Find a Carpenter you can trust in Shepton Mallet.

Choose from 44 Carpenters, all rated by people like you.

Over 77 reviews & an average rating of 4.1/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Rightway Environmental

0 review(s)
Offers services in SHEPTON MALLET
Rightway Environmental are an Asbestos removal company that have been independently licensed by the Health and Safety Exec...
Verified Pro

J&D Home Improvements

1 review(s)
Offers services in SHEPTON MALLET
Hi at j&D home improvements we take pride in our work to make satisfied customers All work in fully guaranteed Ful...
Verified Pro

Betterview Landscaping & Patios

0 review(s)
Offers services in SHEPTON MALLET
Betterview Landscaping & Patios have been providing driveways, lock paving, tarmac and hard landscaping services acros...
Verified Pro

Top2BottomPlastering & renovations

0 review(s)
Offers services in SHEPTON MALLET
Top 2 Bottom Plastering & Renovations is a Hampshire-based plastering company delivering high-quality workmanship from sta...

Recent Carpenter Enquiries

16 Jul

Carpentry

Shepton Mallet - BA4

Enquiry from: Janet B

Start Date: Immediate

I need replacement internal doors upstairs, 4 in total, new handles too. I also need some lvt laid in bathroom, (under floor 6mm waterproof ply I think)

Post a similar request >

26 Apr

Carpentry

Shepton Mallet - BA4

Enquiry from: Martin B

Start Date: 1 to 3 months

stair case and banisters, either oak spindles or glass panels. possibly under stairs cupboard are you the property owner: owner of the property property type: semi detached what type of job are you lo...

Post a similar request >

31 Mar

Carpentry

Shepton Mallet - BA4

Enquiry from: Joji M

Start Date: Immediate

Hi, I would like to repair or replace a conservatory timber doors which is not able to shut properly in winter times. Please let me know if you could do this. Thanks. J Mathew ***

Post a similar request >

23 Sep

Carpentry

Shepton Mallet - BA4

Enquiry from: Elizabeth J

Start Date: Immediate

Painting & decorating 2 bedrooms, stairwell, living room. Painting some Outside windows.

Post a similar request >

04 Sep

Carpentry

Shepton Mallet - BA4

Enquiry from: Marie P

Start Date: Immediate

Replace one skirting board in hallway, 10’ 10’’, (3m29cm), (approx). New flooring will arrive soon, so we’d be grateful if you could do this for us.

Post a similar request >

10 Nov

Kitchen | Fitting

Gillingham - SP8

Enquiry from: Colin M

Start Date: Immediate

Quote to replace worktops

Post a similar request >

07 Oct

Garden | Decking

Yeovil - BA22

Enquiry from: Karen C

Start Date: Immediate

Garden decking wooden - Measurement second half front 1.69 m (169 cm, 5′ 6″) Measurement half back left side 2.27 m (227 cm, 7′ 5″) Measurement across front 3.19 m (319 cm, 10′ 6″) ...

Post a similar request >

29 Aug

Kitchen | Fitting

Wells - BA5

Enquiry from: Sally L

Start Date: Immediate

Granite worktop cut to accommodate new hob

Post a similar request >

17 Aug

Garden | Decking

Wells - BA5

Enquiry from: Barbara S

Start Date: Immediate

annual maintenance of a deck currently in good condition are you the property owner: owner of the property property type: detached what level of service do you require: deck only please call to appoi...

Post a similar request >

17 Aug

Garden | Sheds

Cheddar - BS27

Enquiry from: Simon A

Start Date: Immediate

Dismantel and remove garden shed

Post a similar request >

15 Jul

Garden | Sheds

Somerton - TA11

Enquiry from: Sid D

Start Date: Immediate

To erect a 15 x 8 modular pent roof shed on existing concrete base

Post a similar request >

10 Jul

Garden | Decking

Warminster - BA12

Enquiry from: Jill C

Start Date: Immediate

Renovation/replacement of raised decking at rear of house which has been in place for 25 years approx.

Post a similar request >

23 Jul

Garden | Sheds

Warminster - BA12

Enquiry from: Colin K

Start Date: Immediate

Wooden window repair Lead

customer in warminster areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 23/07/2024 10:47.please call to arrange ...

Post a similar request >

21 Jun

Carpentry

Warminster - BA12

Enquiry from: Anna S

Start Date: 1 to 3 months

Wooden window repair Lead Wooden window repair Lead

desk and shelving/cupboards in an alcove area. are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: furniture fitting, other do...

