Find a Carpenter you can trust in Boldon Colliery.

Choose from 66 Carpenters, all rated by people like you.

Over 23 reviews & an average rating of 4.7/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Carpenters near you

View Shortlist
Verified Pro

Haus 12 Interior

0 review(s)
Offers services in BOLDON COLLIERY
Haus 12 Interiors is in the kitchen business for over 25 years, you could say that we know a thing or two about designing ...
Verified Pro

Lakeland Kitchens and Bathrooms

0 review(s)
Offers services in BOLDON COLLIERY
Kitchens and Bathroom showroom. Nolte German kitchen designers and installers kitchens and bathrooms to homes across Cumbr...
Verified Pro

Morespace conversions NE

0 review(s)
Offers services in BOLDON COLLIERY
Been in the building trade for nearly 30 years there isn't much I haven't done in the building trade. Got all the trades ...
Verified Pro

LNB Services

0 review(s)
Offers services in BOLDON COLLIERY
Painting and decorating partnership, covering all aspects of decorating, interior and exterior work carried out..we also d...
Verified Pro

Toplineroofing & gutters

0 review(s)
Offers services in BOLDON COLLIERY
We cover all aspects of gutter repairs Gutter cleaning Roof cleaning New gutter installation Drip felt Dry verdge

Recent Carpenter Enquiries

07 Jun

Garden | Sheds

Boldon Colliery - NE35

Enquiry from: Sam N

Start Date: Immediate

customer in boldon colliery areas is looking to do a couple of projects at the moment, and would like quotes for garden shed.confirmed interest via sms and email at 07/06/2023 15:03.please call to arr...

Post a similar request >

20 Jun

Garden | Sheds

Chester le Street - DH2

Enquiry from: Pauline O

Start Date: Immediate

remove old 6 x 4 apex wood shed. i have a concrete base, gardens on slope, have water issues. i would like/need a raised base, looking at plastic, with membrane underneath and filled with gravel (have...

Post a similar request >

18 Apr

Garden | Sheds

Chester le Street - DH3

Enquiry from: John B

Start Date: Immediate

1 shed supplied & erected.

Post a similar request >

04 Apr

Garden | Decking

Stanley - DH9

Enquiry from: Andrew S

Start Date: Immediate

5 x boards 3.7m to be replaced.

Post a similar request >

04 Nov

Interior work | Stud Walls

Sunderland - SR3

Enquiry from: Chrystina G

Start Date: Immediate

Studded walls and velux window installed in loft

Post a similar request >

20 Mar

Carpentry

Houghton le Spring - DH4

Enquiry from: Colin N

Start Date: 1 to 3 months

oak staircase refurbish with glass panels. panels not to have any chrome hangers are you the property owner: owner of the property property type: detached what type of job are you looking to have do...

Post a similar request >

07 Nov

Carpentry

Stanley - DH9

Enquiry from: Scott B

Start Date: Immediate

Good Afternoon I'm enquiring to see if you could fabricate 2 off table tops 2100x1000 and 1665x1000. These need to manufactured from 30mm light oak with radius edges and corners. I have a drawing ...

Post a similar request >

31 May

Carpentry

Peterlee - SR8

Enquiry from: Kathryn R

Start Date: Less than one month

renovation of banisters and balustrades on stairs, new doorway created for under stairs space are you the property owner: owner of the property property type: semi detached what type of job are you lo...

Post a similar request >

06 Oct

Carpentry

Seaham - SR7

Enquiry from: Brian M

Start Date: Less than one month

7internal doors require fitting are you the property owner: owner of the property time scale: less than one month what type of job are you looking to have done: wooden window/doors what level of servi...

Post a similar request >

11 Sep

Carpentry

Houghton le Spring - DH5

Enquiry from: Alan P

Start Date: Immediate

i need a door installer to installer french doors into what is currently a single door space. so new framing and fitting of double doors. this could lead to other work rrquired on site. are you the p...

