Find a Landscaper you can trust in Bonnybridge.

Choose from 22 Landscapers, all rated by people like you.

Over 172 reviews & an average rating of 4.3/5 stars, you'll find the right pro

Choose and shortlist

Use the shortlist button to select up to 4 tradespeople, enter your project details and press send

or

Keen to get on with the job?

Get up to 4 quotes from local Landscapers near you

View Shortlist

Scotia Groundworks

0 review(s)
Offers services in BONNYBRIDGE
Small family run business covering all of Scotland. Block paving Asphalt/ tarmac surfacing Patch repair Drainage Wa...
Over 20 Reviews

Ladybug Lady Gardening

23 review(s)
Offers services in BONNYBRIDGE
Gardening specialists for over 20 years, Ladybug Lady Gardening can help you transform your Garden into your perfect Parad...

Nomow

1 review(s)
Offers services in BONNYBRIDGE
Nomow supply & install artificial grass & turf throughout the UK. Artificial grass is the perfect solution for architects,...

Recent Landscaper Enquiries

15 Jun

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Michael D

Start Date: Immediate

5m tall 8m wide conifer will need top trimmed down by app*** and trimmed back. in need of care. patches and dead areas. otherwise good there are new shoots from the bottom so there’s life left. are ...

Post a similar request >

09 Jun

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Ayaz H

Start Date: Immediate

tall hedges to be trimmed in the back garden also plants within the garden hedges to be trimmed. are you the property owner: owner garden type: back garden work required: hedges current state of gar...

Post a similar request >

14 Mar

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Bethan N

Start Date: Immediate

moving into council property and grass isnt good in back garden. needs mowed before i aerate it and put down new grass seeds. are you the property owner: tenant (with permission) property type: terrac...

Post a similar request >

27 Feb

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Stuart V

Start Date: Immediate

Need large hedge taken out and desposed off

Post a similar request >

15 Apr

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: Grant M

Start Date: Immediate

Diving fence to be fitted

Post a similar request >

03 Aug

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Pamela Y

Start Date: Immediate

fortnightly grass cutting with trimming and edging are you the property owner: owner property type: detached do you have a: medium size garden garden type: front garden, side garden work required: ot...

Post a similar request >

15 Nov

Garden | Landscaping

Bonnybridge - FK4

Enquiry from: Demi C

Start Date: Immediate

Slabs and chippings put down

Post a similar request >

02 Oct

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: Leanne Y

Start Date: Immediate

I'm looking for a free quote to supply and fit a 6ft fence at both sides of my garden, with a lower gate at bottom of both sides for access.

Post a similar request >

17 Aug

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: Margaret P

Start Date: Immediate

Customer visited the myfencingprices.co.uk site and submitted an enquiry. Property type: House, Property owner: Relative, Panel number: 5+, Work description: I am looking for corrugated sheet panels...

Post a similar request >

18 Jul

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Bill C

Start Date: Immediate

Reduce 30m of Lelandii from 3M to 2M, approx 1.5/2M wide.

Post a similar request >

26 Apr

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: Robert W

Start Date: Immediate

6ft high fence by 38ft long no gaps Are you the property owner: Owner of the property Property Type: Semi detached How many fence panels are you looking for: 5+ Panels What level of service do you re...

Post a similar request >

31 Mar

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Joy M

Start Date: Immediate

We are looking for a general tidy up of our front garden, in particular weeding and pruning, removal of dead plants and roots Are you the property owner: Owner Property Type: Detached Do you have a:...

Post a similar request >

17 Feb

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: Caroline H

Start Date: Immediate

Replace fencing that has been blown over in the wind. Are you the property owner: Owner of the property Property Type: Detached How many fence panels are you looking for: 5+ Panels What level of serv...

Post a similar request >

04 Feb

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: E D

Start Date: Immediate

Homeowner Supplied and fitted Please contact to appoint *

Post a similar request >

31 Jan

Fencing | Wooden

Bonnybridge - FK4

Enquiry from: E D

Start Date: Immediate

Homeowner Supplied and fitted Please contact to appoint *

Post a similar request >

10 Jan

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Aimee B

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Detached, Work description: 10 foot hedge roughly around 8 meters long. Overgrown into the walkway. Would o...

Post a similar request >

30 Apr

Garden | Maintenance & Upkeep

Bonnybridge - FK4

Enquiry from: Margo D

Start Date: Immediate

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Other, Work description: Not able to make a start on my garden needs grass cut and borders dug. Bark renewe...