Post a similar request >

12 Apr

Carpentry

Glastonbury - BA6

Enquiry from: Charles B

Start Date: Immediate

We are looking to replace an old staircase that is mid 1950s and has small steps. Just looking for a simple staircase in similar style

Post a similar request >

05 Jan

Carpentry

Wells - BA5

Enquiry from: Duncan M

Start Date: Immediate

I need some wooden shelves put up in 2 alcoves in my kitchen and dining room for kitchen items and office/pc etc items. Thanks

Post a similar request >

18 Dec

Carpentry

Frome - BA11

Enquiry from: Ashley B

Start Date: 1 to 3 months

2 staircases that enables us to from the ground floor into the loft. many thanks. are you the property owner: owner of the property property type: detached what type of job are you looking to have don...

Post a similar request >

20 Nov

Carpentry

Wincanton - BA9

Enquiry from: Robyn D

Start Date: Immediate

Hi there, we are just about to purchase a new property at the above address. It needs a lot of work before we even think about carpentry but im retreiving some quotes for when the time comes. ...

Post a similar request >

12 Nov

Carpentry

Somerton - TA11

Enquiry from: Ann A

Start Date: Immediate

Shelves fitted in alcove in bathroom

Post a similar request >

19 Oct

Carpentry

Glastonbury - BA6

Enquiry from: William C

Start Date: 1 to 3 months

replacement outdoor staircase wanted for a first floor door at the rear of a garage. ideally it would be steel/weatherproof. i look forward to hearing from you. happy to provide a video of the stairca...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Shepton Mallet is:

£1,191

Carpenter job Carpenter cost in 2026
Kitchen Fitting in Shepton Mallet £975-£2,495
Carpenters and joiners in Shepton Mallet £375-£575
Plasterboard dry lining in Shepton Mallet £638-£978
Wood flooring in Shepton Mallet £750-£1,150
Wooden decking in Shepton Mallet £1,125-£1,725
Garden shed in Shepton Mallet £1,817-£3,730
Wooden window repair in Shepton Mallet £320-£480

Related Carpenter searches in Shepton Mallet

Carpenter FAQs

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

How many hours does a carpenter work?

The number of hours you would have to invest and the number of holidays you will have will be mentioned on the contract before you undertake a project. It is very common that of you to be asked of work longer than your shift. It is completely your choice if you want to work more hours, but your employer has no right to force it on you.

There are certain guidelines that establishes the maximum number of hours an individual should labour each week. In general, the maximum number of hours for someone not yet 18 years old, is 40 hours in a week, or eight hours a day. For workers who are aged 18 or above, the number of hours increases to 48 hours a week.

You can contact the environmental health department of your local council or the National Health and Safety Executive (0845 345 00 55) for more information and advice about working hours. According to the law, all workers have the right to a holiday of at least 5.6 weeks (or a total of 28 days of paid leave, if you happen to work five days in a week).

Your holidays may be extended than the minimum right, but it is dependent on your employer. The critical things you should keep in mind about holiday rights are:

• holiday entitlement starts as soon as you begin work;

• your employer has a complete say in when you can take your holiday;

• for holidays you get normal pay;

• after completing the job, you will be compensated for any unused holidays.

In order to meet the requirements for the right to once a year leave you need to be categorized as a worker. You will have no statutory right to paid annual leave if you’re self-employed.

You, as a worker will not have a statutory right to paid leave on bank and public holidays. If you are given a paid leave on a bank or public holiday, this can count towards your 4.8 weeks minimum leave privilege. However, you may be provided with a paid leave on bank and public holidays in addition to your annual leave entitlement, if your employer chooses so.

Great Britain has a total of eight permanent bank and public holidays, whereas, Northern Ireland has ten.

There is no automatic right to an enhanced pay rate that you can exercise if you work on a bank or public holiday. Your remuneration depends on your contract of employment.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
How to put up plasterboard?

How To Put Up Plasterboard

Putting up a plasterboard is a vital process when it comes to home renovations. However as daunting as it may seem, with a good guide and regular practice you can master the skill within a small period of time. If you lack proper training and experience, we’d recommend you hire a seasoned professional plasterer for help so as to get the best result and also avoid additional costs due to possible damages.

Putting up plasterboard is way quicker than wet plastering and also significantly reduces the drying time that can slow down your renovation plans. With a plasterboard, you can delve straight into the decorating stage and achieve a smooth finish. Below are the steps required to put up a plasterboard.

• The first step is cutting the plasterboard to shape which be one of the most challenging parts of the process. This is because you’ll need to fit the board around things such as plug sockets and window sills. As a result, this involves cutting complex shapes rather than just a simple straight line. To get this done, simply mark out the cut required with the use of a tape measure, combination square and spirit level for a better precision. Once done, you can then use a plasterboard pad saw to cut along the marked spots.

• After you made the required cuts, the next step is putting up the plasterboard. And depending on where the boards are going to be put, this could be a very challenging task. If you’re going to put the boards on the ceiling or somewhere very high up, you’d probably need an extra pair of hands for help. To get this done, use the appropriate screws to secure the boards in place if you’re installing them directly on studs. However, if you’d be fixing them onto bricks or blocks, a drywall adhesive is your best bet.

