Find a Landscaper you can trust in Newbridge.

Choose from 27 Landscapers, all rated by people like you.

Over 92 reviews & an average rating of 4.4/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

Advertisement
View Shortlist
Verified Pro

First Choice Fencing

0 review(s)
Offers services in NEWBRIDGE
First Choice Fencing provides professional fencing and gate installation services across Lanarkshire and the surrounding a...

Active drives

0 review(s)
Offers services in NEWBRIDGE
Hi here at active drives we are a Family run business with over 25 years of experience. no job too big or too small.we h...

Scotia Groundworks

0 review(s)
Offers services in NEWBRIDGE
Small family run business covering all of Scotland. Block paving Asphalt/ tarmac surfacing Patch repair Drainage Wa...
Over 20 Reviews

Ladybug Lady Gardening

23 review(s)
Offers services in NEWBRIDGE
Gardening specialists for over 20 years, Ladybug Lady Gardening can help you transform your Garden into your perfect Parad...
We are a small family based company specialising in property home improvement services. House extensions, renovations, lof...

Recent Landscaper Enquiries

08 Sep

Driveway Repair

Uphall - EH52

Enquiry from: Douglas F

Start Date: Immediate

Lawn Care Lead

Manhole cover in driveway has been pushed downward and buckled into drainage cavity, unable to know if there has been damage to brickwork, manhole needs replaced

Post a similar request >

29 Jun

Garden Maintenance

Inveresk - EH21

Enquiry from: MR I

Start Date: Immediate

Lawn treated,borders tidied

Post a similar request >

30 Apr

Fencing

Salvesen Crescent - EH47

Enquiry from: Joe J

Start Date: Immediate

Single panel fence approximately 2 meters high x 15 meters long, cheapest option

Post a similar request >

24 Apr

Driveway Repair

Silverburn - EH26

Enquiry from: William N

Start Date: Immediate

Couple of damaged paving stones need repaired / replaced. it's best to text me or email me as i have big issues hearing on the phone due to hearing loss and phone app not working properly most of the

Post a similar request >

23 Apr

Driveway Repair

Edinburgh - EH15

Enquiry from: Quamrun A

Start Date: Immediate

Repair the cracks and resurface overall

Post a similar request >

11 Apr

Garden Maintenance

Edinburgh - EH13

Enquiry from: Babu R

Start Date: Immediate

Driveway and pavement including Garden needs to clean and maintain

Post a similar request >

25 Feb

Garden Maintenance

Edinburgh - EH15

Enquiry from: Claire M

Start Date: Immediate

Initial tidy up of front and back gardens then regular maintenance

Post a similar request >

23 Jan

Driveway Repair

Linlithgow - EH49

Enquiry from: Allan B

Start Date: Immediate

I have a manhole cover ( which is block paved ) which has sunk due to car parking. Need the cover removed the drain area repaired/strengthened and made good

Post a similar request >

20 Oct

Fencing

Dunfermline - KY12

Enquiry from: John G

Start Date: Immediate

Approx.36 feet of fencing and supporting posts replaced due to early summer storms destroying existing fencing-approx 2 metres in height

Post a similar request >

24 Sep

Garden Shed

Inveresk - EH21

Enquiry from: Robin J

Start Date: Immediate

4*4 size garden shed. We buy from B&Q .just fixing only How much coast for that one

Post a similar request >

17 Sep

Driveway Repair

Balerno, Currie, Edinburgh, Juniper Green - EH14

Enquiry from: Mel S

Start Date: Immediate

Depressed drain cover on a paved driveway needs to be reset

Post a similar request >

09 Sep

Fencing

Inveresk - EH21

Enquiry from: Alexander S

Start Date: Immediate

I need quotes for digging up and taking away bushes And replacing them with fencing