Post a similar request >

26 Aug

Carpentry

Seaham - SR7

Enquiry from: Victoria H

Start Date: Immediate

hello can you give me a rough price to supply and fit 2 internal doors please (depending on price may get more) but definitely the two worst ones to start, maybe cottage style but open to other styles...

Post a similar request >

11 Aug

Garden | Sheds

Houghton le Spring - DH5

Enquiry from: Bill J

Start Date: Immediate

Cutting of grass Trim bushes Planning further developments - shed, greenhouse, raised beds for veg growing in 2023

Post a similar request >

03 Aug

Carpentry

Stanley - DH9

Enquiry from: Stephen M

Start Date: Less than one month

3 doors supplied and fitted including hinges and handles. one door to be hiung the opposite way are you the property owner: owner of the property property type: terrace what type of job are you lookin...

Post a similar request >

11 Jul

Carpentry

Stanley - DH9

Enquiry from: Ellen H

Start Date: 1 to 3 months

five internal doors fitted are you the property owner: owner of the property property type: semi detached what type of job are you looking to have done: other how many windows do you need: none do yo...

Post a similar request >

01 Jun

Garden | Sheds

Sunderland - SR2

Enquiry from: Freda G

Start Date: Immediate

customer made an online enquiry for garden shed and confirmed on email they would like a call with a carpenter to discuss prices.please call to arrange an appointment to quote. are you the property ow...

Post a similar request >

09 May

Carpentry

Durham - DH7

Enquiry from: Karen M

Start Date: Immediate

4 standard size internal doors to be fitted one is glazed, i’ve got the handles and hinges already. are you the property owner: owner of the property property type: detached what type of job are yo...

Post a similar request >

04 May

Carpentry

Sunderland - SR2

Enquiry from: Peter B

Start Date: 1 to 3 months

replace an existi g door and fit a new door are you the property owner: owner of the property what type of job are you looking to have done: wooden window/doors how many windows do you need: none do y...

Post a similar request >

20 Apr

Garden | Decking

Chester le Street - DH3

Enquiry from: Sandra H

Start Date: Immediate

new layout of my garden , to include, summer house, fire pit, possibly hot tub, but to fit in with a cottage style house. are you the property owner: owner of the property property type: semi detached...

Post a similar request >

17 Apr

Garden | Decking

Durham - DH1

Enquiry from: Anna C

Start Date: Immediate

grey composite decking roughly 4m x 5m are you the property owner: owner of the property property type: semi detached what level of service do you require: supply and deck please call to appoint

Post a similar request >

16 Apr

Carpentry

Stanley - DH9

Enquiry from: Wayne H

Start Date: Less than one month

i am replacing our internal wooden doors with new ones, we have 10 in total waiting to be hung, 5 upstairs and 5 half glazed downstairs. are you the property owner: owner of the property property typ...

Post a similar request >

How much do Carpenter services cost?

Do you have a need for a carpenter in or around your house? If yes, then one of the first things you’d probably want to know is the exact amount it would cost to get the project over the line. Now, carpenters are skilled craftsmen that are able to make things with wood and fabricate all sorts of wood constructions. The price charged by carpenters are determined by a wide range of factors which makes it nearly impossible to provide a short and accurate estimate without having a look at your unique requirements. In this post, we’re going to give you an in-depth insight into general carpentry charges while also considering some of the influencing factors. Let’s take a look!

Some of the most common factors that determines the price charged by a carpenter includes the project type, the size as well as scope of the project, the location of project, ease of access, experience and qualification of the carpenter and lots more. For instance, if the job is a minor one such as building a shed, it’ll cost a lot less than something more complex which requires a bit more experience like constructing a staircase. In general, building a shed will have a labour cost within the range of £150 to about £250, while a staircase construction will require a labour cost in between £1,000 to £1,500. For general carpentry, you can expect to pay within the range of £20 to £30 hourly rate depending on a number of factors which are stated above. It’s also important to state that while some carpenters charge per hour, others by the day and several of their projects will be charged at fixed prices.