How to lay decking?
Laying simple, ground-level decking may sound intimidating, but it doesn’t have to be. With careful planning and preparation, you can lay decking that you’ll be proud to show off to neighbours, family and friends. Here are a few tips to get you started. Plan carefully Draw out a plan, to scale, on paper. This will help you to know how many boards you’ll need and ensure that you don’t end up having to cut anything to fit. Prepare the area Measure out the site according to your plan and hammer a peg into each corner, then tie string around each peg to help you see what you’re working with. If you’re not laying on existing slabs, dig into the ground, lifting out turf if it’s there, and check that the site is level. Then add concrete slabs for more stability or lay weed-control fabric over the ground and cover with gravel to further prevent weed growth. Build your sub-frame Since a lot of people ask this, we’ve got a more detailed guide in the FAQ below. Lay your deck boards
  1. Start in one corner of the sub-frame and position the first board across the inner joists. You want the deck board in the opposite direction to the inner joists, ensuring that it’s flush with the frame. Position any end-to-end joins between the deck boards halfway across an inner joist so you can screw both boards into the joist for stability. Make sure you keep a gap of between 5-8mm to allow for expansion of the wood.
  2. Begin to screw your deck boards to the joists. You’ll need to secure the deck board to every joist is covers along your deck frame. Use two screws for every joist. Mark where you’re going to add your screws, ensuring that they are at least 15mm from the end of the board and 20mm from the outside edges. Drill pilot holes for the screws, being careful to only drill through the deck board and not the joist. Then screw the decking screws into the holes.
  3. Continue to screw in the deck boards, ensuring you leave the correct expansion gap. You can stagger the deck board joins across the deck for more strength.
  4. Sand down any cut ends if you need to before applying decking preserver to protect the timber from rotting.
Although this is a simplified set of instructions, it’s enough for you to see whether you want to attempt to lay decking yourself – and if you don’t, you can get in touch with professionals who will be happy to give you a quote.

How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How much is decking?
How much decking costs depends on the type of material you go for, how big you want your decking to be and where you live in the country. But typically, the cost of decking is between £1,200 - £1,800. The most popular material for decking is pre-treated softwood, which will set you back around £1,000 for 15m2. Hardwood is more expensive but is more durable, and will cost approximately £2,000 for the same amount. Homeowners are also beginning to choose composite decking, which is made from recycled plastic and wood fibres, and is low-maintenance and eco-friendly. This will cost around £1,600 for 15m2, while uPVC which is also a low-maintenance option costs around £600. People tend to choose composite over uPVC because it looks more like natural timber. If you’re a competent DIYer, you might want to have a go at laying decking yourself which will set you back around £1,000 for a standard softwood timber deck. We think it’s worth paying the extra £600 for a professional to lay your decking, since they will be able to do it much more quickly. If you do want to try it yourself, we recommend leaving at least a whole weekend open to do it, but it’s likely to take you longer. Factor in the possibility of having to take time off work to complete it and it might be more cost-effective to leave it to the pros.
How to plasterboard a wall?

How To Plasterboard A Wall

If you’re looking to plasterboard your wall, one of the essential things to have in mind is that the plasterboard must be hung horizontally and not vertically. Due to the way they’re manufactured, plasterboard sheets normally possess a “grain along the length. This implies that, it’s only when they’re firmly placed perpendicular against the wall that they’re able to achieve their maximum strength. Materials you’ll need to complete this task includes: Tape measure, stanley knife, pencil, spirit level, drill driver or screw gun, surform, drywall screws and handsaw. Now let’s have a look at the wall plasterboarding steps!

• To plasterboard a wall the first step to take is to place each board in such a way to make the edges the centre of the noggins and upright. Also, the the adjoining walls and door openings should fit closely to the edges.

• Work from the door opening to the ending wall. From the the stud’s edge to the noggin’s centre, use your tape measure to measure a cut board and as a rule to mark up.

• Place your spirit level on the marks and use the Stanley knife to run a line along the intended cut. Once done, turn the board on its edge and give a sharp push on the back to split.

• Cut the paper left with the knife after folding the split edge back on itself. This way, you should get a nice and clean edge.

• In its right position, place the board up against the studwork. Install the screws on the board’s edges where a noggin or upright can be seen.

• Mark lines down across the board at the stud’s centre.

• Cut the end boards to length.

• Install the remaining boards as mentioned above. While doing this, make sure the factory edges are together.

• Cut any board extending into an opening and finish the edges using a surform.

We’d recommend you hire the professional services of a plasterer for the best results especially if you lack the necessary training or experience. Plasterboarding a wall can be a tricky challenge and you’d save yourself some time, money and effort by getting it right on the first trial.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Shepton Mallet.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Shepton Mallet?

View our open Carpenter jobs near you

Join today
View Shortlist