Garden | Decking
Biggar - ML12
Enquiry from: John D
Start Date: Immediate
4 metres wide by 7 metres long including joists and all screws. Do not include balustrade Thanks
Over 152 reviews & an average rating of 4.7/5 stars, you'll find the right pro
Use the shortlist button to select up to 4 tradespeople, enter your project details and press send
Get up to 4 quotes from local Carpenters near you
Biggar - ML12
Enquiry from: John D
Start Date: Immediate
4 metres wide by 7 metres long including joists and all screws. Do not include balustrade Thanks
Biggar - ML12
Enquiry from: Gerald J
Start Date: Immediate
A basic 6x4 garden shed to store garden tools. I would want it installed safely on slabs etc.
Biggar - ML12
Enquiry from: Eilean C
Start Date: Immediate
Several lining panels inside roof loose and need to be re-fixed. Sills on two doors need to be re-fixed - : - : - : Time scale: Immediate
Biggar - ML12
Enquiry from: Ted G
Start Date: Immediate
Delivery and erection of shed 12ftx9ft
Lanark - ML11
Enquiry from: Andrea M
Start Date: Immediate
Garden taken back 2/2&1/2 feet, timber steps built the width of the garden. Replacement small fence & gate. New shed with small pergola at the side.
Lanark - ML11
Enquiry from: Andrea M
Start Date: Immediate
A joiner to fix, & supply old & new internal doors, please
Lanark - ML11
Enquiry from: Paolo L
Start Date: Immediate
customer made an online enquiry for wooden decking and confirmed on sms and email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the ...
Carluke - ML8
Enquiry from: Keith H
Start Date: Immediate
driveway pressure washed, replacement decking boards and posts, pruning and cutting of some trees and some hard landscaping are you the property owner: owner property type: detached do you have a: lar...
Carluke - ML8
Enquiry from: Aileen P
Start Date: Immediate
rubble clearance, collapsed shed clearance, general rubbish clearance are you the property owner: relative of owner do you have a: large garden what level of service are you looking for: removal of o...
Lanark - ML11
Enquiry from: Michael C
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Other, Work description: 2 sheds doors paint Shelfs put up in shed Fencing to be painted 3 washing po...
Carluke - ML8
Enquiry from: Michael B
Start Date: Immediate
kitchen refurb inc new floors, some new plasterboard required some tiling, fit new kitchen cabinets to plan some electrical work complete refurb of small toilet next to kitchen as well are you the pr...
Lanark - ML11
Enquiry from: Dougie M
Start Date: Immediate
I need a 10x8 shed and price Are you the property owner: Tenant (with permission) What level of service are you looking for: Supply Do you have a: Large garden Please call to appoint
Lanark - ML11
Enquiry from: Martyn W
Start Date: Immediate
Customer visited the mykitchenprices.co.uk site and submitted an enquiry. Kitchen Area: 150, Property type: House, Work description: Remove old and Fit new Worktop 3 sections 1*3M plus 2*2M Joined. ...
Lanark - ML11
Enquiry from: John M
Start Date: Immediate
Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: New build house so require back garden to have flat wooden decking 3 x 3 mtrs ....
Carluke - ML8
Enquiry from: Claire M
Start Date: Immediate
Knock down internal wall, extend and fit new kitchen to create open plan family room. Block internal door into garage conversation and create new opening in other location to room. Time scale: Imme...
Lanark - ML11
Enquiry from: Christina G
Start Date: Immediate
Wooden (Butchers Block) kitchen worktops now discoloured because of water (only the 2 near sink). Can they be restored to their former glory by sandpapering/stripping/oiling along with the other match...
Halmyre Mains - EH46
Enquiry from: Karen C
Start Date: Immediate
Decking
Lanark - ML11
Enquiry from: Anne P
Start Date: Immediate
Need old integrated freezer removed and new one fitted.It's about the same size as a conventual fridge. - : - : - :
Lanark - ML11
Enquiry from: Adele B
Start Date: Immediate
8x6 shed made and erected
Carluke - ML8
Enquiry from: Ed M
Start Date: Less than one month
Home Owner Downstantions on garage are rotting away, need cutting away and replaced Call To Appoint
Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!
Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.
The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.