The table reveals the kinds of work that Carpenters normally do and also the regular cost range of these jobs. Some tasks take longer to finish than others so costs do differ by task.

View our Carpenter cost guide View our Carpenter advice

The average price
of a Carpenter in Boldon Colliery is:

£879

Carpenter job Carpenter cost in 2025
Kitchen Fitting in Boldon Colliery £975-£2,495
Carpenters and joiners in Boldon Colliery £375-£575
Plasterboard dry lining in Boldon Colliery £638-£978
Wood flooring in Boldon Colliery £750-£1,150
Wooden decking in Boldon Colliery £1,125-£1,725
Garden shed in Boldon Colliery £450-£690
Wooden window repair in Boldon Colliery £320-£480

Related Carpenter searches in Boldon Colliery

Carpenter FAQs

What should I do if my deck or terrace is slippery?

Usually, slipperiness is caused by algae or dirt on top of the deck or terrace. A full cleaning treatment should restore the natural grip of the wood or stone. If slipperiness is a persistent problem, consider installing grip mats in high traffic areas of the deck.

How to build a raised deck?
Building a raised deck will take some time and is trickier than laying standard decking at ground level, but if you want to build decking on a slope or uneven ground it’s the best way to do it. If you do your research and follow instructions, you and a friend or family member can build a raised deck over a few days. Here’s a simplified guide of the steps you’ll need to take. Plan carefully It’s best to plan your raised deck by drawing it to scale on paper before you go and get supplies. This will help avoid wastage and making more cuts to timber than necessary. Prepare the area Prepare the area according to the instructions we give in the FAQ ‘How to lay decking’. However, because you’re building a raised deck, you’ll need to add posts:
  1. Place a post in the corner of the frame you created with the pegs and string. Measure and mark out 100mm from each side.
  2. Dig out this soil to a depth of 700mm (watch out for cables or pipes). You should have a 300 x 300mm hole. Repeat for the other 3 corners.
  3. Using a brick bolster, split a concrete block in two. Put a section of the block in each hole.
  4. Get a length of post longer than you need and place one in each hole. You can cut it down later.
  5. Create props on each post to hold them in place until you’re ready to add a cement mix. Check that they’re level. When you’re happy that they are, secure them in place with a concrete mix, making sure you create a slope in the concrete so that rainwater runs away from each post. When the concrete is set, remove the props.
  6. Create a string line around each corner post and find the centre point between each. Place a timber batten at each point, ensuring that they’re not spaced any more than 1500mm apart.
Make the outer frame
  1. Working from the corner where the deck will be at its highest above ground level, measure and mark on the post where the highest part of the frame will be.
  2. Measure from the far side of one post to the opposite and cut sections of joist to size. Line up a piece of joist with the mark you made and temporarily secure it. Factor in a 2mm fall for every metre of decking so rainwater can run off.
  3. Secure the frame to the other corner post, ensuring it’s at the right level. Do this for every side of the outer frame.
  4. Using 100mm coach screws with washers hanging on the end, secure each end of the four sections of frame.
  5. Mark out where the centre of the support posts will be and secure all of these posts to the frame, except the centre post.
  6. Add your central support joists. These should run in the same direction as the deck boards will run. You’ll need to measure from the inside of the frame on one side to the inside of the frame on the opposite side. Attach the joist in the same way as you did for the other posts. Repeat so the centre post is in between two sections of frame and secure the posts with concrete.
  7. Trim down all the posts to the correct height using a saw.
  8. Add your weed-control fabric and weigh down with gravel across the entire area.
Add your joists
  1. Measure 400mm from the centre of the outer frame and mark a line. This will be where the first joist is positioned. Repeat at 400mm intervals down the length of the frame – if the last one will be more than 400mm, add another joist to create enough support.
  2. Attach a joist hanger to each end of the joist.
  3. Place the joist in position so the centre lines up with the 400mm spacer mark.
  4. Secure using external grade screws once you’re happy that the joist is flush with the frame.
Lay your decking boards Refer to our FAQ on how to lay decking to see how you should attach your decking boards. Remember: Always treat cut ends and pilot holes with decking preservative to keep your decking in good condition for as long as possible. Building a raised deck isn’t a straightforward task. If you’d rather leave it to the professionals, get a range of quotes to help you get the best price and a high quality finish.
What is the difference between a carpenter and a joiner?