Post a similar request >

23 Apr

Garden | Landscaping

Bonnybridge - FK4

Enquiry from: Elizabeth W

Start Date: 1 to 3 months

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Some artificial grass laid and some stones laid to make back garden maintenance ...

Post a similar request >

20 Apr

Garden | Landscaping

Bonnybridge - FK4

Enquiry from: Elizabeth W

Start Date: 1 to 3 months

Customer visited the mygardeningprices.co.uk site and submitted an enquiry. Property type: Terrace, Work description: Some artificial grass laid and some stones laid to make back garden maintenance ...

Post a similar request >

12 Apr

Garden | Sheds

Bonnybridge - FK4

Enquiry from: David M

Start Date: Immediate

Hi, I am looking for a price for a 10x8 Tongue & Groove Shed. I am searching for a secure shed with no windows. please send as much detail as possible. thank you Davie

Post a similar request >

How much do Landscaper services cost?

How much do Landscapers cost? Prices for Landscapers in 2026 can vary depending on the type of work that you want to have performed in your home.

If you’ve decided to hire a landscaping professional for your outdoor area, you’ll probably be wondering how much it’s going to cost so you can start planning. A landscape garden serves a wide range of purposes from beautification of your surrounding and building to serving as a perfect spot for family and friends’ get-togethers and to brighten up one’s life. However, we must also note that the landscaping does not come cheap. In order to make it look great and send a clear message, there’s need for an effective and careful planning as well as consideration which perfectly combines both beauty and utility (as not every landscaping idea works perfectly for every house). So, just how much do landscapers charge?

Just like most home improvement projects, the price of charged by landscapers is influenced by a wide array of factors. These factors include the scope of the project, the size of the landscape, the type of material and size of your patio, the cost of the plants and mulches, the professional daily or hourly rate as well as the unique treatment of the aesthetics of planting.

In general, landscapers can charge as little as a price ranging from £15 to £20 and £45 per hour greatly influenced by the location as well as the landscaping services required. As a daily rate, professional landscapers tend to charge about £140 to £200 per day. However, it should be noted that the major factors influencing the price that a landscaper will charge is based on the area you live in as well as the size of your garden. For instance, if you live in an area with higher demands like London, you can expect to be charged a lot more than anywhere else.

The table reveals the sorts of work that Landscapers commonly do and also the typical cost range of these projects. Some jobs take longer to finish than others so prices do differ by task.

View our Landscaper cost guide View our Landscaper advice

The average price
of a Landscaper in Bonnybridge is:

£1,478

Landscaper job Landscaper cost in 2026
Wooden fencing in Bonnybridge £1,125-£1,725
Landscaping in Bonnybridge £2,250-£3,450
Garden maintenance and upkeep in Bonnybridge £188-£288
Wooden decking in Bonnybridge £1,125-£1,725
Artificial Grass in Bonnybridge £3,000-£4,600
Garden shed in Bonnybridge £450-£690
Garden lighting in Bonnybridge £320-£480
Driveway repair in Bonnybridge £1,520-£2,280
Lawn Care in Bonnybridge £130-£200