View our Carpenter cost guide View our Carpenter advice| Carpenter job | Carpenter cost in 2026 |
|---|---|
| Kitchen Fitting in Biggar | £738-£2,498 |
| Carpenters and joiners in Biggar | £213-£5,288 |
| Plasterboard dry lining in Biggar | £638-£978 |
| Wood flooring in Biggar | £750-£1,150 |
| Wooden decking in Biggar | £1,125-£1,725 |
| Garden shed in Biggar | £450-£690 |
| Wooden window repair in Biggar | £320-£480 |
The cost of wood flooring varies by the type of wood and by the finish required. As a guide though oak solid wood flooring cost about £35 - £45 per m2. The average wooden cost by material are approximately £40 per m2 for pine, £45 per m2 for cherry, £60 per m2 for maple and £75 per m2 for walnut. This price does exclude the laying of the flooring and the underlay required.
The cost of just the engineered wood flooringis from £18 to £73 per m2.
What Is Engineered Wood Flooring?
Engineered wood flooring is produced through the fixing of several layers of wood together with a solid wood as the top or wear layer. Due to its ability to hold its ground when faced with frequently changing temperature and humidity, it happens to be one of the most popular types of flooring. As a result of its ruggedness, engineered wood flooring can be easily fitted with under floor heating and in special areas like conservatories. And apart from its usually stunning visual appeal and ability to be floated over an underlay, the engineered wood flooring is even becoming a lot more popular amongst home and other property owners.
Given the fact that engineered wood flooring is made up of several layers of wood, it may be almost impossible to tell the difference between it and a solid wood flooring just by looking at both. It can also be mistaken for a laminate flooring which is basically an image of wooden flooring placed onto a high density fibreboard.
The planks of a engineered wood flooring is crafted in such a way to ensure the it does not expand or contract unlike the solid wood counterparts. What’s more? There are several benefits that comes with installing an engineered wood flooring. They include:
• Its very easy and simple to install
• When compared to solid wood flooring, it’s more cost effective.
• It can be utilized alongside an under floor heating
• It can be loose laid, meaning it does not need to be fixed in position
• It is available in multiple varieties of wood and finishes
• It can be incorporated alongside an underlay including thermal barriers
• It can be utilized in areas with a fluctuating humidity and temperature.
• It is available in different kinds of thickness.
Click here to learn more about wood flooring.
How To Lay Wood Flooring
Laying of wood flooring is actually a very simple task contrary to many beliefs. First and foremost, before commencement of the fitting process, you must determine the direction you would like the engineered wood flooring to lie in. To do this the right way, they should lie in the direction of the the longest wall. However, if your subfloor is wooden, then having the boards positioned across the joists underneath would be your best bet to get started.
Here are some simple steps to follow to properly lay your wood flooring:
• Start from a corner, working from left to right and place the initial rows of the boards with the groove’s end directly opposite the closest wall.
• Make use of expansion spacers. Place them in between the wall and the board alongside an expansion gap of about 8 to 10mm.
• Place the board’s final rows at about 100mm wide. To achieve this, it is crucial to be pro-active with the measurement and cut the boards (if you deem fit) to adjust the first row.
• With the help of the click system, the boards will click together.
• Fit in the next board. Ensure to attach the tongues together (30 degrees from the floor) and once done, you can proceed to lower and lock it in place. Do this till you get to the end of the row.
• Cut the last board of the row to size if its too long.
• If the part cut off is up to 300mm, simply use it to start the next row. If not, cut a new board in half to use.
• Put the rows side by side in such a way to ensure the joints are staggered at each and every row. Keep a consistent gap between the wall and the planks via the continuous use of the spacers.
• Lay a plank over the last row to determine the width of the previous board. Position a new plank in a way that its tongue is directly against the wall. Once done, proceed to mark a line of plank underneath to get the required width. Then, fit the plank into the space with the help of a pull bar and hammer.
Click here to learn more about wood flooring.
Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.
How To Plasterboard A Wall
If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!
• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.
• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.
• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.
• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.
• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.
• Mark lines down across the board at the stud’s centre.
• Cut the end boards to length.
• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.
• Cut any board extending into an opening and finish the edges using a surform.
We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.
Answer a few quick questions to help us match you with the right Carpenter
Receive no-obligation quotes from 4 Carpenters working in Biggar.
Compare prices, customer reviews and services, and hire the right Carpenter.
View our open Carpenter jobs near you
Join today