Most of the people out there do not know the difference between a carpenter and a joiner. This is a very common question that is asked by many as to whether there is an actual difference between the two.

Both joiners and carpenters have many shared traits. The definition seems to change throughout the UK. The southern parts use the term carpenter whereas the north seems to prefer the term joiner. Both of these trades involve working with wood mainly in the construction industry. Both of them are, however, are two very unique and separate trades. Both of them come under the broad term of ‘carpentry’ however their skills and specialisms differ.

A joiner is defined as a trained craftsman who is responsible for making or joining wood in a workshop. On the other hand, a carpenter is a professional that works on site with the timber. In summary, a joined creates the wood back at the workshop while the carpenter fixes them on site. A joiner, therefore, works on things that are done in a workshop using machinery while a carpenter is responsible for its assembly on site.

As both joiners and carpenters had learnt the basics of both trade while they were practising as an apprentice, several similar overlaps are bound to occur.

It is good practice to ask the company or the individual what trade they specialise in. As an example, a joiner may be able to make a particular item whereas a carpenter may be better doing the actual fitting.

It is evident from the above sections that carpentry and joinery are completely different and therefore, should be categorised under two different trades, however, there is indeed a lot in common in their extremely high skilled work.

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to build a shed?
A garden shed is a great option to add extra storage space in your garden. Lock away your lawnmower, tools, outdoor toys and furniture so it doesn’t get weather damaged or stolen. But how do you build a shed? We’ll go through a brief guide on building a shed using a flat packed one.
  1. Plan your shed base You must have a sturdy base for your shed, otherwise the frame won’t stand properly and could stop the door from opening. Decide whether you’re going to have:
    • A concrete base laid on hardcore
    • Concrete slabs on sharp sand
    • Treated wood beams on hardcore or shingle
    • An interlocking plastic system
    All bases should be laid on firm, level ground as far as possible.
  2. Treat wood with preservative To help your shed last as long as possible, you should coat all the wooden parts with timber preservative before you put it together.
  3. Put the shed floor together Some will need more assembly than others, but you need to make sure that the floor panel is attached to the joists; follow the manufacturer’s instructions for the correct spacing.
  4. Put up the shed walls
    • Mark the centre point of each wall on its bottom edge, then do the same for the shed floor so you can line them up together.
    • Stand the gable end on the base and line it up. Check that it’s vertical with a spirit level – you might need someone to support the panel while you do this. Use a temporary holding batten to keep it in place.
    • Fix a side panel to the gable end panel with countersunk screws, then add the second side panel in the same way.
    Don’t attach the panels to the floor until you’ve fitted your shed roof.
  5. Fit the roof
    • If the shed comes with a support bar, put this in position before you put the roof panels in.
    • Nail the roof panels in place, ensuring there’s a parallel and equal overlap at each end.
    • Roll out some roofing felt from front to back, leaving a 50mm overlap at each side. Secure it with clout-headed felt tacks at 100mm intervals.
    • Apply mastic sealant to the outside corners, then fix each corner trim with 30mm nails.
    • Add the fascias and finials, predrilling 2mm holes to avoid splitting the wood. Nail them through the felt into the shed using 40mm nails.
  6. Add the shed windows
    • Slide each windowsill into the tongue and groove cut out, then put the window cover strip in position, fixing it to the vertical framing.
    • From inside the shed, put the glazing sheets into the window rebates, making sure the bottom edge of the glazing sheets sit on the outside of the sill.
    • Fix the window beading on the top and sides with 25mm nails.
  7. Fix the walls to the floor Before you do anything, make sure you check that the centre marks on the walls line up with the marks on the shed floor. Then fix the wall panels to the floor with 50mm screws, aligning them with the joists.
  8. And that’s it! But if you’re not confident in building a shed yourself, there are plenty of professionals available who will be happy to help.
How to insulate a shed?
If you spend time in your shed, whether you use it as a summer house or an office, you’ll probably want a bit of insulation in there for when it starts to get chilly. There are different ways to insulate a shed, and some aren’t expensive at all. You just need to decide what the best way for you is. Bubble wrap If you don’t spend too much time in your shed, bubble wrap is an easy and cheap way to insulate your shed. Simply attach bubble wrap strips to the framing of the shed to create an air gap, then screw or nail a sheet of MDF over the top. Fibreglass wool Fibreglass wool is a good option if you want to insulate your shed further. Make sure you use safety equipment to protect your eyes, nose, mouth and hands when you’re handling it. Tack a breathable membrane to the inner walls of the shed, then place the fibreglass wool on top. Add a sheet of MDF or wood board, ensuring all the fibreglass is covered. Insulating shed windows and doors You'll often feel draughts through shed windows and doors, and these are easy to block up. You can use foam filler or liquid wool along the edges of the windows and gaps in the door frame. Let it dry out after you’ve applied it then cut off any excess. Insulate the floor If you’re building a new shed, you could fit some underfloor insulation to the grid of the shed base – it could help reduce up to 40% of heat lost through the shed floor. But if your shed’s already built, you can line the floor with a breathable membrane then lay a rug or piece of carpet down. The membrane underneath stops any damp or rot forming, so it’s best not to lay a rug straight down on the shed floor.
Where should I put my garden shed?