Related Landscaper searches in Bonnybridge

Landscaper FAQs

How to build a shed base on uneven ground?
Building a shed base on uneven ground can be as easy as digging out a sub-base and checking that it’s level. You can dig down until the soil is light brown and rather compact, then work out where the ground is uneven and move soil around to compensate. Add a weed-blocking membrane down then put plastic grids in to act as your shed base or continue to make a sub-base for paving slabs or concrete. However, you could also build a timber shed base on uneven ground using concrete blocks to level it out.
  1. Mark out the area and dig the top layer of soil, trying to get the ground as flat as possible.
  2. Build a timber frame to size.
  3. Measure out 4 rows of 3 blocks to create good weight distribution and lay in place.
  4. Underneath each block, dig around 50mm wider than the blocks and about 150mm deep. Fill the hole with pea gravel until it’s flat.
  5. Place timber planks along the rows of blocks and see how level it is. Add or remove blocks where necessary. If it’s only a small difference, use shingle underneath the timber until it’s level.
  6. Nail your timber shed base to the timber planks to create a sturdy base for your shed.
If you’ve got any questions about building a shed base on uneven ground, it’s best leaving it to the pros. Get in touch with a range of builders who will be able to offer you a quote.
How to make steps for a deck?
Unless you built a ground-level deck, you’re going to need steps to go with it. Check Building Regulations to see if you need to install handrails as well. It’s good practice to:
  • Have a step tread width of 900mm – if you don’t want them that wide, they should be no less than 760mm
  • Add a central step riser to stairs wider than 900mm to prevent them buckling
  • Add a step depth (the vertical distance between each step) of between 150 and 180mm if building your own riser, so the steps are at a comfortable depth
Getting started To build your steps for the deck, you’ll need:
  • Step treads (the actual step themselves)
  • Step risers
  • Coach screws
  • Deck screws
  • Saw
  • Drill
Make the steps for your deck
  1. Make sure the ground where you want to put your steps is level and firm. If it’s not, consider laying concrete or paving slabs to provide a secure surface for your steps to sit so they don’t sink.
  2. Grab some joist off-cuts and cut them to the same width as your step treads. Attach them to the step risers at the top and bottom using countersunk coach screws.
  3. Place the steps against the sub-frame of the deck; if you’ve put slabs down for support, make sure the steps sit in the middle of them. The longest edge of the stair riser should be on the slabs, and the short edge against the deck. Drill pilot holes through the step and sub-frame joist, then screw the step to the sub-frame with more coach screws.
  4. After drilling pilot holes, screw the treads into the risers at each end with deck screws.
  5. If you don’t want gaps between each stair, you can add joist off-cuts or deck boards. Measure the height and depth of the gap, then screw the off-cut or board into the step riser with two screws at each end.
When is the best time to carry out gardening work?

Different types of gardening work will need to be carried out at different times of the year. Garden maintenance is a year round job, although the amount of work will usually decrease during the winter. For larger landscaping projects, aim to have these done through autumn, winter and early spring, to give plants time to get established before summer. Be aware that poor weather over winter can slow down the work.

How to build a fence?

The best way to build a fence depends on what style it is, as different types have different components. However, fencing made up of posts and panels is pretty common. To put this up, you’ll need to start by measuring out and digging holes for your fence posts. Then you’ll need to fit the panels between them and use concrete to secure the posts in the ground.

how to repair sunken concrete driveway?

How To Repair Sunken Concrete Driveway

If you have concrete driveway that’s cracked, uneven and mostly especially sunken, you’d know how distasteful it can be just viewing it on your property. A sunken concrete driveway is most likely caused by rainwater erosion removing the soil under it or a big root under it which as rotted over time. Another possible cause of the sunken concrete is an improperly prepared base which implies that the soil beneath wasn’t fully compact when the concrete was poured on it. Later on the soil beneath will eventually settle and shift below the concrete driveway which weakens the integrity of the entire driveway, making it more vulnerable to cracks, unevenness and sunken.

Two ways in which you can fix this problem includes either demolishing the whole driveway, re-compact the soil underneath and fill with new concrete or repair the entire driveway using an easy process called slabjacking. In this article, we’re going to look at the slabjacking repair process as it’s significantly less expensive than the demolishing approach and will also cause minimal disruption to your lifestyle.

Also referred to as mudjacking or concrete lifting, slabjacking is simply a process used to float your existing concrete back to its original position. If you are not a competent DIYer or lack confidence to pull this off, we’d recommend reach out to a professional for help. If otherwise, then you can practice the slabjacking process given below.

✓ Drill holes through the slab.

✓ Pump grout mixture through the holes. This mixture will spread out beneath he driveway and raise it up.

✓ Lastly, fill the holes and level the concrete driveway surface.in such a way to hide the signs of the repair made.

This is a process that works to efficiently get your driveway back in a top condition relatively quickly.