Post a similar request >

17 Aug

Garden Decking

Balerno, Currie, Edinburgh, Juniper Green - EH14

Enquiry from: Gillian B

Start Date: Immediate

Renew some old lengths of wooden decking

Post a similar request >

09 Aug

Fencing

Dunfermline, Inverkeithing - KY11

Enquiry from: Tom S

Start Date: Immediate

Fencing panel to be reattached to brick pillars

Post a similar request >

06 Aug

Garden Maintenance

Edinburgh - EH48

Enquiry from: Robert H

Start Date: Immediate

Deal with weeds in car park

Post a similar request >

05 Aug

Garden Maintenance

Edinburgh - EH17

Enquiry from: Kate O

Start Date: Immediate

No mowing needed. Pathway needs weeds removed between slabs. Also, bushes need trimmed back and one hedge in back garden needs trimmed. General tidy up please

Post a similar request >

03 Aug

Garden Maintenance

Balerno, Currie, Edinburgh, Juniper Green - EH14

Enquiry from: Anne F

Start Date: Immediate

Someone to maintain garden. it's just recently been done but need someone regularly. i'm asking on behalf of my aunt. phone mobile first time

Post a similar request >

01 Aug

Garden Maintenance

Edinburgh - EH12

Enquiry from: Peter N

Start Date: Immediate

Various areas to tidy and look after if Possible , please visit to see what has to be done

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2026 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Newbridge is:

£1,478

Landscaper job Landscaper cost in 2026
Wooden fencing in Newbridge £1,125-£1,725
Landscaping in Newbridge £2,250-£3,450
Garden maintenance and upkeep in Newbridge £188-£288
Wooden decking in Newbridge £1,125-£1,725
Artificial Grass in Newbridge £3,000-£4,600
Garden shed in Newbridge £450-£690
Garden lighting in Newbridge £320-£480
Driveway repair in Newbridge £1,520-£2,280
Lawn Care in Newbridge £130-£200

Related Landscaper searches in Newbridge

Landscaper FAQs

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
What types of garden fencing are available?

There are quite a few different types of garden fencing that are readily available, so you’ll have plenty to choose from. If you’ve got a strict budget, waney edge panel fencing is a good option. It’s made up of horizontal wood strips and is generally the cheapest type of fencing. Another good option is closed feather-edge panels. These are a really strong type of fence, made up of concrete posts and panels of vertical strips of wood.You can also get more decorative types of fencing with combinations of vertical and horizontal wood strips.

how to repair asphalt driveway depressions?

When your driveway is suffering from depression, it becomes unsafe for driving (a danger zone) and ugly - no homeowner wants that! Unfortunately, most driveways won’t hold flat for long as they tend to develop cracks and potholes pretty quickly. Here, we are going to take you through how to fill asphalt driveways’ depression so as to ensure the sinkholes in your driveway poses no threat to you or your loved ones, while also beautifying your property. The approach to be used depends on the intensity of the depression. If its only a few cracks and holes, this can easily be repaired with some equipment. But if otherwise is the case, then calling a reliable professional will be your best bet. In this article, we’ll show you how to repair dips in your asphalt driveway relatively quickly.

✓ Pick a date with warm and sunny weather. This is because if you work in a cold weather, chances are the materials will freeze and hence, unusable. So find a day when the temperature will over 50 degrees Fahrenheit and below 80 degrees Celsius and when there would be no rain. We’ll advise a day between May to October.

✓ Prepare the area. Remove all loose stones, soil, dirt as well as vegetation from the holes. Once done, you can then proceed to washing the area with a pressure washer or sweep with a broom.

✓ Apply a thin mixture of asphalt to the area. Use a flat stirring stick to coat the low driveway area with a thin mixture of asphalt.

✓ Tamp the asphalt repair mix. Purchase the right kind of asphalt to repair the driveway. Fine aggregate asphalt mixture is more suited to filling small holes, whereas the coarse aggregate is more suited to filling larger holes. Apply layers ( about 2 inches each time) of the asphalt repair mix to the sunken area and use a shovel to give it a smooth finish. Once done, simply make the area smooth and protect it with a piece of plywood. Do not walk or drive on the area for a couple of days.

