures situated more than 20m from any wall of the house mustn’t exceed 10m2 if they’re to be considered as a permitted development
- If you own a piece of woodland, you must seek planning permission for any permanent structure
- In Scotland, you’ll need planning permission if any part of the shed comes within 1m of a neighbouring property or is more than 2.5m high
- In Northern Ireland, there are rules about how close your shed can be from a road that passes by the back of your house. It’s best to check for clarification
- Decking joists
- Coach screws
- Coach bolts
- Combi drill
- Socket set
- A saw suitable for your project and the thickness of the timber
- Pencil
- Decking preservative
- Sandpaper or sander
- Measure your deck frame and cut to size if necessary.
- Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
- Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
- Fit the coach screws with either a drill driver or socket and ratchet.
- Repeat the process for the inner joists once you’ve assembled the outer frame.
Carpenter help and advice
How it works
Tell us about your Carpenter project
Answer a few quick questions to help us match you with the right Carpenter
Get up to 4 free quotes
Receive no-obligation quotes from 4 Carpenters working in Isle Of Rum.
Pick the right pro for you
Compare prices, customer reviews and services, and hire the right Carpenter.
Are you a Carpenter in Isle Of Rum?
View our open Carpenter jobs near you
Join today