How to dismantle a shed?
It can seem daunting to dismantle a shed when you want to get a new one or just get rid of it for good. Every shed is different and is likely to have been put together in a different way, but there are some general rules that you can follow to make dismantling a shed a simple task.
  1. Remove fascias and trims Unscrew or prise off the screws and nails fixing the trims and fascias to your shed.
  2. Take off doors and remove windows Unscrew hinges from doors and take them off. Remove all metalwork once the door is off. If you’ve got frames on your windows, unscrew these, and remove the panes. Be extra careful if your windows are made of glass.
  3. Take off the roof Prise off the tacks from the roofing felt and take the felt off – you can’t reuse it, so you’ll need to throw it away. Unscrew the screws on the roof boards and slide them off the shed’s frame – you might need a friend to help you do this.
  4. Take out the roof brace (optional) If your roof has a brace, unscrew the brackets that hold it to the side of the shed. Remember not to lean on anything once you’ve taken the brace off as the walls might be wobbly.
  5. Unscrew the frame from the floor Remove all the screws that are holding the shed to the base, remembering not to lean on the walls.
  6. Unscrew the frame corners Starting at the corner of the front gable, remove the screws where the panels meet. Once a panel is free, lift it carefully out of the way so you can carry on with the others.
Tidy up all your tools and debris, clearing the area to make it safe, and you’re done!
How to fit composite decking?
Fitting composite decking is similar to installing timber decking, but there are some small differences in terms of the gaps you need to leave between boards and the screws you use. We’ll go through a quick guide to show you the process involved in fitting composite decking so you can decide whether it’s something you want to do yourself. Prepare the area Prepare the area according to our instructions in the previous FAQs – or you can use an existing patio or concrete base if you have one. Measure and mark out the area using chalk (if using an existing base). Assemble the decking frame Build the outer frame as we show in our FAQs above; if the area you have planned is longer than your joists, you’ll need to join them together. When you’ve built the frame and it’s secure, ensure that it’s at the right level for water runoff and add risers, slabs or treated off-cuts of timber at 500mm intervals if you need to. Add joists The spacing of your joists will depend on the type of design you have chosen for your composite decking. If you’re laying arched boards horizontally, you’ll need to space the joists 300mm apart. Lay your composite decking boards
  1. If you’ve not got an overhang or it’s a fixed deck, fit starter clips along the outside edge of the frame and secure with screws provided with the composite decking. If you are working with an overhang, put the first board into position not exceeding 25mm. If you’re adding a fascia, put an off-cut of board under the overhang so you know it’ll be flush with the fascia.
  2. Pre-drill all fixing points, measuring in 30mm from the edge of the board. Secure the board to the joist below with composite decking screws.
  3. Slide a hidden fastener clip in so it sits within the groove of the deck board. It needs to be in the centre of the joist to keep the boards secure and ensure an expansion gap of 6mm. Tighten the clips until just tight, and repeat so there’s a clip at every joist.
  4. Add the next board, ensuring that the fastener clips sit within the groove – make sure you don’t force it. Repeat step 3.
  5. Continue steps 3 and 4 until you’re at the final board, which you should secure in the same way as you did the first.
Add a fascia board If you’re adding a fascia, measure in 40mm from each end and add two guide marks: one at 40mm from the top and the other at 40mm from the bottom. Connect the marks, then mark at 300mm intervals down the board. Drill pilot holes, then put the fascia board into position. You need to make sure that there’s a 40mm ventilation gap between the bottom of the fascia and the ground. Ask someone to hold the board level until you’ve finished securing it with composite decking screws; you can get colour-matched ones so they don’t look unsightly at the end of your decking. Not so sure you want to carry out such a big project yourself? Get quotes from decking pros who will be able to fit composite decking much more quickly and easily.
How much is artificial grass?
How much artificial grass costs depends on the quality of grass you choose, how big the area to be covered is, and whether you choose to have it installed or do it yourself. On average, you should expect to pay between £25 and £70 per m2 to have artificial grass installed by a professional. That means a 30m2 artificial lawn would cost between £750 and £2,100. So what will affect how much artificial grass costs? The quality of the artificial grass The quality of the artificial turf makes a big difference to the price. The lower end of the price range might not be quite right for a garden, since they often look extremely fake, and won’t last as long. Somewhere in the middle of the range should give you a good, long-lasting look without breaking the bank. Quality of the sub-base If you’re laying artificial grass on an existing lawn, this will need to be dug up to level out the area and add a weed-resistant membrane, creating what's called a sub-base. On average, the materials will cost £247 to make a sub-base. Whether you’ll need waste removal If you’re digging up the existing lawn or removing paving slabs to create a new sub-base, you might need a skip. A typical 4-yard skip will set you back around £220. Whether you’re doing DIY If you fancy having a go at laying your own artificial grass, you’ll of course save on labour costs. You’ll need to weigh up the benefits of DIY against the risks that the finish might not look as good or the grass might not last as long. But if you choose an average-quality artificial grass at £15 per m2, 30m2 of artificial grass will cost £450 not including the underlay as well as joining tape and adhesive.

Landscaper help and advice

How it works

Tell us about your Landscaper project

Answer a few quick questions to help us match you with the right Landscaper

Get up to 4 free quotes

Receive no-obligation quotes from 4 Landscapers working in Bonnybridge.

Pick the right pro for you

Compare prices, customer reviews and services, and hire the right Landscaper.

Are you a Landscaper in Bonnybridge?

View our open Landscaper jobs near you

Join today
View Shortlist