How to felt a shed roof?
Whether you want to felt a new shed roof or you’re re-felting your existing shed roof, it’s simple when you know how. Read our quick guide to see how easy it is.
  1. Remove any existing fascia boards Remove the fascia boards and the old felt if you’re re-felting.
  2. Measure the shed roof Measure the roof, taking into account that you should leave around 50mm for overlaps at the eaves and 75mm at the gable ends. You’ll probably need 3 pieces of felt, but some smaller sheds only need 2.
  3. Apply felt to the roof Once you’ve cut the felt to size, apply the each piece to the roof, pulling it tight. Then nail along the length of the roof at 100mm intervals. For nails at the bottom edge, they can be wider – around 300mm. If you’re adding a piece of felt in the middle of the shed along the apex, fix it using adhesive, then nail it at the lower edge at 50mm intervals.
  4. Tidy up the overhangs Fold down the felt at each overhang and nail it securely. Cut a slit in the overhang at the apex using a pen knife, then fold that down and nail at 100mm intervals along the gable. If you like, you can add fascia boards to keep the shed looking neat. Use wood nails to secure them and then trim away any excess felt.
That’s it. It sounds scary, but it won’t take you long to felt your shed roof as long as you follow instructions carefully.
How to build a deck frame?
Building a simple deck frame, or decking subframe, that you’re laying on level ground is easy if you take time to prepare and get all the things you need. We’ll go through the steps on how to build a deck frame here. Tools and equipment To get building your deck frame, you’ll need:
  • Decking joists
  • Coach screws
  • Coach bolts
  • Combi drill
  • Socket set
  • A saw suitable for your project and the thickness of the timber
  • Pencil
  • Decking preservative
  • Sandpaper or sander
Build your subframe
  1. Measure your deck frame and cut to size if necessary.
  2. Make 2 pencil marks on each end of the frame’s 2 outer joists to mark where the coach screws will go. They need to align with the centre of the adjoining outer joist. Then, use a flat wood drill bit to drill recesses into each mark. Make them the same depth of the screws that your using’s head and wide enough for a ratchet or socket to tighten them.
  3. Using a thinner drill bit, line up the outer joists and drill a pilot hole through the middle of the recess. These pilot holes act as a guide for the screws and stops them from splitting the wood.
  4. Fit the coach screws with either a drill driver or socket and ratchet.
  5. Repeat the process for the inner joists once you’ve assembled the outer frame.
IMPORTANT: While you’re building your deck frame and the decking itself, remember to cover all pilot holes and ends of timber in decking preservative to ensure that your decking remains structurally sound for as long as possible. Though relatively simple, building a deck frame and the decking will take some time. It would be much quicker and easier to get a professional in to do it, who could represent more value for money.
Can you hoover artificial grass?
While you might see some people hoovering their artificial grass, it’s not recommended. Using a household vacuum cleaner on your artificial grass could suck up and remove the blades of grass, creating patches and making it look as bad as a balding natural lawn. Also, artificial grass blades are made from tough plastics like nylon and polyurethane. The blades could easily clog up your hoover and damage it, so it’s best to steer clear of using it to clean your artificial turf. What can I use instead of a vacuum cleaner? A good old rake or broom can get rid of leaves and debris from your artificial grass, but you may miss smaller pieces like pet hair or sand and gravel. If you have a leaf blower, you can use this on a low setting – but be careful as you could blow away the sand infill that keep your artificial lawn looking springy and fresh. Luckily, there are artificial lawn power brooms available to buy, and this could be a good option over hoovering your artificial grass. They are electrically powered brushes that push away dirt rather than sucking it up, and they can even plump your lawn to keep it looking at its best. Even if you don’t hoover your artificial grass, it’s still likely that over time some sand infill will get carried away. To keep your lawn bouncy, ask your installer to top up the sand every now and again or have a go at doing it yourself.
Do I need to tell my neighbours if I’m going to replace my fence?

It’s a good idea to talk to your neighbours before you start any work to avoid confusion along the way. But if the fence is definitely your responsibility and on your property, there’s no legal obligation to notify them. It’s also a myth that you need to erect a fence with the flush side without posts facing your neighbour’s property.

How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Newbridge.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Newbridge?

View our open Landscaper jobs near you

Join today
View Shortlist