Try to put your shed in open space, away from trees, bushes and other buildings. This will help to protect it from falling branches and sap. It will also mean that you can access all sides of the shed for repair and maintenance purposes. Make sure you take a look at garden shed planning rules before you pick a final spot for your shed.

How to dot and dab plasterboard?

How To Dot And Dab A Plasterboard

If you want a fast and simple way to achieve a smooth and sturdy wall which is decoration-ready, then dot and dab plasterboard is the way to go! It’s a relative simple process but can also be a bit challenging. Therefore, if you lack the necessary training or experience, hiring a professional would be a great step to protect your investment and guarantee the best results. Here, we’ll provide you with a deep insight into the plasterboard’s dot and dab procedures. Let’s have a look!

• At the thickness of the board with the adhesive, mark the ceiling and floor as well as the wall to indicate the centre of each board.

• Ensure the wall’s height is 15mm more than the plasterboard

• Make a mixture of the adhesive and achieve a thick consistency. Apply a consistent layer of the mixture around the wall’s perimeter, edge of the ceiling and any other openings with the use of a trowel.

• Select dabs that are about 250mm long and 50mm to 75mm wide and apply the adhesive in them. Make use of 3 vertical rows for individual boards. Also ensure to apply, at skirting level, a band of adhesive.

• Position the board’s reverse side against the dabs, and laying against the packers. Then make the board align with the ceiling and floor marks with the help of a straight edge.

• Raise the board till its tight against the ceiling with a board lifter. Once done, use the plasterboard to wedge the board into place before you remove the board lifter.

• Repeat the same process for the remaining parts of the room. Once completed, make sure the adhesive is set before you remove the boards.

Carpenter help and advice

How it works

Tell us about your Carpenter project

Answer a few quick questions to help us match you with the right Carpenter

Get up to 4 free quotes

Receive no-obligation quotes from 4 Carpenters working in Boldon Colliery.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Carpenter.

Are you a Carpenter in Boldon Colliery?

View our open Carpenter jobs near you

Join today
View Shortlist